Huldra Wellhead Platform - Not Normally Manned
Key da ta
• Client:
Statoil
• Scope of Work:
EPC and mechanical completion for the
topsides, commissioning assistance and
hook-up.
• Family Venture:
KOGAS / KOGL
Schedule
• Award:
15 February 1999
• Concept completion: 3 July 1999
• Complete loadout:
19 February 2001
• Offshore completion: 1 August 2001
• First gas expected:
1 October 2001
Technical
• Conductor slot:
• Gas export to:
• Oil export to:
• Type:
• Accommodation:
• Estimated weight:
• Control from:
12
Heimdal
Veslefrikk
Not Normally Manned
20 persons
3650 tonnes
Veslefrikk
Loc ation
North Sea (NCS)
TM
KO G/O HP /PIC/0 1 - Up d a te d 2 0 Se p 1 9 9 9
Snorre North SSPU Concept Developments
Client:
Norsk Hyd ro P roduksjon ASA
Contractor:
Joint V entu re b etween Aker Maritime
and Kværn er O il & G as a.s
Scope of Work:
Eng ineerin g, Procuremen t, Construction
and Commissionin g (Inshore) .
Semisubmersible Drilling and
Pro duction pla tform. Combined cycle
power gene rati on u nits (Gas turbi nes +
stea m). Power sub sea cable to S norre
A fo r impor t/ expor t of excess power.
1997
Ram Rig Drilling equi pme nt set. Oil
export to Statfjord B. G as export/imp ort
to S norre A. Topside weight 1 8.5 00
E NG . /FAB. TOP S IDE
tons.
E NG ./ FAB. HULL
Location:
Norway
1998
1999
2000
2001
P RE CO NT RACT ENGI NEE RING
HOOK-UP COMM IS SI ONING
HOOK-UP ANCHOR/ RI SE RS & T ES TING
Installation:
May 20 01
TM
S TART P RODUCT ION 1.10. 01