BaBar-Grid Status and Prospects

Download Report

Transcript BaBar-Grid Status and Prospects

BaBar-Grid Status and Prospects

Eleonora Luppi Padova 16 ottobre 2003

1

Distributed Computing

• • •

Currently BaBar has a largely distributed computing system 5 Tier-A sites

– –

Sites that provide large resources for BaBar Resources agreed to via MoUs >20 Tier-C sites

– –

University sites Produce majority of BaBar Monte Carlo

1

Motivation

• • •

Three large analysis sites

Would like to be more flexible too and use other sites

Need way for users to automatically submit jobs that run where the data and cpu is available

Also intend that GridKa is only available via grid technology Could reduce the manpower used to run Simulation Production

– –

Each of 25 sites has ~0.5FTE to keep system running Go to great lengths to make sure everything is identical Data distribution to smaller sites could be integrated

1

CE: Computing Element RB: Resource Broker RC: Replica Catalogue SE: Storage Element WN: Worker Node VO: Virtual Organisation Also CE & SE Bristol CE &SE 1

Present Infrastructure

• • • • •

SLAC

will install LCG-1

SLAC/SCS actively involved in security for Grid (PPDG and LCG) Karlsruhe

LCG-1 User Interface installed and LCG-1 deployed France

Still nothing released for users INFN

LCG-1 installed in Ferrara (Grid.it)

Genius interface developed under EDG 1.4.x is migrating to new release UK

– – –

EDG 2.x installed. RB at Imperial College installed Imperial College will have a LCG-1 RB soon

1

1

BaBarGrid Analysis

• •

Successful test using EDG v 1.4.x

Prepare executable locally

– –

Copy executable to SE and register to RC Prepare JDL to select CE with a close SE where the executable is available

– – –

Copy executable to WN Run and produce ntuple Copy ntuple to close SE and register to RC The aim is to reproduce this procedure using LCG-1

1

1

Simulation Production (SP)

• • • •

Monte Carlo runs at 25 sites

Includes all Tier-As Generate three times the hadronic rate MC Data is largest part of computing resources

Generation, analysis, disk/tape, ...

Managed centrally

Allocations, modes, luminosity weighting

1

BaBarGrid MC Production

• • •

MC production system already tested on EDG v 1.4.x ported to LCG-1

BaBar MonteCarlo Production rpm is already included in Grid.it distribution First tests started ( in Ferrara, Padova, Legnaro, Milano, Trieste, Napoli, Bologna, Bari and Catania). Genius is migrating to the new release with a basic set of services for MC

1

Future Plans

• • • • • • • • • •

11/2003: Genius running under LCG-1 with a more complete set of services for MC production 12/2003:

MonteCarlo Simulation Grid in production in a few sites Objectivity federations accessible in different sites 01/2004: A full scale analysis running on Grid and producing physics results (~10000 8 hour CPU jobs producing ~500 GB of output) New security method being deployed at SLAC in next few months (Virtual Smart Cards) 02/2004: LCG-1 deployed at SLAC BaBar RB installed at Ferrara 02/2004: MC in production in a larger number of site Analysis package tested and ready Increasing in BaBarGrid resources RC integrated with the BaBar book-keeping system (discussion in progress)