Our SCADA network test bed consists of a few key pieces of
hardware and software:
• Hardware
• Siemens SCALANCE S612 Security Module
• Siemens SIPROTEC 4 7SJ61 Relay (Sensor)
• Software
• Siemens Spectrum Power TG SCADA/EMS (HMI)
• Siemens SICAM PAS v6.00 (RTU)
• Siemens DIGSI (Software for SIPROTEC Protection Relays)
• Digsilent Power Factory v.14
• Matrikon OPC Server/Explorer
• VmWare ESXi 4.1
• Nessus
• Other Vulnerability Assessment Software
Siemens
Spectrum
Power TG (HMI)
Virtal and Real
SICAM PAS
(OPC Client)
Virtualized and
Real Relays
Matrikon OPC
Server
DIgSilent
PowerFactory
(OPC Client)
• Virtualization
• Finish the RTU and virtual relay integration.
• Create easy deployments for substations
• Design virtual diagram of system for control center
• Power Flow Simulation
• Achieve “Hardware in-the-loop” connectivity
• Create practical system failure scenarios
• Develop nice display for power system
• Cyber Attacks
• Refine MITM traffic interception attack
• Create firewall backdoor attack