LRO Integration and Test
Joanne Baker
GSFC Code 568
August 16-17, 2005
NASA’s Goddard Space Flight Center
23 - 1
I&T Driving Documents
• LRO testing shall be in accordance with the “LRO Verification Plan”,
431-PLAN-000101.
• LRO integration and test shall be performed per the “LRO Integration
and Test Plan”, 431-PLAN-000100.
• LRO launch site activities shall be performed in accordance with the
“LRO Launch Site Support Plan”.
NASA’s Goddard Space Flight Center
23 - 2
I&T Document Tree
LRO Mission Requirements Document 431-RQMT-00004
LRO Mission
Vehicle Interface
Control Doc
RLEP Mission
Assurance Requirements
430-RQMT-000006
LRO Detailed
Mission Requirements (DMR)
for the LRO Ground System
431-RQMT-000048
GENERAL
ENVIRONMENTAL
VERIFICATION
STANDARD (GEVS)
Mechanical
Systems
Specification
431-RQMT-000012
Thermal
Systems
Specification
431-SPEC-000091
LRO System
Safety Plan
431-PLAN-000176
LRO Electrical
Systems
Specification
431-ICD-000008
SC PAIP
431-PLAN-000131
Contamination
Control Plan
431-PLAN-000110
SC Subsystem & Instr.
ICDs / Specifications/
Requirements
Rules for the Design,
Development,
Validation, and Operation
Of Flight Systems
GSFC-STD-1000
NASA’s Goddard Space Flight Center
Observatory Verification Plan & Matrix
431-PLAN-000101
LRO Ground
System ICD
431-ICD-000049
Subsystem & Instr.
Interface / Assembly
Drawings
23 - 3
I&T Document Tree – cont.
LRO Detailed
Mission Requirements (DMR)
for the LRO Ground System
431-RQMT-000048
SC PAIP
431-PLAN-000131
Instrument
Integration &
Test Plans
Observatory Verification
Plan & Matrix
431-PLAN-000101
Mission Readiness
Test Plan
431-PLAN-000079
LRO System
Safety Plan
431-PLAN-000176
Contamination
Control Plan
431-PLAN-000110
Integration and Test Plan
431-PLAN-000100
Test Plans
& Procedures
Simulations
Handling & Lift
Procedures
GSE Requirements/
Specification Docs
ITOS Procs
WOAs
Test Results
And Reports
Verification
Matrix
NASA’s Goddard Space Flight Center
23 - 4
I&T Document Tree – cont.
LRO System
Safety Plan
431-PLAN-000176
Integration
and Test Plan
431-PLAN-000100
LRO MSPSP
Launch Site Support Plan
Ground Operations
Procedures
NASA’s Goddard Space Flight Center
23 - 5
Orbiter Integration & Test Flow - 1
Flt. Power
System
Delivery
Battery & PSE
Plate Integration
Flt. C&DH
System
Delivery
Upper Structure
Integration
Battery & PSE
Orbiter Integration
& Test
C&DH
Integration & Test
Preliminary Bus
Functional Testing
Optical Bench
Integration & Test
Bus Mounted
Instrument
Integration & Test
Flat Sat
Build Up and
Checkout
Inst. Interface
Check
Out W/ Flat Sat
Optical Bench
Delivery
ST & IRU
Integration &
Alignment
NASA’s Goddard Space Flight Center
C&DH
Plate
Integration
PDE
Integration & Test
Propulsion
Module
Delivery
Reaction Wheel
Integration
RF components
Integration & Test
SA and HGA
Integration & Test
OB - Instrument
Integration &
Alignment
23 - 6
Orbiter Integration & Test Flow - 2
Instrument
Functional
Tests
RF
Compatibility
Test
ACS Polarity
Test
Time
Offset/Drift
Test
Alignment
Baseline
LOLA
Boresight
Alignment
LAMP
End to End
Test
CPT
S/A and HGA
Deployment
Tests
Jitter
Characterization
Comm Sys
End to
End Test
Day In the
Life
NASA’s Goddard Space Flight Center
Mission Sims
23 - 7
Orbiter Integration & Test Flow - 3
Pre-Environmental
Review
Sine Vibe
W/ Aliveness
Acoustics
W/ Aliveness
Separation/
Shock
Test
Alignment
Check
& Functional
Test
EMC
Thermal
Vac & Balance
Alignment
Check
Post
Environmental
CPT
Bus &
Instrument
Special Tests
Pre-Ship
Activities
Ship
To KSC
Post-Ship
Activities
Post-Ship
Functional or
CPT
Spin
Balance /
Mass Properties
Pad Readiness
Activities
Pad
Installation
Pad
Aliveness
Test
Fairing
Installation
LAUNCH
NASA’s Goddard Space Flight Center
Fueling
Final
Close Outs
23 - 8
I&T Verification Summary
•
Interfaces
–
•
Functionality Hardware
–
•
Day in the Life; Separation timeline; Mission Sims
Environments
–
•
Functional Test; Performance; Time verification; End to End Tests; Deployment Tests
Functionality Software
–
•
Mechanical Integration; Electrical Integration Procedures; Polarity test; Alignment; Spin
Balance; Mass Properties
Contamination; Jitter Characterization; Sine Vibe; Acoustics; Shock / Separation Test;
EMC; Thermal Vac / Balance
Instrument Special Tests (unique configurations)
–
LOLA: Boresight alignment check; LAMP: End to End Test;
NASA’s Goddard Space Flight Center
23 - 9
Ground Support Equipment – Orbiter Level
•
•
Simulators: Instrument simulators, Spacecraft simulators; Flat Sat
Mechanical GSE
–
•
C&DH GSE
–
–
–
–
–
•
•
•
Dynamic Simulator; ACS component stimulators: Star Tracker, IRU
Propulsion module simulator/GSE
Instrument Unique Ground Support Equipment
–
•
Solar Array Simulator; Battery Simulator; Load Box
ACS GSE
–
•
•
Front End Processors – S-band & Ka-band
1553 Bus Monitor
Space Wire Test Rack
Data Storage
Workstations
RF racks & antenna hats
Time test rack
Power GSE
–
•
Lift fixtures, handling dolly, turnover fixture, transportation fixture, thermal vac support structure.
CRaTER: CO60 source; non-ITOS workstation; Diviner: BCE; LAMP: Vac Ion, Pump, UV light source;
LEND: Californium source; LOLA: Laser Test Equipment (BCE), target; LROC: none identified
Contamination
–
Instrument GN2 purges
NASA’s Goddard Space Flight Center
23 - 10
I&T Summary
•
•
Instrument requirements identified to date and understood.
Most difficult area will be thermal vac test configuration.
– Testing may be limited by configuration limitations.
•
•
•
Other I&T requirements are not unique and can be realized.
I&T plan will be in released draft form by mission PDR.
Ready to proceed with preliminary design.