Transcript Slide 1
COMPOSITE GLASS DISC & PORCELAIN INSULATORS CORP 3035 Financial Requirements Presented by: Tshiwela Skosana -Commercial Finance Date: Thurs 18 Sept 2014 Financial Returnables 1. Pricing Schedule (Excel File) Consists of following worksheets: 1. Instructions 2. Insulator Summary 3. PS5 Schedule 4. 49 Activity Schedules 5. Option X 3: Foreign Currency 6. Option X 1: Contract Price Adjustment 5. Transport Input is required in all cells shaded light green 2. CPA (IG) Form – indicate Foreign payment method 2 SA Summary Sheet ENQUIRY No CORP 3035 COMMODITY COMPOSITE GLASS DISC AND PORCELAIN INSULATORS SUPPLIER Tenderers to Enter: 1. Supplier’s Name This information pulls through into remainder of spreadsheet 3 Activity Schedules COLUMN: E F Cost allocation General Engineering and Manufacture Engineering and Manufacture Design Engineering and Manufacture G H PS5 Allocation 1. 1. 1. 1. 1. Ex Works Ex Works Ex Works Ex Works Ex Works Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) Activity I Tier 2 Supplier Input costs Head office overheads Factory Overheads Project management Design Fees Labour Tenderers to Enter: 1. Supplier details:1.1 Name of supplier into column H 1.2 Factory of Origin into column I Note: some rows and columns that appear in the Excel file are hidden in the above extract 4 Factory of Origin Activity Schedules COLUMN: F J K L M ACTIVITY DETAILS & PS5 ALLOCATION PS5 Allocation 1. 1. 1. 1. 1. Ex Works Ex Works Ex Works Ex Works Ex Works Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) 1. Ex Works Price (Overseas) N Option X3 Data PRICE (In Rands) PRICE 5.00 5.00 5.00 5.00 5.00 - Foreign / Local Currency Type RoE Currency 1,00 = R R R R R R 5.00 49.65 54.87 71.09 89.17 Local Foreign Foreign Foreign Foreign ZAR AUD USD EUR GBP 1.00 9.93 10.97 14.22 17.83 R - Local ZAR 1.00 Tenderers to Enter: 1. Unit Price in relevant currency into column J exc VAT 2. Currency type (eg ZAR or USD or EUR) into column M Conversion to ZAR takes place based on your input into sheet “Option X 3” Note: some rows and columns that appear in the Excel5 file are hidden in the above extract Activity Schedules – “Other” Items COLUMN: E Cost allocation F G H PS5 Allocation Additional Items - Specify below 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) Activity I Tier 2 Supplier J Factory of Origin PRICE Additional Items - Specify below - Tenderers to Enter: 1. Cost Description into column E 2. PS 5 Allocation into column F: use drop down list 3. Activity description into column G 4. Supplier details in columns H & I Total 5. Pricing (rate) in column J 6. Currency into column M Note: some rows and columns that appear in the Excel file are hidden in the above extract 6 Summaries: PS 5 Schedule 3. 7. ITEM NUMBER ACCORDING TO THE ITEM LIST 101A 101B 102A PS5 ALLOCATION (FROM ACTIVITY SCHEDULE) AMOUNT AMOUNT AMOUNT 1. Ex Works Price (Overseas) R - R - R - 2. Inland Transport Cost R - R - R - R - R - R - 4. Cost of seafreight R - R - R - 5. Cost of airfreight R - R - R - 6. Cost of Marine Insurance* R - R - R - R - R - R - R - R - R - R - R - R - FOB Price Total price delivered port R.S.A. (CIF) (= 1+2) (= 3+4+5+6) 9. Landing charges 32. TOTAL PRICE DELIVERED TO SITE Excl. VAT (=17+24+27+30) R 33. VAT 34. Total price delivered to site including VAT (= 30.1+31) R R - R Tenderers to Enter: 1. Vat Rest of the information pulls through from activity schedules Note: some rows and columns that appear in the Excel file are hidden in the above extract 7 R - R - I O Summaries: N Insulator Summary (rows 3 – 51) C COLUMN D E F G L A SUMMARY OF PRICES EXCLUDING VAT S S SAP Grouping Item No UNIT S U R G E 101A 1 101B 1 102A 1 102B 1 Number H DESCRIPTION 0167491 INSUL,LINE POST 22KV 4KN LM D3017 0167492 INSUL,L/ROD 22kV 40kN 450C/L LM D3042 0167574 INSUL,L/ROD 22kV 40kN 450C/L HVH D3042 0189400 INSUL:STRAIN STAY 97KN IL 150/60KV I Foreign R 264.78 Local TOTAL R 5.00 R 269.78 R - R - R - R - R - R - R - R - R - A R R E S T E R S Note: some columns that appear in the Excel file are hidden in the above extract 8 J Summaries: Insulators Summary (rows 54 – 101) COLUMN: G H I J K L M SUMMARY OF FOREIGN BREAKDOWN Item No UNIT 101A 1 101B 1 102A 1 SAP Number DESCRIPTION TOTAL FOREIGN Currency (eg Euro) RoE Currency 1,00 = R R 0167491 INSUL,LINE POST 22KV 4KN LM 0 D3017 0167492 INSUL,L/ROD 22kV 40kN 450C/L LM 0 D3042 0167574 INSUL,L/ROD 22kV 40kN 450C/L HVH 0 D3042 264.78 Foreign 1 Foreign 2 EUR USD Foreign 5 GBP Foreign 5 CAD AUD R 14.22 R 10.97 R 17.83 R - R 9.93 R 71.09 R 54.87 R 89.17 R - R 49.65 R - R - R - R - R - R - R - R - R - R - R - R - Note: some columns that appear in the Excel file are hidden in the above extract 9 Foreign 3 Activity Schedules: CPA COLUMN: PS5 Allocation 1. 1. 1. 1. 1. Ex Works Ex Works Ex Works Ex Works Ex Works Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) 1. Ex Works Price (Overseas) F J K M PRICE (In Rands) PRICE O P Q-T Currency Type CPA Formula Description 5.00 5.00 5.00 5.00 5.00 R R R R R 5.00 49.65 54.87 71.09 89.17 ZAR AUD USD EUR GBP Fixed Fixed Fixed Fixed Fixed Firm and Fixed Firm and Fixed Firm and Fixed Firm and Fixed Firm and Fixed - R - ZAR Fixed Firm and Fixed Tenderers to Enter CPA per line item: 1. Use drop-down list to select applicable CPA formula per line item into column P 2. Default is “Fixed’ - if left unchanged, offer is Fixed and Firm CPA Formulae are updated in sheet “Option X 1” Note: some rows and columns that appear in the Excel file are hidden in the above extract 10 Contract Price Adjustment (CPA) What is CPA? • CPA is a mechanism used to track the movement of a contractor’s costs over the Contract period to provide reasonable reimbursement for price fluctuations. • CPA determinations are calculated using a pre-determined formula based on the assumed cost drivers of a particular product or service and a recognised index-based system which tracks those cost movements over a period of time. • Prices will be fixed for first year and thereafter CPA will apply from anniversary of contract onwards. • Separate CPA invoices are submitted for each base invoice once CPA applies ie CPA is not a price increase updated on the contract but rather a price adjustment based on the movement in the applicable index vs the base index 11 Contract Price Adjustment (CPA)………………contd • 10% Fixed Portion minimum (ie can be more eg 35% Fixed) • Balance (e.g. 90%) makes use of relevant indices • Sum of indices adds up to 100% • No in-house indices allowed • Proposed indices must be reflective of cost structure • Final applicable CPA formulae may be negotiated with successful tenderers 12 Option X1: CPA Formulae FORMULA No: A Index 1 2 3 4 5 6 ???? The proportions used to calculate the Price Adjustment Factor are: Proportion Description Base Date Source (indices prepared by) 10% Fixed 10% Total Historical Data - Index yy/mm/dd yy/mm/dd Kindly check input - must add to 100% Per Formula (A to M) Submitted, the Tenderers must Enter: 1. Description of CPA Formula 2. For the balance of indices (e.g. 90%) making up each formula: • % Weights (add up to 100% including minimum 10% Fixed portion) • Description • Definition from publisher • Base month and Index plus Historical data See notes: Instructions) Note: some rows and columns that appear in the Excel file are hidden in the above extract 13 Option X3: Forex MULTIPLE CURRENCIES - SECONDARY OPTION X3 No Currency Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Austrialian Dollar Canadian Dollar Swiss Franc Danish Krone European Currency British Pound Hong Kong Dollar Japanese Yen Norwegian Krone New Zealand Dollar Swedish Krone Singapore Dollar United States Dollars South African Rand Code AUD CAD CHF DKK EUR GBP HKD JPY NOK NZD SEK SGD USD ZAR Exchange Rate Date Published Currency 1,00 = 9.930487 10 Oct 2014 14.217400 17.834300 10 Oct 2014 10 Oct 2014 10.974000 R 1.000000 10 Oct 2014 Source https://www.resbank.co.za/Res earch/Rates/Pages/SelectedHi storicalExchangeAndInterestRa tes.aspx Note: Above is the list for which Foreign Exchange Cover can be obtained. Should your tender be in currency not indicated on this list, kindly contact the Eskom Commercial Department who will liaise with Eskom Treasury for sanction to use that currency. 14 Activity Schedules COLUMN: F PS5 Allocation 1. 1. 1. 1. 1. Ex Works Ex Works Ex Works Ex Works Ex Works Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) Price (Overseas) 1. Ex Works Price (Overseas) 1. Ex Works Price (Overseas) J K L PRICE (In Rands) PRICE 5.00 5.00 5.00 5.00 5.00 - M N Foreign / Local Currency Type RoE Currency 1,00 = R R R R R R 5.00 49.65 54.87 71.09 89.17 Local Foreign Foreign Foreign Foreign ZAR AUD USD EUR GBP 1.00 9.93 10.97 14.22 17.83 R R - Local Local ZAR ZAR 1.00 1.00 Exchange rates in sheet Option X1: 1. Accessed from SARB website 7 calendar days before tender closes http://www.resbank.co.za Select Research, then Rates, then “Select historical exchange rates and other interest rates https://www.resbank.co.za/Research/Rates/Pages/SelectedHistoricalExchangeA ndInterestRates.aspx 15 Forex Payment Methods Payment method 1: Where the contract with a supplier is in a foreign currency and the payment will be effected in a foreign currency………: (1a) into the foreign bank account of the beneficiary (1b) into an SARB-approved CFC account in South Africa Payment method 2: In South African Rand at the selling spot rate of exchange obtained by Eskom’s Treasury on the date that the forward cover is cancelled. Eskom will notify the supplier of the date that the forward cover is cancelled as well as the intended payment date, which will be as per the agreed payment terms. Any exchange rate adjustment after Eskom has notified the supplier of the date and the rate which the forward cover is cancelled, will be for the account of the supplier. Fixed Rand: Provided that the tenderer nominates either Payment Method 1 or 2 as the main tender offer, an alternative payment method offering a fixed price not subject to exchange variation may be offered for Eskom's consideration. 16 Forex: Key Concepts 1. Foreign amount being claimed must be proven: commercial invoice for the same amount 2. Any markup to be charged on top must therefore be in ZAR and not Forex 3. Goods imported into the country for stock are treated as ZAR based 4. Tenderer must be importing the goods directly from overseas and not buying from a local distributor, otherwise treated as ZAR based 5. Where tenderer proposes a ZAR-based contract (alternative offer), even then the spot and forward rates must be confirmed with and approved by Treasury If approved, then Eskom is not responsible for any exchange fluctuations 6. CFC account approval is granted for 1 year at a time; supplier must renew validity with SARB timeously Other hedges: - Commodities are hedged too. We will request full information (volumes and prices) - CPA. We will request FRI 17 Preference Points- note for JVs • BBBEE certificate submitted for preference points must be for the JV and not for individual entities who are party to the JV 18 Other matters • Printing settings for all documents are to be adjusted according to Tenderer’s printer • Tenderers to please complete the Excel Pricing Schedule, included on the tender bulletin. • Apart from the 2 identical hard copies (original and copy), the pricing schedule must also be submitted in electronic format (CD) in Excel format. • The hard copies must be submitted and signed by the authorised signatory. 19 Other matters: Financial Analysis Companies Signed Independent Auditor’s Report / Reviews Report Directors’ Report Statement of Financial Position (comparative figures) Statement of Comprehensive Income (comparative figures) Statement of Changes in Equity (comparative figures) Statement of Cash Flows (comparative figures) Notes to the Financial statements Close Corporations Signed Accounting Officers Report Members’ Report Statement of Financial Position (comparative figures) Statement of Comprehensive Income (comparative figures) Statement of Changes in Equity (comparative figures) Statement of Cash Flows (comparative figures) Notes to the Financial statements 20 Other matters: Financial Analysis……….contd. Applicable to companies and close corporations A Signed Guarantee Letter:If a subsidiary which is tendering does not have its own set of financial statements or its financials are consolidated into that of the Holding company the Holding company must provide a guarantee letter which will allow Eskom to utilise its financial information for the purposes of their subsidiary and to further guarantee any liability which may arise as a result of a subsidiary failing to perform in terms of the contract 21 Questions 22