Transcript Folie 1
6” Origami Module and Front End Electronics Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6th Open Meeting of the Belle II Collaboration 5. July 2010 6th Open Meeting of the Belle II Collaboration Components Testing & Quality Check Assembly Module Test Summary 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 2 6th Open Meeting of the Belle II Collaboration Components Testing & Quality Check Assembly Module Test Summary 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 3 6th Open Meeting of the Belle II Collaboration Origami Chip-on-Sensor Concept • Principal feasibility shown in 2009 by building a prototype module using a 4” DSSD • Successfully tested in lab and SPS beam • Can it be scaled up to the size required for the center 6” sensor of the outer most ladder? 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 4 6th Open Meeting of the Belle II Collaboration Summary 4” Origami • Flex hybrid produced by CERN PCB workshop – long delivery time – almost made by hand – not suitable for series production • Several vias broke after soldering of electronics components • Only moderate bondability • We found a Japanese company for production of new 6” design 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 5 6th Open Meeting of the Belle II Collaboration Origami Design for Belle II SVD • Present design for center module of outermost ladder (6“ HPK sensors) • Consists of 4 parts: – Origami PCB (~ 450 mm long) – PA0: pitch adapter for n-side, glued onto hybrid – PA1, PA2: pitch adapters to connect p-side strips, wrapped around the edge of the sensor • Manufacturer: Taiyo Industrial Co., LTD. 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6 6th Open Meeting of the Belle II Collaboration Origami Design for Belle II SVD • Design finalized in mid of March – needed some iterations with company – e.g. separate PA0 from hybrid to ensure high precision, tear drop design for vias • First batch of PA1 and PA2 received end of March (10 pieces each) • 10 pieces of Origami PCB and PA0 shipped end of April • Shipment within appointed time • PA0 already glued onto hybrids by company 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 7 6th Open Meeting of the Belle II Collaboration 6“ Origami PCB and Pitchadapters Origami PCB PA0 • Origami PCB – 3-layer design – 237µm thick (nominal) PA1 glued onto hybrid PA2 • PA0, PA1 and PA2 – 2-layer design – 145µm thick (nominal) 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 8 6th Open Meeting of the Belle II Collaboration Components Testing & Quality Check Assembly Module Test Summary 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 9 6th Open Meeting of the Belle II Collaboration PA1 & PA2 • • • • Top layer (coating) and thus PAs are thicker than expected PAs are rigid complicates bending Can the company use a thinner coating? We brought one (thinner) pitch adapter made by CERN as sample • Shorts and open measurement no failure found • Design issue: – – – – – 5. July 2010 Staggering at sensor side is wrong Does not match staggering of DSSD Bonding is nevertheless possible Can be used for prototype module Layout will be corrected for next batch Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 10 6th Open Meeting of the Belle II Collaboration Origami PCB - Optical Inspection • • • • Overall impression is very good Shape of pads and lines look very precise Gold plating of bond pads seems to be uniform PA0 is well aligned to the footprints of the AVP chips. • Few minor issues: – On one PCB the top layer of PA0 is slightly displaced by about 88µm (~1 pitch), but still bondable – Drill of some vias is not centered, but within tolerance – The second (left hand) bias pad is covered by the solder stop layer missing opening – Alignment marks on two PCBs are incomplete (partially removed), e.g. hybrid #10 required for auto adjustment of our bonder.. 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 11 6th Open Meeting of the Belle II Collaboration Origami PCB – Electrical Test • We measured the connection between the connectors and all APV chips • ~3300 measurements in total • Very satisfying results: 9 of 10 board are good • On one PCB we found a single open via near APV #1 (p-side) • Design issues: – APV signals lines swapped: 0<>1, 2<>3Origami PCB of neighboring sensor – doesn‘t matter for prototype covers and damages bond wires – Bias connection between PA0 and Origami PCB will be covered by neighboring hybrid – change location of pad 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 12 6th Open Meeting of the Belle II Collaboration Origami PCB – Soldering • Was an annoying issue of 4” Origami hybrids (soldered by hand @ ~350 °C) • Broken vias after soldering, caused by local delamintation • Vapor phase soldering ? – lower temperature – Nanonics connector • Baking of one hybrid: 48h @ 65°C • Solder cycle w/o applied parts: 5 min. @ 230°C • Optical inspection & electr. Test – no visible damage – all connections still ok – no broken via 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 13 6th Open Meeting of the Belle II Collaboration Origami PCB Soldering – Nanonics Connector • We equipped and soldered one hybrid using vapor phase soldering no damage of PCB • Nanonics connector is still problematic – – – – connector has two rows of pins sometimes they are not at the same height causes bad connection of some pins resoldering of inner row is difficult • Further investigation required • Other connector available? 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 14 6th Open Meeting of the Belle II Collaboration Origami PCB Soldering – Resistor Edge of PA0 • Resistor in front of APV – located between two bond pads – no space for solder stop between resistor and pads • solder tin covers bond pad no more bondable • Solution for prototype: – we glued small pads beneath the damaged one • Future design: – modified routing of lines between solder and bond pads – glued PA0 acts as solder stop layer 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 15 6th Open Meeting of the Belle II Collaboration Origami PCB – Thermal Cycling • Test long term thermal stress resistivity • 84 cycles between -10 and +30 °C • Same conditions as used for CMS thermal tests • Duration: ~ 2 weeks • Thereafter we repeated optical inspection and electrical test • No damage detected Temp Sensor 1 Temp Sensor 2 T hermal Cycling 35 30 25 Temperature [°C] 20 15 10 5 0 -5 -10 -15 9.6. 5. July 2010 10.6. 11.6. 12.6. 13.6. 14.6. 15.6. 16.6. 17.6. Date/Time 18.6. 19.6. 20.6. 21.6. 22.6. Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 23.6. 24.6. 16 6th Open Meeting of the Belle II Collaboration Origami PCB – Impedance of Analog Data Line • • • • Determined diff. impedance of analog output of p-side APV #1 Measured reflexions of rectangular input signal and adjusted Rterm until reflection disappeared Measurement: Zdiff = 102.6 W Simulation: Zdiff = 102.7 W • • • Path length: ~ 45 cm, Propagation delay (measured) = 5.46 ns Propagation speed: c = 164 800 km/s 6.07 ns/m Hybrid cable: Zdiff = 125 W still no reflexions visible Rterm << Rz 5. July 2010 Rterm = 102.6Ω = Rz Rterm = 125Ω Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 17 6th Open Meeting of the Belle II Collaboration Origami PCB – Ohmic Resistance of Line Rline = 22 W (single line) Rline = 9.4 W half the measured value • • Measurement: Simulation: • Comparison line geometry line width line distance dist.to next pair nominal [µm] 100 121 380 measured [µm] 74.3+-2.0 144.3+-1.5 410 slightly over etched, but does not explain huge difference of R thickness • • • • nominal [µm] 9 measured [µm] 5 Measurements were done with the tactile sensor of our CMM 5µm copper thickness is compatible with measured resistance Apparently, there is less copper than planned, but this is not a real problem. Anyhow, we originally requested 5µm less material budget 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 18 6th Open Meeting of the Belle II Collaboration Origami PCB – Wire Bonding • Fully automated bonding machine • Bond process control • Easy to find working parameters • Very uniform deformation • Excellent bondability Origami Sensor Excellent and uniform gold coating deformation vs. time 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 19 6th Open Meeting of the Belle II Collaboration Components Testing & Quality Check Assembly Module Test Summary 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 20 Assembly procedure of 6” Origami • • • We must newly develop the assembly jigs so that the size of component is entirely different with that of 4” DSSD Origami prototype modules. The procedures should be as simple as possible to minimize the developing and actual assembly time (~7 weeks. limited by my stay at HEPHY), but should be extendable whole ladder for near future production. The procedures are developed to require basic three jigs and these supplements. jig1 jig2 • The Jigs are used to hand the current procedure to the next procedure with keeping their alignment ( assured by pin&hole ). The assembly precision is limited by the difference of pin and hole’s diameter. If we use precise pin and linear bush( circulating boles inside wall of hole to reduce friction ), it easily achieve several mm precision level. • As a results, we could assemble very smoothly on schedule using developed 5. July 2010 procedures without any problems. jig3 21 Procedure1: Placing DSSD on the Jig1 1. Placing the DSSD on the jig1 2. Fixing DSSD with vacuum chucking 3. Removing stopper and pin Jig1 Poral stone to vacuum-chuck Commonly used holes to hand Origami components to the other jigs DSSD 5. July 2010 Attachable stopper to align the DSSD 22 Procedure2: Placing Pitch adaptors on the DSSD 1. Placing PAs on the sensor 2. Aligning PAs 5. July 2010 23 Procedure3: Placing PA-jigs and picking up the PAs 1. Placing PA-jig on the PA 2. Fixing PAs to the PA-jigs with vacuum-chucking 3. Picking up PAs PA-jig Pins PA-jig Chucked PA Jig1 5. July 2010 Vacuum chucking holes 24 Procedure4: Picking up PA-jigs, gluing, wire-bonding 1. Placing PAs on the PA-jigs upside down 2. Dispensing glue on the backside of PAs 3. Placing PA-jigs on the Jig1 again to glue 4. After cured, removing PA-jigs Araldite 2011(Epoxy adhesive) 5. July 2010 5. Wire-bonding p-side of DSSD and PAs 25 Procedure5: Placing ribs on the jig2 and dispensing glue Jig2 Support ribs 1. Placing the Support ribs in the groove of Jig2 2. Dispensing glue top of the ribs Grooves for ribs 5. July 2010 Poral stone Jig2 26 Procedure6: Placing the jig2 on the jig1 Jig2 1. Placing the jig2(Ribs) on the jig1(DSSD) to glue Jig1 2. Flipping upside down 3. Fixing DSSD to the jig2 with vacuum chucking 4. After curing the glue(~24h), removing jig2 Hole Jig2 Pin 5. July 2010 Jig1 27 Procedure7: Placing the jig2 on the jig1 1. Placing the Rohacell on the Jig1 with as same as procedure1 2. Fixing the Rohacell with vacuumchucking 3. Dispensing glue on the Rohacell Jig1 5. July 2010 Rohacell Attachable stopper for Rohacell 28 Procedure8: Placing the jig2 on the jig1 Jig1 1. Placing Jig1(Rohacell) on Jig2(DSSD) to glue them Jig2 2. After cured(~24h), removing Jig1 Jig2 Jig2 Jig1 Rohacell 5. July 2010 29 Procedure9:Placing the PCB on the Rohacell to align Microscope 1. Placing the Origami PCB on the Rohacell(Jig2) to align 2. Aligning the bonding pads of the PCB to the bonding pad for N-side of DSSD zzz… Origami PCB Jig2 Tired man 5. July 2010 Attachable support for the Origami PCB 30 Procedure10:Picking up the PCB, gluing and wire-bonding Jig3 1. Placing the Jig3 on the PCB(jig2). And then, picking up PCB to the Jig3 with vacuum-chucking PCB support 2. Dispensing glue on the backside of the PCB Jig2 1 Jig3 2 3. Placing the jig3 again to glue the PCB and Rohacell on the Jig2 4. After cured(~24h), removing Jig3 5. Wire-bonding APV to n-side DSSD Jig3 Jig2 5. July 2010 3 4 31 Procedure11:Wrapping PAs, gluing and wire-bonding Jig2 1. Wrapping the PAs with special jigs 2. Dispensing PAs and gluing to the PCB 3. After cured, wire-bonding the PAs to the APV. Special jig => Assembly completed We think the developed procedures are based for the full ladder production to extend to the lateral direction. 5. July 2010 32 6th Open Meeting of the Belle II Collaboration Assembly – Required Equipment Origami assembly toolbox 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 33 6th Open Meeting of the Belle II Collaboration Assembly – Finished Module Although the schedule was very tight, we succeeded to finish the first module before the B2GM 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 34 6th Open Meeting of the Belle II Collaboration Components Testing & Quality Check Assembly Module Test Summary 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 35 6th Open Meeting of the Belle II Collaboration Origami Module – Sensor Characteristics Specifications of Polysilicon Resistors IV Curve 18 March 2010 by HPK I [µA] 3,5 Process parameters Serial No. Pside 1 P1 2 P1 3 P1 4 P1 5 P1 6 P1 7 P1 8 P1 9 P1 10 P1 11 P1 12 P2 13 P2 14 P2 15 P2 16 P1 17 P1 18 P1 19 P3 5. July 2010 Nside N1 N1 N1 N2 N2 N2 N2 N3 N3 N3 N3 N2 N2 N2 N2 N2 N2 N2 N2 Poly resistor Measurment results (Mega Ohm) MAX MIN AVE P1 17.6 15.1 16.3 P2 46.3 35.6 41.1 P3 7.1 6.4 6.8 3,0 2,5 2,0 1,5 1,0 N1 N2 N3 20.5 7.2 3.3 15.3 6.2 2.7 17.4 6.5 2.9 0,5 0,0 0 20 40 60 80 100 120 140 160 -0,5 -1,0 • • • Sensor #8: Dark current: Rpoly: – p-side: – n-side: B2HPK_10938-9239_8 3µA @ 80V 16.3 MW 2.9 MW – confirmed by measurement Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 36 6th Open Meeting of the Belle II Collaboration Stripscan Sensor #8 (n-side) • • • • • 5. July 2010 6. I_strip = -3.31 nA R_poly =2.76 Mohm C_ac=186.83 pF No pinhole HPK: AC AL short at strips 275/276 - could be verified by C_ac measurement! Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 37 6th Open Meeting of the Belle II Collaboration Origami – Source Test • • • • Made a source test using 90Sr source Module works well all APVs ok No I2C problems Currently we can read out 8 of 10 APVs (limited by existing readout system) • Due to leak of time: – Only one single run performed – No cooling pipe applied – Results are very, very preliminary! 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 38 6th Open Meeting of the Belle II Collaboration Source Test – Very Preliminary Results no C1 Entrie s Mea n RMS 8000 7000 ndC1 Origam i6_mod1_p (Orgami 6") - Noise 512 248 1 43.8 entries [] s igm a [e] Origa mi6 _mod 1_p (Orga mi 6") - No ise 6000 Ent ries Mean RMS χ / ndf Constant Mean Sigma 50 40 512 3353 621. 3 29.85 / 26 41. 3 ± 2. 6 3330 ± 20.8 439.4 ± 18.8 5000 30 Noise = 3330.4 4000 3000 20 2000 10 1000 0 100 200 300 400 no C3 Origa mi6 _mod 1_n (Orga mi 6") - No ise s igm a [e] 0 500 s trip [] Entrie s Mea n RMS 2400 2200 2000 2000 3000 4000 5000 6000 7000 8000 s igm a [e] ndC3 Ent ries 512 Mean 975. 8 RMS 144. 8 χ / ndf 27.83 / 7 Constant 189.7 ± 11.5 Mean 962.7 ± 4. 6 Sigma 96.74 ± 3. 83 180 160 140 1600 120 1400 1200 100 1000 80 800 Noise = 962.7 60 600 40 400 20 200 0 100 200 300 Average cluster noise: p-side: 3330 e n-side: 963 e 5. July 2010 1000 Origam i6_mod1_n (Orgami 6") - Noise 512 2 62.7 1 47.6 1800 0 0 entries [] 0 400 • • • • 500 s trip [] 0 0 500 1000 1500 2000 s igm a [e] Some noisy strips on both sides Noise on p-side seems to high Need to investigate Requires measurements with cooling! Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 39 6th Open Meeting of the Belle II Collaboration Source Test – Very Preliminary Results II s iC1 Ent ries Mean RMS χ / ndf Width MP Area GSigma 1400 1200 1000 34659 3. 506e+04 1. 566e+04 620.1 / 96 4518 ± 26.0 2. 441e+04 ± 53 3. 565e+07 ± 195277 500 ± 14.5 7000 clw = 1 2 346 57 8 .8 45 2 .7 74 3+ Peak = 6.74 FWHM = 34.2% 4000 3000 400 2000 200 1000 10000 20000 30000 40000 50000 60000 70000 80000 0 90000 signal [e] siC3 Ent ries Mean RMS χ / ndf Width MP Area GSigma 5000 4000 3000 95601 3. 048e+04 1. 266e+04 488.4 / 81 2652 ± 19.1 2. 28e+04 ± 26 9. 804e+07 ± 321418 2718 ± 35.3 Peak = 23801.7 FWHM = 55.3% 1000 30000 40000 50000 60000 70000 80000 90000 signal [e] 30 40 50 60 0 SNR [] snr3 Entrie s 956 00 Mea n 2 3.63 RMS 9 .3 99 clw = 3000 1000 20000 20 4000 2000 10000 10 5000 2000 0 0 Origam i6_mod1_n (Orgami 6") - S NR entries [] 0 Origa mi6 _mod 1_n (Org ami 6" ) - Sig nal entries [] 8000 6000 Peak = 24436.5 FWHM = 74.5% 600 0 Entrie s Mea n RMS 5000 800 0 snr1 Origam i6_mod1_p (Orgami 6") - S NR entries [] entries [] Origa mi6 _mod 1_p (Org ami 6" ) - Sig nal 1 2 3+ Peak = 17.08 FWHM = 53.8% 0 10 20 30 40 50 60 SNR [] • Low SNR on p-side should be > 10 with cooling • n-side benefits from short pitch adapter (PA0) and short strips 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 40 6th Open Meeting of the Belle II Collaboration Components Testing & Quality Check Assembly Wire Bonding Module Test Summary 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 41 6th Open Meeting of the Belle II Collaboration Summary • Origami Components: – – – – – – • Assembly Procedure – – – – • New 6” Origami PCB and PAs manufactured by Taiyo Industrial Co., LTD. Delivered all parts in time Excellent quality Only some minor issues PA1 and PA2 should be slightly thinner to ease bending Some design issues will be solved with next batch Design and production of jigs within few weeks, thanks to effort of Onuki-san Proposed assembly procedure verified by building prototype module In principle scalable for ladder production Only minor modifications required, e.g. using linear bush to enhance precision Module Performance – – – – 5. July 2010 All APVs work well High noise level on p-side but currently no cooling applied More tests and analysis required Beam test and irradiation scheduled for October 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 42 6th Open Meeting of the Belle II Collaboration Thank you for your attention 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 43 6th Open Meeting of the Belle II Collaboration Backupslides 5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 44