PRESENTATION ELECTRONIC FORM SOLUTION RAF201300020 23 jULY

Download Report

Transcript PRESENTATION ELECTRONIC FORM SOLUTION RAF201300020 23 jULY

Electronic Form Solution: RAF/2013/00020 Compulsory Briefing Session The Road Accident Fund 23 July 2013

AGENDA

1 .

Welcome 2. Introduction of the RAF members 3. Circulation of Attendance Register 4. Presentation By RAF : a) b) Procurement – Process and Compliance ICT Department -Scope/specification 5. Q & A 6.

Closing

Details of the Bid REQUEST FOR PROPOSAL:ELECTRONIC FORM SOLUTION

Compulsory briefing session 23 July 2013.

Published 12 July 2013

Closing date 06 August 2013 .

All questions / enquiries outside this forum will be via email to: [email protected]

not later than 11:00 on 26 th July 2013

Questions/ Answers will be published on the RAF Website on 29 th July 2013.

BACKGROUND

Road Accident Fund (RAF) wishes to develop an online claims e-form. The RAF therefore, requests proposals from bidders who are able to develop and provide the E-forms Solution that will allow claimants to capture their claims online.

Compliance

Compulsory Documents (Valid & Original Tax Clearance Certificate)

Page 5-Checklist of documents to be submitted

Please ensure that the bid document is signed where required

Completed bid and response to evaluation must be submitted

Evaluation Criteria Mandatory Requirements

• The following specific requirements must be met by the bidders and it will be expected of bidders to supply proof or confirm their commitment where applicable.

The bidder must provide a Project Manager with a relevant Project Management Qualification. (Kindly attach proof of qualification) • The bidder confirms that it has read and understands the terms and conditions set out in the attached Service Level Agreement (SLA) (Annexure J) which terms and conditions the bidder accepts, in the event that the RAF awards a contract to the bidder pursuant to this bid. The Initialled Draft SLA by the bidder must be attached to the bid response in duplicate. (please mark the appropriate box) • Failure by the RAF and the successful bidder to conclude a contract within sixty (60) days following the issuing by the RAF of the award letter to the successful bidder, will result in the bid being deemed to be non-responsive which will then entitle the RAF, at its sole discretion, to consider other responsive bids and award the tender to another bidder or bidders. (please mark the appropriate box)

NB:FAILURE TO COMPLY WITH ALL OF THE MANDATORY EQUIREMENTS WILL LEAD TO DISQUALIFICATION

Technical / Functional Requirements The technical criterion that will be utilized to test the capability of The service providers please see circulated copy for details.

Technical criterion will be evaluated against the following detailed requirements: The bidder will be evaluated and scored on five elements with a total of 100 points, Threshold: All bidders who score 60 or more out of 100 points will be shortlisted for Price and BEE.

Evaluation 90/10 principle will be used.

Price and BEE

Bid response format to be strictly adhered to for easy reference

Please see circulated document

SPECIFICATION

Please see circulated copies

QUESTIONS

?

THANK YOU