Transcript TRENDS IN TURKISH ENVIRONMENTAL LEGISLATION
Republic of Turkey Ministry of Environment and Forestry
A National Prioritized Project Pipeline and Environmental Operational Program
Background Environmental Heavy Cost Investments Planning (EHCIP) Project (Nov. 2003 – Nov. 2005):
• • • • • Investment Packages Component of the project: Long list of the projects collected through questionnaires 2 widely participated workshops (April 2004 and June 2005) from all the relevant stakeholders including governmental organizations, NGOs, universities, municipalities "Project Ranking Methodology“ and "Project Prioritization Manual“ were identified.
Screening and ranking of the projects Selection of the 6 demonstrative investment projects (solid waste, waste water, air quality) under EHCIP Project 2
Republic of Turkey Ministry of Environment and Forestry
Background – EHCIP Project Selection of 6 Demonstrative Project: Request for projects for pipeline Response rate 50% => 250+ project ideas Revise method & Ranked list Stakeholder workshop Screening: EU relevance Commenced?
Project ranking methodology Pre-appraisal of 16 projects 12 projects ”suitable”
Republic of Turkey Ministry of Environment and Forestry
6 out of 12 selected
3
Background – EHCIP Project Assessment of Prioritization under EHCIP Project: The process
• Systematic • Rational • Stakeholder involvement • Free from political interference
Results:
The six highest ranked projects – Air (1) Karabük AQ management project (No investment component) – Water (2) Nevşehir WWTP project (2006 Program) Tokat WWTP project (2006 Program) – Waste (2) Çanakkale SWM Project (2005 Program) Kuşadası SWM Project (2005 Program) – Industrial Pollution Control (1) Dilovası OID Pollution Control Project : IPC Project (under tendering through external credit) : AQM Project 4
Republic of Turkey Ministry of Environment and Forestry
Background
• • •
New Prioritization Study (2006-2007) :
Questionnaires were sent to 450 municipalities over 50.000 populations (census 2000) and about 300 applications were received.
Complementary data from İller Bank, TurkStat, SPO, DSI, Treasury.
The same screening and ranking criteria as defined by EHCIP Project
140 120 100 80 60 40 20 0 127 51 83 18 WWT and network Network Drinking Water Waste 4 Air 5 Integrated
Figure 1:
Distribution of the project proposals
6 Others
Republic of Turkey Ministry of Environment and Forestry
5
Screening and Ranking Criteria
1) National Project Prioritization List A. Screening Criteria B. Ranking Criteria
Item
Sector Relevance Project Indicative Budget Main beneficiary
Criteria
Water/Wastewater Waste Management The Project should represent an investment of at least EUR 5 million The direct beneficiary must not be private sector 1. Environmental Criteria 2. Technical Criteria 3. Economical Criteria 4. Financial Criteria 5. Project-Specific Criteria 6. Institutional Criteria TOTAL 24,41 18,43 17,85 15,40 13,72 10,19 100 6
RESULTS - Prioritized Pipeline
• After the screening, the national prioritized pipeline is composed of totally 131 projects; – 61 wastewater projects – 52 solid waste projects – 18 drinking water projects 14% 40% Solid waste wastewater drinking water 46% • Finally, 3 separate sectoral pipelines for; wastewater, - drinking water, - solid waste .
Figure 2:
Distribution of the ranked projects
**The final pipeline is published as sectoral ranking lists in the website of the MoEF ( www.did-cevreorman.gov.tr
). Also, a Final Report on the prioritization study is published on the website.
7
RESULTS –
Indicative List of Major Projects • An indicative shortlist of the prioritized major projects (>10 M €) is annexed to Environmental Operational Program (OP Env) for 2007-2009 period with the relevant financing tables • Technical Assistance Projects are being undertaken to prepare IPA investment packages for the projects in the indicative list of OP-Env. 8
ENVIRONMENT OPERATIONAL PROGRAM State of Play with EOP: EOP sets the Program Strategy and Financial Plan for environment sector under IPA Program for 2007 2009 Period.
Final Draft of Environment OP was submitted to the European Commission in October 2007.
Approval of EOP is expected by the end of 2007.
9
EOP – PROGRAM STRATEGY
Priority Axes: Priority Axis 1: Improvement of water supply, sewerage system and wastewater treatment Measure 1.1:
Imrpovement of water supply quality
Measure 1.2:
Improvement of recieving body quality
Priority Axis 2: management Development of integrated solid waste Measure 2:
Increasing of waste recycling and improvement of sanitary landfill systems 10
EOP – PROGRAM STRATEGY
Priority Axes: Priority 3: Technical Assistance Measure 3.1:
Enhancing the management of Environment Operational Program
Measure 3.2:
Enhancing the planning capacities of the Final Beneficiaries 11
EOP – FINANCIAL TABLE FOR 2007-2009
PRIORITY AXES EOP
(%) Priority 1 (Water Supply + Wastewater Treatment) Priority 2 (Integrated SWM) Priority 3 (Technical Assistance) TOPLAM 65.80
28.20
6.00
100
EU IPA
(MEUR) (%75) 134.3
NATIONAL CO_FINANCE
(MEUR) (%25) 44.8
TOPLAM (MEUR)
179.1
57.5
12.3
204.1
19.2
4 68.0
76.7
16.3
272.1
12
EOP – INDICATIVE LIST OF MAJOR PROJECTS
Solid Waste Management Wastewater Management Water Supply TOTAL
# of Projects (>10 MEUR) Indicative Budget (MEUR)
10 12 4 26 186.3
236.8
70.2
493.3
13
INDICATIVE MAJOR PROJECTS Priority 1: - 12 Wastewater Projects - 4 Drinking Water Projects Priority 2: - 10 Solid Waste Projects 14
Republic of Turkey Ministry of Environment and Forestry