スライド タイトルなし

Download Report

Transcript スライド タイトルなし

Taiwan ESCO International Conference
The business promotion experience of
FESCO in Japan
September 22, 2000
at Taipei International Convention Center, Taiwan
Kenzo Tsutsumi
President of
1
Today’s Presentation
1. Starting ESCO business in Japan
2. FESCO Corporate Structure
3. Business Policy & Strategy
4. Standard Energy Service Process
5. Target Market (Industrial, Commercial,
Institutional & Government)
6. Project Examples (Energy Audit & Services)
7. Critical Success Factors for ESCOs
2
Starting ESCO business in Japan




2-years Consortium for start-up
Pros & Cons for ESCO business
FESCO was started on May 1997
Social changes: strong pressure for
energy conservation
– COP3 was held at Kyoto on Dec. 1997
– New energy conservation low on April 1999
– Deregulation of electric market on March 2000 etc.
3
FESCO
Corporate structure -1

Network alliance corporation
– 15 SPPNs & PPNs for vertical integration
PPN
SPPN
Monitoring
Verification
Project
Development
FESCO
Construction
Management
Energy
Survey
Maintenance
Manufacture
Finance
Contractor
Engineering
SPPN: Special performance partner network (Shareholders of FESCO)
PPN: Performance partner network (Affiliated members)
4
FESCO
Corporate Structure -2


HQ : only 7 to 8 employees
15 Satellites at affiliated SPPNs
–
–
–
–
–
–
–
Engineering : 4 companies
Construction : 1 company
Air-conditioning & Electricity : 5 companies
Finance : 1 company
Facility management : 2 company
Control : 1 company
Marketing : 1 company
5
Business Policy & Strategy

FESCO as “ Facility Doctor ”
– Comprehensive energy saving approach
•
•
15 SPPNs cover for different fields
Other PPNs for the other fields
- Swage treatment / Waste management
- Heat insulation / Energy supply business
– Energy survey in neutral position
•
•
•
•
Don’t stick to one solution
Don’t sell one appliance
Give sophisticated TCO solution to every client
Flexible financial services
6
Standard Energy Service Process
4 Steps
Project
Detail
Survey
Walk
through
DES
EER
ESA
M&RS
CM
M&O
0.5 to 1.5 yrs
7
Target Market Identified
3-year FESCO Experiences

Industrial :
– 70% of projects

Commercial :
– 20% of projects

Sales US$8.5 mil.
Sales US$1.0 mil.
Institutional & Government :
– 10% of projects
Sales US$2.5 mil
8
Target Maket - 1
Industrial Energy Saving Measures & Needs

Higher quality & productivity
– Low costs: 3 to 5-year payback
– Higher operating rate facilities preferable (24hrs, 365days)

Demand side ESMs :
– Facility energy: Lighting / Air-conditioning / Motor control etc.
– Production energy: Compressor / Boiler / Furnace / Machine etc.
– Other points: Production control system / Maintenance etc.

Supply side ESMs :
– Co-generation / Ice storage system / Green energy etc.
9
Target Maket - 1
Industrial Barriers & Countermeasures

Project investment horizon is short
– Select short payback ESMs / Planning is important

Industrials have access to low cost capital
– Use their own capital instead

They have good technical knowledge
– Work together / Support positioning

They understand the real costs
– Break down your pricing & let them choose

They will steal ideas & do it themselves
– Request a consulting fee / Letter of intent
10
Target Maket - 2
Commercial Energy Saving Measures & Needs

Reduce operating costs (Higher operating
income / profit)
– Lower energy / maintenance / water consumption / sewage costs
– Higher operating rate preferable : Hospitals & Hotels

Demand side ESMs :
– Facility energy: Lighting / Air-conditioning / Motor control etc.
– Other points: Total facility management / Maintenance etc.

Supply side ESMs :
– Co-generation / Ice storage system / Green energy etc.
11
Target Maket - 2
Commercial Barriers & Countermeasures

Low motivation for energy saving
– Regulation & promotion needed / subsidies

Tenant occupied bldgs less concerned
–
–
–
–

Utitily billing for energy services
Sign ESA with each tenant
Limit project common areas
Focus on owner occupied facilities
Professional real estate managers
– Do they have incentives for cost down?
12
Target Maket - 3
Institutional & Government ES Measures & Needs





Show the leadership for Energy Saving
Funds to pay for the improvement
Turnkey solution
Increased quality & safety
Demand & Supply side ESMs :
– Same as the Commercial facility
– Lower operating rate / Longer payback period
– Government subsidies needed
13
Target Maket - 3
Institutional & Government Barriers & Countermeasures

Will require competitive bid
– Request the turnkey bidding system (Design + construction )

Bureaucracy will slow things down
– Get inside the bureaucracy

Customers are often less flexible
– Work with their problems & restrictions

Lack of technical & financial sophistication
– Can be an asset for ESCO
– Simplify financial aspects (Single year accounting)
14
Energy Audit Example - 1

Chemical Plant
– Annual expenses for electricity & fuels: US$ 8 mil.
– Annual electricity usage : 23 GWh

Proposed results:
– Expected energy cost reduction : US$ 3.6 mil. (45% of total)
– Required initial investment : US$ 13.8 mil. (3.8 yrs)

Proposed ESMs:
– Effective lighting system / Auto-condenser / Heat recovery
system for exhaust air / Motor inverter control / Roof
insulation / Co-generation / Effective swage treatment /
Monitoring etc.
15
Energy Audit Example - 2

Semiconductor Plant
– Annual expenses for electricity & fuels: US$ 22 mil.
– Annual electricity usage : 125 GWh

Proposed results:
– Expected energy cost reduction : US$ 4.4 mil. (20% of total)
– Required initial investment : US$ 12.5 mil. (2.8 yrs)

Proposed ESMs:
– Effective Clean room system / Effective lighting system / Autocondenser / Motor inverter control / Co-generation / Icestorage system / Effective water treatment / Monitoring etc.
16
Energy Service Project Example - 1
Industrial - Computer device manufacturing

Project scale:
– Annual expenses for electricity & fuels: US$ 3 mil.
– Annual electricity usage : 17 GWh

Contracted numbers:
– Expected energy cost reduction : US$ 150 K (5% of total)
– Required initial investment : US$ 850 K (5.8 yrs)

Installed ESMs:
– Effective lighting system / Motor inverter control system /
Renewal to Turbo compressor
17
Energy Service Project Example - 2
Commercial - Office building in Tokyo

Project scale:
– Annual expenses for electricity & fuels: US$ 550 K
– Annual electricity usage : 2.3 GWh

Contracted numbers:
– Expected energy cost reduction : US$ 76 K (14% of total)
– Required initial investment : US$ 300 K (3.9 yrs)

Installed ESMs:
– Effective lighting system / Air-conditioning inverter control
system
18
Energy Service Project Example - 3
Institutional - Municipal Hospital

Project scale:
– Annual expenses for electricity & fuels: US$ 2 mil.
– Annual electricity usage : 11 GWh

Contracted numbers:
– Expected energy cost reduction : US$ 200 K (10% of total)
– Required initial investment : US$ 1.5 mil. (7.5 yrs)
– Got 0.5 mil. Government subsidy (Actual payback 5.0 yrs)

Installed ESMs:
– Effective lighting system / Motor inverter control system /
Automatic -monitoring system
19
Critical Success Factors for ESCOs
External

Securing attractive projects
– Establish the Brand image for ESCO business

Providing high quality engineering &
installation in competitive cost
– Strategic alliance & partnership is must

Providing flexible contractual scheme
– Don’t stick to standard ESCO contract
– ESCO is not promoting a single fixed financing
– Performance Contracting should be adjusted to local situation
& client needs
20
Critical Success Factors for ESCOs
Internal


Ability to leverage marketing, sales &
technical capability in the organization
Management systems, software & tools
– Internet & Information technology maximum usage
– Energy audit process package tools
– Monitoring system & software

Entrepreneurship sprits & belief
– “Service” is not free of charge
– ESCO is providing not for just energy saving but for best
solutions to enhance clients’ value
21
Thank you
Sanbancho Sekiya Bldg 2F
22-7 Sanbancho, Chiyoda-ku, Tokyo
Japan 102-0082
TEL : +81-3-3288-4228
FAX : +81-3-3288-0102
e-mail : [email protected]
HP : http://www.fesco.co.jp
Portal Site : http://www.ecube-net.gr.jp
22