Transcript Slide 1
NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF “TRITIUM PLANT CONSORTIUM OF ASSOCIATES” - TRIPLA-CA - ASSOCIATION DAYS, 26-27.11.2009 MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 1 ICIT-TRF NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES MEMBERS OF THE CONSORTIUM • • • • Karlsruhe Institue of Technology, KIT; Commissariate d’Énergie Atomique, CEA Ente per le Nuove Tecnologie, l’Energia e l’Ambiente ENEA Ministry of Education, Research and Innovation/Association EURATOM-MEdC/ National R&D Institute for Cryogenics and Isotopes Technologies - ICIT Rm Valcea CONSORTIUM STRUCTURE KIT ICIT ENEA CEA PARTIES F4E IO STEERING COMMITTEE LEAD PARTY MANAGEMENT BODY Industry Others COLLABORATION MANAGER WORK PACKAGE LEADERS MANAGEMENT SUPPORTING TEAM PARTIES REPRESENTATIVES MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 2 NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF THE PURPOSE OF THE CONSORTIUM The Purpose is to jointly organise and make appropriate proposal (s) to the Client (s) and to contribute, on the basis of Contracts, as widely as possible, to the realisation and the success of the ITER Tritium Plant System and related areas of ITER construction. CONSORTIUM GENERAL STRATEGIES • To ensure an efficient management of the overall Project, • To avoid duplication of the work by adopting and following a strongly coordinated work programme • To exploit the specific competences of the Parties. AREAS OF INTEREST TO THE TriPla-CA •The ITER Tritium Plant systems •The ITER Atmosphere Detritiation Systems •The ITER Hot Cell Facility Use of test facilities In support of R&D activities for the design of ITER WDS and ISS, the TriPla-CA shall take benefit of at least the following test facilities: •TRENTA facility from KIT •Pilot Plant for Deuterium and Tritium Separation from MEdC/ICIT Rm. Valcea MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 3 NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF CONSORTIUM LEADERSHIP STEERING COMMITTEE • Dr. Klaus Hesch • Prof. Dr. Ioan Stefanescu • Dr. Aldo Pizzuto • Dr. Andre Grosman SC is responsible for the overall orientation and supervision of the execution of the Collaboration and of the Contracts. Dr. Klaus Hesch has been chosen to act as Chairman of the Steering Committee LEAD PARTY KIT Collaboration Manager Dr. Ion Cristescu Lead Party act as coordinator between the Parties and is assisted by: • Management Body; • Management Support Team (MST). • • • • • Preparing, and proposing modifications to the Collaboration Documents; Reporting to the SC on the progress of the Collaboration; Bringing to the attention of the Parties the calls and invitations issued by any Client within the Scope of, and the Areas of Interest to the TriPla-CA; Supervise the implementation of the work for the Contract(s); Reporting to the Steering Committee on the progress of the Contract(s); WORK PACKAGE LEADERS WPL of the ISS Group has been nominated Dr. Robert Michling WPL of the WDS Group has been nominated Dr.Sebastian Brad WPL of the Safety & RAMI Analysis Group has been nominated Dr.Tonio Pinna WPL of the Licensing & Associated Group has been nominated Dr. Karine Liger MANAGEMENT SUPPORTING TEAM Leader of the MST has been nominated Dr.Frank Eichelhardt MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC • Project scheduling & control/interfaces/CAD/Quality documentation/Cost estimate/Risk management S BRAD, ASSOCIATION DAYS, 26-27.11.2009 4 NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF ASSIGNMENT OF WORK TO THE GROUPS KIT - ISS Engineering & Design ICIT - WDS Engineering & Design ENEA - HAZOP & RAMI Studies CEA - Licensing & associated QA The main duty of the ISS Engineering & Design Group is to characterize the specific ITER ISS components at ITER relevant scale, to develop the hardware and soft systems in order to control the tritium inventory and to provide the deuterium and tritium streams at the required levels. The group in charge with the development and design of the ITER WDS shall comply with the ITER new identified throughput and to provide the required decontamination factor, tacking into account the various isotopic compositions that can be built, during long term operation. The group in charge of HAZOP & RAMI Studies, required by the client, must assist in defining a safe system design and acceptance criteria for equipment that is wetted by tritium. The group in charge with Licensing & Associated QA cordinate and monitoring the Quality Assurance (QA) activity inside the overall Project and the safety and licensing related activities inside the Project MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 5 ICIT-TRF NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES Tritium Plant - estimated PPY for 2009-2016 Estimated contribution and cost estimation 10 14% 33 46% Estimated contribution of the members of TriPla-CA 55% 10% 29 40% WDS ISS ANS Tritium Plant - estimated TPY for 2009-2016 4 7% 10% 26 48% 25% KIT ICIT ENEA CEA 25 45% WDS MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC ISS ANS S BRAD, ASSOCIATION DAYS, 26-27.11.2009 6 NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF CONSORTIUM WORK Outline Flow Diagram of ITER Fuel Cycle Systems and Interfaces MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 7 NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF ITER WDS-ISS CONFIGURATION WDS COMPONENTS • • • • • • • • • • • Front-end process Electrolysis unit Catalytic exchange process Tritium bearing oxygen stream process Membrane permeator process Exhaust process Secondary confinement subsystems Process drying subsystems Tritiated water holding tank system Electrical, automation and control cabinet Utility ISS COMPONENTS • Cold-Box (CB) with CD columns (3 or 4) • Expansion vessels (EV) • Vacuum system (VS) • Valve Box (VB) • Instrumentation Box (IB) • HSC (hard shell confinement) MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 8 NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES ICIT-TRF ITER WDS For ITER, the WDS is one of the key systems to control the tritium content in the effluent streams, to recover as much tritium as possible and consequently to minimize the impact to the environment. The most suitable process for water detritiation is the CECE process, a combination of electrolysis and catalytic exchange of hydrogen isotopes in a Liquid Phase Catalytic Exchange (LPCE) column. The separation duty of the CECE process for fusion reactors is very high (tritium concentration in the released H2 from the WDS for ITER shall be < 700 Bqm-3 air at a typical activity of tritium in the water feed of 370 GBqm-3). ITER ISS The Isotope Separation System (ISS) envisaged to be used in ITER consists of a cascade of four cryogenic distillation columns with the aim to process a gas stream from the Vacuum Vessel via the Tokamak Exhaust Processing (TEP) system and a second one from the Water Detritiation System mixed with the return stream from the Neutral Beam Injectors. The ISS has to supply five streams with various tritium, deuterium and hydrogen composition. The top product of a CD column from ITER-ISS (CD1 column) has to be almost tritium free to be discharged into the environment, which is one of the main concerns from the licensing point of view. MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC S BRAD, ASSOCIATION DAYS, 26-27.11.2009 9 ICIT-TRF NATIONAL R&D INSTITUTE FOR CRYOGENICS AND ISOTOPES TECHNOLOGIES KIT, ICIT and ENEA, in the frame of the Consortium Tri-Pla-CA, jointly prepared and submitted an offer, answering to the ITER call for tender C4T/09/90/PMT PRI0001338 – “Development of method for highly tritiated water handling in ITER Tritium Plant. Phase 1”. ( deadline 22.10.2009 ) The work to be perform – assessment of the methods for handling of highly tritiated water (HTW) which will be produced in some operational cases at ITER Tritium Plant The consortium evaluate a possible contribution to the Design Working Order that has been released by ITER aiming on "Tritium accountancy and tracking for inputs to RPrS“. The purpose of this work is to provide an updated concept of ANS and inputs to RPrS on tritium accountancy and tracking. The consortium estimated the costs for the ISS, WDS and ANS ITER systems. THANK YOU FOR YOUR ATTENTION! MINISTRY OF EDUCATION, RESEARCH AND INNOVATION ASSOCIATION EURATOM – MEdC 10 S BRAD, ASSOCIATION DAYS, 26-27.11.2009