Data Update Devices (DUDe) for TNB’s CGIS Project
Download
Report
Transcript Data Update Devices (DUDe) for TNB’s CGIS Project
Asia Geospatial Forum, PWTC, Kuala Lumpur
25th September 2013
CGIS Project
Data Management
Data Update Devices Project
Expected Benefit
Challenges
Largest electricity utility company in Malaysia
~87 billion worth in assets
Core businesses ; Generation, Transmission
and Distribution of electricity
Non Core businesses; ICT, Corporate Services,
Planning
CGIS stands for Corporate Geospatial
Information System
Implemented by ICT jointly with Generation,
Transmission, Distribution, Planning &
Corporate Services
Project implementation is based on the TNB’s
Top Management approved 10-year CGIS
Master Plan (2009-2019)
To improve the organization efficiency and
reduce operational costs
• Project Planning
(a.k.a Project
Development)
• Plant Operation
Performance
• Asset Tagging
GENERATION
(3)
• Load Forecasting
• Generation
Development (a.k.a
Generation & Grid
Planning)
• Area Network & Grid
Planning
PLANNING
(3)
• Land & Wayleave
Mgmt
• Document Mgmt
Interface
• Outage Mgmt
(Planned)
• Maintenance
Strategy & Plan
• Equipment
Performance /
Condition
Monitoring
• Vegetation Mgmt
• Workforce Mgmt
• Route Analysis
• Asset Tagging
• Asset Mgmt
TRANSMISSION
(10)
• Load Forecasting &
Segregation
• Area Network
Planning
• Construction Projects
• Operation Control &
Network Mgmt
• Maintenance Work
Order Mgmt
• Workforce Mgmt
• Route Analysis
(maintenance)
• Asset Tagging
• Asset Mgmt
• Customer Service
Support
• Supply New
Connection
• Reconnection
• Project Planning
• Wayleave Mgmt &
Land Mgmt
• Outage Mgmt
DISTRIBUTION
(15)
•
•
•
•
•
•
•
•
•
•
•
Technical Planning
Project Planning
Construction Projects
Breakdown Mgmt
Operation Control &
Network Mgmt
Route Analysis
(Maintenance)
Asset Tagging
Asset Mgmt
Equipment
Performance /
Condition Monitoring
Customer Service
Support
Workforce Mgmt
ICT
(11)
• Route Analysis
(Emergency
Response Team)
• Asset Identification
• Construction Project
• Document Mgmt &
Archiving
• Building Mgmt (incl
M&E)
• Customer Service
Support (for
Property
Maintenance)
• GenSet Services
Mgmt
• Land & Property
Mgmt
CORPORATE SERVICES
(8)
Generation: 17 Power Stations (Thermal & Hydro), 18 Mini Hydros
Distribution : ~8.3 million customer points/meter
~75,000 substations & associated equipment
~200,000 feeder pillars
~300,000 km of UG cables
Transmission: 460 Main Intake Substations (132kv and above)
20,000 km of OH lines
2,000 km of UG cables
Corporate Services:
ICT: ~14,000 km of fiber optics cables
480 comm rooms
1000 km of Last Mile Fiber
25,000 land parcels (Gen, PMU, PPU, Offices)
~60,000 PE land parcels
~7,600 buildings
•
•
•
•
•
Stands for Data Update Device (Mobile CGIS)
Phase I (Nov 2012 – Dec 2013)
30 selected users (Distribution Division)
Simple and seamless data update solution
Automate the data updating processes from
field to CGIS Database
DESCRIPTION
LENOVO THINKPAD TABLET 2
Processor
Intel® Atom™ processor Z2760
Dual-core™ four-thread, up to 1.80 GHz processor
Operating System
Windows 8 Professional x86 (32-bit)
Display
10.1 inch (16:9) IPS, LED backlight, anti-glare, 5-finger multitouch
Resolution
HD WXGA (1366x768) (720p)
Integrated Graphics Intel® Integrated HD SGX545 GFx (12 bit, 1080p video @30fs, DX9)
Memory
2GB LPDD2 SDRAM
HDD
64GB (e-MMC)
Time savings and cost reduction
Improve work productivity and efficiency
Increase data reliability and quality
Stakeholder’s buy in
Complex Data Model