Community Facilities Unit
The Future Management of 5 Leisure Facilities
• Welcome and introductions
• Facilities within scope
• Context
• Community protections
• Steering groups
• The contract process
• Questions or clarifications
1
Facilities within scope
Woughton Leisure Centre
•
•
•
•
•
•
4 Badminton court Sports Hall
1 Swimming pool
Gym
Aerobics studio
Arts / Dance space - Theatre
Bar / Meeting room
Woughton on the Green Playing Fields and Pavilion
•
•
•
•
•
•
•
2 Artificial grass pitches
6 Tennis courts (pending lease)
MK Dons Dome (pending lease)
11 Football pitches
2 Cricket tables
1 Baseball diamond
1 Pavilion with bar, changing rooms, meeting rooms
2
Facilities within scope
Windmill Hill Golf Centre
• 18-hole golf course
• Practice chipping/putting areas
• 28 bay driving range (23 covered)
• Clubhouse with 2 bars
• Kitchen and Function room with bar
• Pro Shop & repairs room
Broughton Community Sports Pavilion
•
•
•
•
•
2 halls, one with badminton court
Meeting room
Changing rooms
2 Junior pitches
1 Cricket table / 2 cricket net bays
3
Facilities within scope
Brooklands Community Sports Pavilion
• Due to open September 2015
• Sports hall with 2 badminton courts
• Smaller hall with external patio area
• 2 Football pitches
• 2 Junior pitches
• 1 Cricket square
4
Context
• Unprecedented LA budget challenges
• £40m savings to be found over four years
• Strategy: to generate income or potentially stop services
• Core Council services: Adult & Children’s Social Care
• Target is zero subsidy with a preference for an income to
MKC
• Investment into existing and new leisure provision
• Additional/improved facilities
• Ideas: fitness, soft play, etc
5
Woughton Leisure Centre
• Woughton Leisure Centre returned to MKC
management in August 2011
• Original timetable to externalise management of the
facility within 2 years
• Administration wished to see the facility go through
the Community Asset Transfer Programme
• One applicant, who withdrew after first stage of the
CAT process (2012)
• MKC has continued to manage the facility
6
Investment
Investment of £247,000
• Installation of a new sports hall floor
• Installation of new sports hall lighting
• Fixing of the lift/fire alarm system
• Painting completed throughout the Centre
• Installation of new pool filters
• Refurbishment of dry side changing rooms
• Creation of a new aerobics studio
• Installation of new cardio gym equipment
• Installation of barrier system on entry to the facility
• New lighting installed throughout the Centre
7
Development of Sporting Programmes
•
Introduction of No Strings Badminton,
Cardio Tennis and Swimming Academy
•
Pools Partnership Programme signed with the
Amateur Swimming Association
•
Closer working relationship with Woughton
Campus
•
More bookings and general usage of the facility
from community groups and individual users
8
Contract with Community Protections: Highlights
• The contract will be a lease with detailed service specification
and community protections on price and usage
• 10 year contract with a 5 year extension option (subject to
performance)
• Charities, leisure trusts and community/voluntary sector
organisations bidding must have good experience, credit
rating and track record
• Fully repairing and maintenance/risk transfer
• Investment programme across the portfolio: better
facilities/programmes and income generation
• Transfer of staff, TUPE/LA Pensions and terms & conditions
9
Contract with Community Protections: Highlights
• MK Sport and Active Communities Strategy (2014):
‘getting MK more active, more often’
• Successful and sustainable future facility
management, maintenance and operation
• Maximised facility use meeting local and wider
community need with a balanced programme of use
• Inclusive of all ages, abilities, ethnic groups and
social classes
• High standards of customer care
• Support for resident clubs, volunteers and
organisations to develop and thrive
10
Community Protections: The Assets
• Council retains freehold, charitable operator
has lease
• Lease obligations: fully maintain, insure
and invest in existing and new facilities
• No ability to sub contract
• No residential development
11
Community Protections: Prices and Usage
• Protected prices for facility hire and use
• No more than annual inflationary increases to
prices
• Priority bookings to local groups
• Protections for existing clubs and regular hirers
• Balanced usage programme: variety of activities
• Maximise usage for local and wider community
12
Management Steering Groups
To steer the management and use of the facility
Charitable operator accountable to group
Minimum membership
• Facility manager
• Council’s Leisure representative
• User representative
• Local Parish or Community Council representative
• Council Ward members
• Residents and key stakeholders in the vicinity
13
Management Steering Groups
Meetings: as required but not less than twice a year
Terms of reference to include:
• Balanced programme of use
• Pricing
• Repairs and maintenance
• Operational management
• Balance of local- and borough-wide use
14
The Contract Process
The facilities will be divided into two lots
Lot 1
• Windmill Hill Golf Centre; Woughton Leisure
Centre; Woughton on the Green Pavilion
Lot 2
• Broughton Pavilion; Brooklands Pavilion
A potential tenderer may:
• Bid for Lot 1, or Lot 2
• If bidding for Lot 1 must also include a bid for Lot 2
15
Contract Timetable
• Consultation events at each facility
• Cabinet decision to tender – Autumn 2014
• Tender publication – late 2014
• Cabinet decision to award contract – Spring
2015
• Contract starts – Autumn 2015
16
Over to You
Copies of the presentations and questions and
answers for these sessions can be found at:
www/milton-keynes.gov.uk/leisure-tourismculture/future-management-of-communityfacilities
Any comments please email:
[email protected]
ANY QUESTIONS
OR CLARIFICATIONS?