INFRASTRUCTURE DEVELOPMENT
The Presentation
•
•
•
•
•
•
•
Introduction
Project Objective
Infrastructure Activity
Institutional Strengthening
Contract Packages
Benefits
Project Timelines
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
Safety Tip
I.
II.
III.
IV.
Electrical
Falls
Struck by
Excavations
and
Trenching
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
3
Urban Water Management
Water
Supply
Sanitation
Drainage
The Lusaka Water Supply, Sanitation and Drainage
Project ( LWSSDP)
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
4
LWSSDP PROJECT
OBJECTIVES:
• To expand access to, and improve reliability of, water supply
and sanitation
• Improve drainage services in select urban and peri urban
areas of the city of Lusaka
• To decrease the incidence of waterborne and water-related
diseases
• Generate time savings for households and businesses and
• Reduce non revenue water in the water supply network
The project consists of two components:
1. Infrastructure Activity
2. Institutional strengthening Activity
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
5
INFRASTRUCTURE
ACTIVITY
The Lusaka
LWSSD project
focuses on the
City of Lusaka
with the following
components:
Lusaka City
•Water Supply
•Sanitation
•Storm-Water
Drainage
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
6
INFRASTRUCTURE
Cont’d
• Core Water Network Rehabilitation
• Chelston distribution line rehabilitation and expansion
• Chelston and Kaunda Square Sewersheds rehabilitation
and expansion
• Central distribution line rehabilitation and expansion
• Bombay drain improvements
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
7
INSTITUTIONAL
STRENGTHENING
• Asset Management -LWSC
• Maintenance Management -LCC
• Environmental Management
• Gender Mainstreaming
• Information ,Education & Communication Programme
• Innovations & Grants
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
8
ENVIRONMENT & SOCIAL
PERFORMANCE
• Manage environmental & social risks (including Resettlement) and
impacts of the Compact according to IFC Performance Standards
• Maximize benefits & minimize adverse impacts
• MCC Environmental Guidelines: “..to ensure that the projects funded
under Millennium Challenge Compacts are environmentally sound,
are designed to operate in compliance with applicable regulatory
(Zambian) requirements, and, are not likely to cause a significant
environmental, health, or safety hazard”
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
9
SOCIAL AND GENDER
ASSESSMENT
• Social and Gender integration across the compact
• Identify approaches for regular, meaningful and inclusive
consultations with women and other vulnerable/ under
represented groups
• Social inclusion ,Gender mainstreaming including IEC
Institutional support
• Ensure that Contactors and Consultants adhere & comply
with requirements in the SGIP
• Gender and social integration (including HIV/AIDS)
through development of site specific ESMPs (working with
ESP)
• Adhere to MCC Gender Integration guidelines and
operational procedures
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
10
INNOVATIONS & GRANTS
• Novel feature of LWSSD Project
• Supports Competitive grant & Partnership
Program
• Supports Innovation & Entrepreneurship
• Goal –Increase & sustain access to quality water
& sanitation.
• Target group-women, youths & vulnerable
groups
• First call of proposals expected in October 2014
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
11
MONITORING AND EVALUATION
• Project Evaluation to show results
• Implementation Monitoring to show progress
towards objectives
• Economic analysis
• Support evidence-based decision-making
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
12
CONTRACT PACKAGES
Notation
Description
CP1
Iolanda Chilanga Pipeline Rehabilitation and
Rehabilitation of Distribution Centres (7C, Woodlands,
Waterworks, Lumumba, Stuart Park East, Stuart Park
West, Chawama, Chelston and Mass Media )
CP2
Construction of Lumumba, Roadside and Kamloops
Pipelines
CP3
Water and Sewer Reticulation in the Kamanga,
Mtendere, Kaunda Square and Chelston Areas
CP4
Kaunda Square Waste Stabilization Ponds
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
13
CONTRACT PACKAGES
Cont’d
Notation
Description
CP5
Water Reticulation in Ndeke, Kwamwena, SOS Village,
Chipata and Ng’ombe
CP6
Non-revenue water reduction projects
CP7
Bombay Drainage Project North
CP8
Bombay Drainage Project South
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
14
Benefits
•
•
•
•
•
•
New Services
Improved service level
Longer hours of service
Reduced risk of loss
Reduced flood damage
Reduce business down
time
1.2 Million People
Reducing Poverty Through Economic Growth
1200 Twikatane Rd, off Addis
Ababa Drive
15
TIMELINES OF LWSSDP
15/11/18
Five (5) year fixed
implementation
period
2015
Commencement
2014
15/11/13
Project Closure
Procurement
Entry into force
Detailed Designs
2012
Feasibility Studies
Pre-Feasibility Studies
2011
Priority Projects
Masterplans
2010
Concept Development
Needs Analysis
2009
-
Project Identification