Budget
Septic
$7,500
Sump Pump
$1,100
Mold Treatment
$600
gutters vinyl
$350
window install
Sale Price
$123,300
$4,500
HVAC
$750
carpet
$2,000
kitchen floor
$300
laminate
$800
Trim Base
$500
Paint
$500
Toilets
$300
Showers
$600
Tub
$150
Vanity
$500
Hardware
$250
Doors
$500
Dishwasher
$350
Landscape
$1,000
Foreman
$1,500
$24,050
Repairs
Real Estate Commission
Debt
Profit/Loss
$24,050
$6,165
$93,000
$85
Major Issues
• Possession of House
–
–
Danny work with Mike to begin Eviction and continue communication with Tenant to gain possession. The sooner the better.
Judge may need to be aware of the crew coming to fit up the house. Hopefully he will clear possession in time.
• Septic/Perk Test
–
–
–
Waiting for info from health department as to results of perk test. If perk test passes does health department need to approve site.
Get quotes
If perk test does not pass, next course of action?
• Sump Pump
–
Is there one? Where should it go? Can we install?
• Floor Joist
• Mold
–
Schedule fogging before we arrive
• Termite Damage
• HVAC
–
Schedule service before we arrive
• Moldy Insulation
Whole House
• Painting
• Baseboards/Trim
• Windows
Outside
• Stump removal
–
Quote to have someone remove
• Landscaping
–
Simple but attractive
• Gutters
–
•
•
•
•
•
Quote for seamless
Rain cap
Paint Soffit
Clean debris from roof
Pressure Wash
Address half finished fence
Front Living
• Hope for Ray—doubtful(no cash for
material)
• Cut out bi-level floor joist and recap. Install
sub floor and steps.
• Electrical outlets
• Drywall—walls, ceiling,
• Ceiling fan
• Flooring
Down Stairs Hallway
•
•
•
•
Replace Paneling
Flooring
Ceiling
Closet—sliding door and hole in floor
Master Bedroom
• Closet doors
• Flooring—Tear out.
• Master door
Master Bathroom
•
•
•
•
•
•
•
•
Remove French Butt Cleaner
New Double Vanity Sinks
Knobs on cabinetry
Mirror/Light Fixtures
Tub/Toilet/Shower
Sub Floor
Fixtures
Professional Plumbing
2nd Bedroom First Floor
• Closet Door
• Threshold
Kitchen
•
•
•
•
•
•
•
•
Ceiling
Floor
Hardware
Dishwasher
Sink
Fixtures
Counter Top?
Paneling Wall/Chair rail?
Utility Room/Half Bath
•
•
•
•
Ceiling
Floor
Vanity/Toilet
Bathroom Walls
Play Room
•
•
•
•
•
Flooring
Ceiling
Walls
Sliding Door
Window with vent?
Upstairs
•
•
•
•
Carpet Floors
Bathroom Vanity/Shower/Toilet
Broken Window
Closet Door/Hardware
Team
•
•
•
•
•
•
•
•
•
Matt Albertson
Danny Albertson
Andy Albertson
Gary Herbert
Charlie Workman
Charles Beaman
Rob Workman
Jeremy Burns
Michael Hamilton &
Sons
•David Absher?
•Dave Miller?
Weekend Timeline
• December 7,8,9th
Tools/Supplies Needed
• Dumpster
• Air Compressors