Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005 [email protected] NASA’s Goddard Space Flight Center 301-286-5907 16 - 1 Lunar Reconnaissance Orbiter (LRO) Mechanical System Applicable Documents 431-RQMT-000004 430-PG-1410.2.1 430-RQMT-000006 431-ANYS-000010 431-PLAN-000005 431-PLAN-000110 431-SPEC-000008 431-SPEC-000012 431-SPEC-000091 431-SPEC-000112 431-SPEC-000113 (ALL) (ALL) NASA’s Goddard Space Flight Center LRO Requirements Document Robotic Lunar Exploration Program Configuration Management Procedure Robotic Lunar Exploration Program Mission Assurance Requirements Document Radiation Analysis for the Lunar Reconnaissance Orbiter LRO Systems Engineering Management Plan LRO Contamination Control Plan Electrical Systems Specification LRO Mechanical Systems Specification LRO Thermal Systems Specification LRO Technical Resource Allocation Specification LRO Pointing and Alignment Specification LRO Instrument Mechanical Interface Control Documents LRO Spacecraft Component Mechanical Interface Control Documents 16 - 2 Lunar Reconnaissance Orbiter (LRO) Mechanical System Level 2 Flow Down Key Requirements Level 2 Req. Level 3: Requirements Concept/Compliance Paragraph Requirement MRD-21 Mission Duration Mechanical Level 3 Requirements Paragraph 1.0 The Mechanical System shall be adequately designed and analyzed to support a 14 Month Mission Life. The Mechanical System shall be designed and analyzed to minimize Thermal/Structural Distortion and maximize Stability See PM, AM, IM, DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports MRD-70 Structural Stability MRD-71 Fields of View MRD-73 Accessibility Mechanical Level 3 Requirements Paragraph 2.0 & Paragraph 3.0 The Mechanical System shall accommodate the LRO Components/Instruments/Tech Demo and their Requirements , including Optical FOV and Thermal Radiator FOV requirements, as well as pointing and alignment requirements. The Mechanical System shall accommodate the CRaTER, Diviner, LAMP, LEND, LOLA, & LROC, Instruments and their Requirements per Inst. MICDs The Mechanical System shall accommodate the Mini-RF Tech Demo and its Requirements per Inst. MICDs The Mechanical System shall accommodate the Spacecraft Components and their Requirements per MICDs. See PM, AM, IM, DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports MRD-15 Solar Array Tracking MRD-16 Antenna Tracking Mechanical Level 3 Requirements Paragraph 3.0 The Mechanical System shall provide a release, deployment, and articulation system for the deployment and articulation of the Solar Arrays (SADAS). The Mechanical System shall provide a release, deployment, and articulation system for the deployment and articulation of the High Gain Antenna System (HGADAS)its See DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports MRD-2 Launch Vehicle MRD-28 Vehicle Interfaces Mechanical Level 3 Requirements Paragraph 4.0 The Mechanical System shall be compatible with the DELTA II Launch Vehicles and their requirements per LRO-L/V Mission Specification (TBD Doc. #) The Mechanical System shall be designed to meet the mechanical requirements of the Delta II L/V as defined in the DELTA II Payload Planners Guides See LRO-L/V MICD. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports NASA’s Goddard Space Flight Center 16 - 3 Lunar Reconnaissance Orbiter (LRO) Mechanical System Level 2 Flow Down Key Requirements Level 2 Req. Level 3: Requirements Paragraph Concept/Compliance Requirement MRD-49 Pointing Allocations Mechanical Level 3 Requirements Paragraph 5.0 The Mechanical System shall comply with LRO LRO Pointing and Alignment Specification 431-SPEC-000113, Includes Instrument, S/C Components, Solar Array & High Gain Antenna See PM, AM, IM, DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports ??? Mechanical Level 3 Requirements Paragraph 8.0 The Mechanical System shall Adopt a Single String approach for the Mechanical / Structural Design and Development and perform adequate analyses and tests to verify design. Selective Redundancy shall be allowed See PM, AM, IM, DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports MRD-76 Support Equipment Mechanical Level 3 Requirements Paragraph 11.0 The Mechanical System shall provide the LRO Observatory MGSE. See PM, AM, IM, DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports MRD-69 Contamination Control Mechanical Level 3 Requirements Paragraph 14.0 The Mechanical System shall Incorporate Instrument Dry Purge Lines on Orbiter up to T-0 (umbilical break-away line). See PM, AM, IM, DPLY Level 4 Specs., Mech. CAD Model, Mech. Assembly Drawing Packages, Analysis Reports NASA’s Goddard Space Flight Center 16 - 4 Lunar Reconnaissance Orbiter (LRO) Mechanical Concept ADDITIONAL VIEWS TO FOLLOW NASA’s Goddard Space Flight Center 16 - 5 Lunar Reconnaissance Orbiter (LRO) Mechanical Verification Summary • Verify all Mechanical / Structural Designs and Functionality – Analysis • Comply with LRO General Structural-Thermal Environments, Interface, and Veification Requirements • Overall System Level Verification Matrix • Verification by Analysis, and or Verification by Test of Proto-Type and/or Proto-Flight Units • Facilitate Functional and Performance testing of the LRO Observatory • S/A & HGA Deployment Monitoring (Potentiometers) • S/A & HGA shall Survive in Deployed Position Immediately after Observatory Separation thru LTO – Qualification Testing • Mech System • Orbiter – Functional Testing • Life Tests • Deployment testing in T/V NASA’s Goddard Space Flight Center 16 - 6 Lunar Reconnaissance Orbiter (LRO) Mechanical Requirements Summary • Mechanical System is ready to proceed to PDR NASA’s Goddard Space Flight Center 16 - 7