Slajd 1 - Gdański Terminal Kontenerowy
Download
Report
Transcript Slajd 1 - Gdański Terminal Kontenerowy
Gdańsk Container Terminal Co
Established in 1998
Our motto
GTK is…
Major advantages:
• customer’s approach,
• professional and comprehensive services
including terminal, depot and repair services.
• high quality standards.
• good connections to hinterland
• excellent transit connection to Russia, Belarus,
Ukraine, Slovakia and Czech Republic
Location:
Port of Gdańsk
Szczecińskie Quay
Technical facilities:
•
•
•
•
•
•
•
quay length 367 m
ship length up to 205 m
max. draft 9.8 m
open stores 67 417 m2
reefer plugs – 95 units
ships operated in lo-lo systems
full support for railway wagons.
Technical facilities:
•
•
•
•
•
•
•
Ship-to-shore gantry crane- 40 / 60 t
Shore cranes- 40 t
Gantry cranes- 32 / 40 t
Straddle carrier- 40 t
Reach-stackers- 10 t
Mobile harbor crane- 100 t
95 stations for refrigerated containers
Range of services:
•
•
•
•
•
•
•
•
loading / unloading,
all kind of container handling services,
stuffing, stripping, sampling, tallying, shifting ect.
depot services (storage, repairs, washing, cleaning),
goods storage on the yard,
goods storage in the warehouse,
consulting services
assistance in contacts with administration Autorities
and institutions (Custom Office, Sanitary Office,
Veterinary Border Inspection)
Specjalizacja:
Nietypowe formowanie
i rozformowywanie kontenerów
• Ładunki sypkie
• Sztuki ciężkie
• Drobnica
Ładunki sypkie:
Sztuki ciężkie:
Drobnica:
GTK Co. Strengths:
•
•
•
•
•
•
strong bussines relations with our customers,
experienced personnel with deep knowledge of the market and the
core of business,
wide range of services (container terminal, containers’ repairs,
container depot, containers’ stuffing & stripping services),
friendly IT software - SOTeK,
possibility of an automatic access and transfer the system data
based on EDIFACT standard,
good location with increasing potential with road access to the
terminal premises after completion the tunnel building under port
cannal.
0
Railway Companies providing
services to GTK Co.:
•
•
•
•
•
•
PKP Cargo
Spedcont
Prokont
Polzug
Cargosped
PCC Intermodal
CONTAINER FEEDER SERVICES
UNIFEEDER (calling twice a week ):
Gdynia- Gdańsk (GTK)- Rotterdam
Gdynia- Gdańsk (GTK)- Szczecin Bremerhaven- Hamburg
Tallin
CMA - CGM (calling once a week ):
Hamburg- Gdańsk (GTK)- Kaliningrad Tallin- Hamburg
Kaliningrad
HAMBURG
BREMERHAVEN
ROTTERDAM
PORT OF GDAŃSK
Szczecin
Major shipping lines handled at GTK:
Hanjin
Evergreen
Hapag Lloyd
APL
CMA-CGM
Cosco
UASC
MOL
Hamburg SÜd
ZIM
CSAV
China Shipping
Yang Ming
EUCON
NYK Line
K-Line
NORASIA
ANL
Hyundai
OOCL
DELTA
DELMAS
Delphis
Business Activity:
• Ship handling: 24 hours a day, 7 days a
week,
• Handling of the container inland transport:
from 7.00 a.m. on Monday until 3.00 p.m.
on Saturday.
Contact:
Gdańsk Container Terminal Co.
Headquarter: Na Zaspę 3, 80-546 Gdańsk, Poland
Port Office:– ul. M. Chodackiego; Szczecińskie Quay
NIP: 583-25-55-159
KRS: 0000108214; Register Court in Gdańsk
Initial capital: PLN 500.140,00
Tel.: +(48) 58 737 72 69
+(48) 58 737 72 71
+(48) 58 737 72 74
+(48) 58 737 70 60
Fax: +(48) 58 737 72 75
E-mail: [email protected]
www.gtk-sa.pl
Office working hours:
8.00 a.m. to 4.00 p.m. from Monday to Friday