Transcript Title
CMBG 2005 Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee July 21, 2015 Cleveland 2005 1 CMBG 2005 CMBG Mission “To provide a forum for the exchange of information which is useful to practitioners of nuclear facility configuration management and to act as the CM Community of Practice for the nuclear industry. July 21, 2015 Cleveland 2005 2 CMBG 2005 Community of Practice – A Community of Practice (CoP) is an industry peer group of experts in a process or sub-process defined in NEI’s Standard Nuclear Performance Model. The group serves as the owner of that particular process or sub-process, managing the solution of issues for the industry in that area. NEI assesses CoP development based on six attributes: formation of a leadership team, a charter, cost definitions, process descriptions, definitions of performance indicators and performance improvement projects. July 21, 2015 Cleveland 2005 3 CMBG 2005 Industry CM Issues • • • • • • • Margin Management Fuel Performance Performance Indicators New NRC Engineering Inspections IT cost/benefit Process Orientation Eastern European plants and risk July 21, 2015 Cleveland 2005 4 CMBG 2005 Current Initiatives • Planning for 2006 CMBG conference (June) in Richmond hosted by Dominion Energy. • Integrate CM/IM/IT Processes and resolve interface conflicts. • Complete revision to INPO AP-929 using CM Process model that agrees with NEI Standard Nuclear Performance Model • Pilot program to make CM performance indicators “workable and visible” July 21, 2015 Cleveland 2005 5 CMBG 2005 AP-929 Team • • • • • • • • Gary Bal- INPO Mike Stout- Spescom Software, Inc. Keith Reinsmith- PPL Susquehanna Rick Harris- Duke John Parler- VC Summer Bob Hess- Diablo Canyon Larry Kidd- Dominion Energy Tom Czerniewski- Indian Point July 21, 2015 Cleveland 2005 6 CMBG 2005 Project Motivation • CMBG 2001 Participants wanted focus on ANSI/NIRMA CM 1.0-2000 concepts and terminology • ANSI standard addresses “Objectives” and program elements • Worked with NEI on SNPM • Now working with INPO on AP-929 July 21, 2015 Cleveland 2005 7 CMBG 2005 The CM Objectives Design and License Requirements Must Conform What is required to be there Must Conform Facility Configuration Information Design Information Must Conform Physical Configuration What is there July 21, 2015 Operational Configuration Info Operating, Maintenance, Training & Procurement Information Work processes must ensure that: Elements conform or deviations are identified. Conformane deviations ae tracked to closure. All changes are authorized Conformance is auditable. Cleveland 2005 What we say is there 8 CMBG 2005 CM Process Model • High level model • integrated processes used to return to CM ‘objective’ when change occurs. • developed in early 2002 by CMBG task force. • influenced content of industry guidance documents: • NEI Standard Nuclear Performance Model • INPO Operation Excellence Outcomes enablers • used by CMBG to develop CM Performance Indicators • AP-929 further details this model July 21, 2015 Cleveland 2005 119 CMBG 2005 CM Process Model Evaluate Identified Problem or Desired Change CM Equilibrium CM001* Change Design Requirements ? No Change Physical Configuration ? Yes Yes Design Requirements Change Process Physical Configuration Change Authorization Process CM002 * CM003 * No Change Facility Configuration Information ? No Do Nothing More Yes Facility Configuration Information Change Process CM004 * * CM sub-processes agree with NEI Standard Nuclear Performance Model July 21, 2015 Cleveland 2005 10 CMBG 2005 TABLE OF CONTENTS 1. 2. 3. 4. 5. 6. 7. 8. 9. FOREWORD TABLE OF CONTENTS FEEDBACK AND COMMENTS PROCESS INTEGRATION DEFINITIONS CONFIGURATION MANAGEMENT OBJECTIVES CONFIGURATION MANAGEMENT PROCESS FLOWCHART CONFIGURATION MANAGEMENT ACTIVITY DEFINITION APPENDICES July 21, 2015 Cleveland 2005 11 CMBG 2005 DEFINITIONS • • • • • • • • • • As-built As-designed As-found Authorization Basis Information Design Authority Design Bases Design Information Design Input Design Output Design Requirement July 21, 2015 Cleveland 2005 12 CMBG 2005 DEFINITIONS (continued) • Facility Configuration Information • Graded Approach • Non-conformance • Operational Configuration • Operational Configuration Information • Physical Configuration • Structure, System, or Component July 21, 2015 Cleveland 2005 13 CMBG 2005 APPENDICES • A Flowcharting Conventions • B Design Basis • C Well Managed Margins • D Plant Modification Process Example • E Performance Indicators • F References July 21, 2015 Cleveland 2005 14 CMBG 2005 AP-929 revision status • • • • • • • • • Team met at INPO in late August 2004 Model and outline completed Added a level of detail to model Mod example moved to Appendix Review by team complete. INPO review cycle, editorial changes. Will be on INPO website for comment Will notify all in CMBG database Expect issue by 3rd Qtr 2005. July 21, 2015 Cleveland 2005 15