Overview of Project Plan UNDERSTAND

Download Report

Transcript Overview of Project Plan UNDERSTAND

Overview of Project Plan
UNDERSTAND
Revised on 26 February, 2007
Proposed Meeting Agenda
1. Introduction of Meeting and Presentation of
participants
2. Approval of agenda
3. Scope and delimitation of Understand
4. Overall project organisation and time plan
5. Next steps – local activities and end-products
6. Next meeting in the coordination group
2
Background
• The project UNDERSTAND is based on the need for a pan
European concept for energy supply security management
• This need evolves from several factors, some are:
– Automatisation of control systems and grids (“Black Box”)
– Escalation of retirements in the following five years
– Outsourcing of maintenance (based on old methodology)
– Cross-border interdependencies increasing
– Need of objective assessment
• EU has initiated several projects to increase security in energy
supply and energy systems i.e.
– EPCIP – European Program for Critical Infrastructure Protection
– Protection and Security of the Citizen
– SEIF – CV conference (security in energy infrastructures and energy
supply)
3
Scope/Objective
• Building Crisis Management capabilities
– in black-out situations
– targeted at Mid-level managers at Transmission
Systems Operators (TSO) -approx. 500 – 1 000
people in total
– in electrical network operations, and
– aimed at avoiding or minimizing cascade effects.
• Create or solidify the development of
organizational security culture/behavior for
reliability and resilience.
4
Crisis Management Capabilities
Examples of these include (list not complete):
– Ability to work and make decisions under stress / in
crisis situations by mid-level mgrs
– Crisis management organisations at TSOs
– Understanding and knowledge of technical
infrastructure, both own and mutual
– Understanding and knowledge of cascade related
problems, definitions etc
– Establishing cross-border reporting lines and structures
– Other key capabilities
5
Delimitation
• Only electrical power, not gas
• Only duty officers, operations
managers and national dispatchers
(or equivalents)
• Building on existing technical
systems and information structures
6
Total overview of project
Development
and validation of
”concept version”
Oct 2006 – Sept 2008
Development
of operational
version
Sept 2008 ->
Roll-out +
Continous
enhancements
TDB
7
End Product
• Part 1: Defined and validated concept for a pan European training
program for electricity transmission security management
• Why? Raise awareness, etc
• Target groups (some hundreds of people)
• Current status and good examples (Nordel and others)?
• Lessons learned from recent black outs?
• What? (Definitions, levels, procedures,….)
• How? The content and the delivery methods for the
education/training/simulation, etc. Role of “test groups”?
• Part 2: Plan, budget and organisation etc. for next step
• Tentative work plan and budget for continued work
• What other stakeholders and funders have to be involved?The role of
ETSO? UCTE? Nordel? Euroelectric?
• Who will take this concept forward and fully develop the operational training
program? EC/JRC/Ispra?
8
Areas central to the concept
• Improved networking opportunities among TSOs building
on existing networks/training etc (cf. Nordic Grid)
• Enhanced communication at mid-level management
• Embraces education and scenario based training
• Helping also new member states
• Strengthens future electricity grids – organisationally and
socially
• Supports a continuous learning process
• Centered on cross-border training situations, including
their national effects.
9
Project Participants
•
Swedish Energy Agency (Sweden)
•
SecLinc AB (Sweden)
•
VSB Technical University of Ostrava (Czech Republic)
•
ABC Dialog (Denmark)
•
The National Emergency Supply Agency (Finland)
•
Link Consulting sas (Italy)
•
Lithuanian Energy Insititute (Lithuania)
•
KCEM AB (Sweden)
•
University of Zilina (Slovakia)
•
University of Cranfield (United Kingdom)
TSOs in Europe should be involved/informed at an early stage in the project.
These are key to a successful implementation of project results.
10
Project Organization
Directorate-General
for Education and
Culture
Promoting Organization
Swedish Energy Agency
Project Management
SecLink
Project Secretariat
Coordination Group
WP 2
Cranfield
WP 3
NESA
WP 4
SEA
WP 5
VSB
WP 6
ABC Dialog
11
Coordination Group
• Members
– Swedish Energy Agency - representative
– Project Management and Secretariat
– Project Leaders from each work package
• Meetings
– Bi-Monthly status meetings (every other meeting is a
face to face meeting)
– Other meetings shall primarily take place in WPs.
12
Overall project and time plan
Project Management
”PDP”
Detailed
Work Plans
Project
Workshop
WP
Work
Seminaire/
Launch
Nov, 2
Dec, 15
April, 16
May, 3-4
June
April 2008,
”Kick off”
Stockholm
White Paper(d)
Cranfield
White Paper(f)
location tbd
2006
2007
2008
13
Phase 1: Project definition and Planning
”Project
Definition
and Planing”
Activities
End Products
• Coordination meeting (Dec.
15) to decide on:
• Approved Project Plan
– Purpose
– Organisation/Roles
– Overall Work Plan
• Local meetings with each
participant (2nd half of Jan.)
• Establishment of reference
bodies and documentation
• Revised Work Plan
• Defined Roles
• ”Core Team” buy-in
• Local partners informed and
WP teams initiated
• Reference bodies identified
and informed
14
Phase 2: Detailed Work Plans
End Products
”PDP”
Detailed
Work Plans
• Detailed preliminary
plans
Activities
– Per WP and Total
• Creation of WPPlans(x6)
– Identify activities, end
products, time plans,
“Test Groups”etc
• Based on best
effort/budget
• WP2 starts asap
• WP2 White Paper
– 1st draft on April 16
– 2nd draft at the
workshop, May 3rd.
– Final draft before
Summer 2007
15
Phase 3: Project Workshop
(3-4 may, 2007 Cranfield)
Detailed
Work Plans
”PDP”
Project
Workshop
Activities
•
White Paper presentation and
discussion
•
Go through WP-Plans
– Activities
– Input
•
Source
•
Content
•
Frequency
•
Time
– Output
•
Adjustment of WP-Plans
•
”Merge” of WP-Plans
End Products
• Adjusted, synchronized and
approved WP-Plans
• Overall detailed plan for
project
• Involvement in project of:
– EC/DG TREN
– National Energy Agencies
– ”Test Groups”
– ETSO, Eurelectric etc
16
Preliminary agenda for meeting in Cranfield.
May 3
May 4
• 13.30-14.00 Introduction
• 9.00-9.45 WP3, presentation
and discussion
• 9.45-10.30 WP4, presentation
and discussion
• 10.45-11.30 WP5, presentation
and discussion
• 11.30-12.15 WP6, presentation
and discussion
• 12.30-13.30 Final conclusions
and closure of meeting
• 14.00-14.30 White Paper (and
comments) presentation
• 14.30-15.30 White Paper
discussions (in groups)
• 16.00-17.00 Group
discussions feedback
• 17.30-19.30 WP plans
adjustments (in WP teams)
• 19.30 Dinner
17
Phase 4: WP Work
”PDP”
Detailed
Work Plans
Project
Workshop
Activities
• Finalize White Paper
• Establishment of ”Test
Groups”
• According to WPPlans
WP
Work
End Products
• White Paper
• ”Test Groups”
• According to WPPlans
18
Phase 5: Seminar/Launch
(before May 2008)
”PDP”
Detailed
Work Plans
Project
Workshop
WP
Work
Seminaire/
Launch
Activities
End Products
• Present ”Pilot solution” to
extract views and
comments
• Defined and validated
concept for a pan
European training program
for electricity transmission
security management
• Develop plan,
organisation and
preliminary budget for
next steps
• Plan etc. for next step
19