Agenda
•
•
•
•
•
Introductions
NIBS and buildingSMARTalliance
Define the Need
Discuss Goals/Objectives
Next Meeting
Introductions
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Deke Smith
Earle Kennett
Bill East
John Messner
Dennis Shelden
Calvin Kam
Mitch Schefcik
Chris Andrews
Paul Cote
Don Kuehne
John Young
Niels LaCour
Alexander Stepanov
Eric Wittner
Louis Hecht
Russ Manning
Renee Tietjen
Jason Combs
Scott McFarlane
Babak Jalalzadeh
Ken Casazza
Stu Rich
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Jaymes Cloninger
Mark Butler
Hector Camps
Phillip Cousins
Diane Davis
Alan Edgar
Kristine Fallon
Dave Jordani
Dave Morris
Bill Napier
Mark Reichardt
Angela Lewis
Kimon Onuma
Clark Morgan
Tim Murtha
Paul Seletsky
Kathy Kalscheur
Louise Sabol
Jeremy Hazel
Michael Rendler
Theresa Thompson
Mohammed Biswas
Peter Sforza
National Institute of Building Sciences
• 1974 - Public Law 93-383, Sect. 809
– Bridge between Private and Public Construction
– Non-governmental – Unique 501c3 Organization
– Unique in that it represents all disciplines in industry
• Architects, Engineers, Contractors, Insurers, Unions, Manufacturers, Legal,
Housing, Vendors, Owners, Consumers, State & Federal Government, Codes
& Standards, and Testing
– buildingSMART alliance is a council of the Institute
– Formerly International Alliance for interoperability
• NIBS Related Products –
–
–
–
–
Construction Criteria Base
Whole Building Design Guide
National CAD Standard
National BIM Standard
An Authoritative Source of Innovative Solutions for the Built Environment
The Alliance
Vision
• A global environment where all participants can readily
and transparently share, apply and maintain information
about facilities and infrastructure to enhance quality and
economy of design, construction, operation and
maintenance
Mission
• Improve all aspects of the facility and infrastructure
lifecycle by promoting collaboration, technology,
integrated practices, and open standards
Relationships
NIBS
Board of
Directors
buildingSMART
International
NIBS President
Board of Direction
buildingSMART alliance™ Staff
Alliance Programs
External and Internal Projects
Projects
From all members
of the Alliance
External and Internal Projects
Sponsors and Members
Proposed Strategy
1.
Create a strong industry presence and recognition for alliance
goals for interoperability and collaboration
2.
Create a multilevel business enterprise architecture for the industry
involving all stakeholders by identifying all activities in the scope of
the alliance
3.
Seek projects that populate the business architecture and ensure
that information is identified and that it flows throughout the
lifecycle to all stakeholders
4.
Develop and advance open standards for interoperability and
collaboration between practitioners based on the business
enterprise architecture
This is the primary goal of our efforts
BIM – GIS Information Exchange Project
• BIM and GIS both play key
roles in a facility lifecycle
• Both systems need to
exchange data yet both serve
as the repository for key data
elements
• This Project will provide the
basis for an information
relationship between the two
environments and their
underlying databases
Lifecycle Information View
Laws and regulations
CAD software
-Building regulations
-Building specifications
-Drawings, calculations
-Architect, engineer,…
VRML
Knowledge databases
-Visualisation, 3D models
-Best practise knowledge
-Own practice
Simulations
-Comfort
-Ventilation, heating
-Life cycle cost
-Light, sound
-Insulation
-Fire, usage
-Environment
-Life time predictions
Briefing
-Functional req.
-Estimates
-Conditions
-Requirements
Demolition, refurbishment
-Rebuild
-Demolition
-Restoration
Facility management
-Letting, sale, operations
-Maintenance
-Guaranties
Specifications
Construction management
-Scheduling
-Logistics, 4D
-Specification sheets
-Classification standards
-Estimates, accounting
Procurement
-Product databases
-Price databases
The Stakeholders
Execution
Stage
Procurement
Stage
Construction
Documents
Stage
Design
Stage
Project
Delivery
Selection
Stage
Conception
Stage
Owner
Planner - Scoping, Simulation
Environmentalist
Realtor
Appraiser
Mortgage Banker
Designers
Engineers - Energy Analysis, LEED
Conflict Analyst
Cost & Quantity Estimators
Specifiers
Contract Specialist & Lawyers
Utilization
Stage
Facility Managers
Maintenance & Sustainment
Safety & Occupational Health
Plant Operator
Renovation & Restoration
Space Manager
Security Manager
Network Manager
CIO
Risk Manager
Insurer
Occupant Support & Way finding
First Responders
Disposal
Recycling
Archivist
Construction Contractors
Sub-Contractors
Fabricators
Suppliers & Manufacturers
Code Officials
2yr
Closure
Stage
100+ Years
1Yr
BIM Project Savings
Execution Stage
Procurement Stage
Construction Documents Stage
Design Stage
Project Delivery Selection Stage
Conception Stage
Utilization
Stage
Closure
Stage
Optimized approach with virtual modeling and analysis with reduced change
orders & delivery time and lower operating and sustainment costs
Typical approach failing to do routine maintenance and
having to replace items earlier and more often
Typical design/build approach with required maintenance
The savings we are currently experiencing
with faster delivery and fewer change orders
The yet untapped $avings
IAI “BuildingSMART” model supports lifecycle data
© NIBS 2006,2007, all rights reserved
Rolling Up Information
Theatre / World
Country
Installation /
Region
State / Province
Natural Asset
County
Air / Space
City
Underground
IAI-IFC Usage
Site
Water / Sea
Real
Property Asset
Land / Parcel
Facility / Built
Building
System
Sub-Systems
Space
Components
Level
Overlay
Room
Structure
System
Sub-Systems
Components
Space
Level
Overlay
Room
Linear Structure
Node
Segment
BIM-GIS Interaction Needs
• How can BIM interact with GIS during the design
process to address issues related to site
conditions and surroundings?
• How can a BIM be incorporated into a campuswide GIS dataset for lifecycle facility
management and operations?
• How can a 3-D GIS model of a facility be used to
create an as-is BIM model for planning or design
activities?
• More…
BIM-GIS Interaction Issues
• What are the best business practices?
• What tools (BIM, GIS, CMMS, IWMS, etc.)
should be used to perform what functions?
• What level of detail should be stored in each
environment?
• What format(s) should be used for data
exchange?
• What standards exist or need to be developed?
• How can web services play a role?
• More...
Member Expectations
Future Meetings
• Teleconferences every month?
• Every other month?
• Face to face at key events?
Thank You
• Contact information
– http://www.buildingsmartalliance.org/index.ph
p/projects/activeprojects/27
– [email protected]
– 937-531-1330