Protecting Electric Power Systems

Download Report

Transcript Protecting Electric Power Systems

SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2011

Simon R. Chano

Protection Specialist

Hydro Québec TransÉnergie 2, Complexe Desjardins, tour Est 9ième étage C.P. 10000 Montréal, QC H5B 1H7

SC B5- STRATEGIC ACTIVITIES

Synthesizing and disseminating state of-the-art practices and developing recommendations For the engineering of power system progress of protection , automation , monitoring and metering 2011 - 09 -15 Simon R. Chano, Hydro Québec TransÉnergie 2

SC B5 Thematic Groups

TG51

V. Leitoff (FR) Substation Automation and Remote Control

TG52 S. Chano (CA) TG53 R. Adams (UK)

Protection & Monitoring of Main Plant and Circuits Monitoring, Metering, Recording and Overall Power System Protection

TG54 I. Mesmaeker (CH)

Tutorials Simon R. Chano, Hydro Québec TransÉnergie 2011 - 09 -15 3

Substation Automation Curren t Issues

• • • • • •

IEC 61850 – Widespread application and acceptance Documentation Training Testing – Deficiencies in reference material – Lack of reference tutorials – New requirements for commissioning and maintenance Engineering tools – The key for a efficient IEC 61850 implementation The Process Bus – The technology is mature for implementation in real projects.

Working Groups

• • • •

WG B5.39: Documentation

Requirements for DSAS

WG B5.42: WG B5.45:

Experience Concerning

Availability and Reliability

Acceptance, Commissioning and Field

Testing WG B5.40: Education

and Qualification of Engineers in P & C 2011 - 09 -15 Simon R. Chano, Hydro Québec TransÉnergie 4

Protection and Monitoring Current Issues Working Groups

2011 - 09 -15 • • • •

FACTS & HVDC Special equipments New Sensors – Protection requirements – Modeling and transients Training – Requirements and impacts on AC protection – Guide lines for digital protection application

• • • • • • •

WG B5-23: Short Circuit Protection of Mixed Conductor Networks JWG B5/B4/C4-25: Impact of HVDC Station on AC Protection WG B5-37: Protection, Monitoring and Control of Shunt Reactors WG B5-24: Transients on V & I Digital Acquisition Chain WG B5-27: Benefits of Standardized Protection Schemes WG B5-36: Application IEC61850 for Protection Schemes Based on WG B5.44: Protection Schemes for Special Transformers

Simon R. Chano, Hydro Québec TransÉnergie 5

Network Requirements Current Issues

• • • •

WAMPS – New requirements and impacts Communication Information – Coordination of communication performance and protection requirements.

Systems – Protection management, automated fault analysis, asset management.

Network of the future – Local and wide area Coordination of protection and control.

Working Groups

2011 - 09 -15 • • • • •

WG B5-14: Wide Area Protection & Control Technologies JWG B5/D2-30: Communications for Protection & WAMPS WG B5-31: Management of Protection Settings WG B5.41: Metering Systems for Billing Purposes WG B5.43: Coordination of P & C of Future Network

Simon R. Chano, Hydro Québec TransÉnergie 6

SC B5 Next Colloquium and Future meetings

• • •

Switzerland 2011 – Preferential Subjects

PS1 - IEC 61850: Which tools for which user PS2 - Protection of Hybrid Line/Cable PS3 - Performance of Protection Systems. Whilst the

Network is under Stress

• •

France 2012 – Preferential Subjects

PS1 - Coordination of Protection and Control for the

Network of the Future

PS2 - Use of remote access for protection and automation systems - application and developments

Brazil 2013

• With local Protection & Automation Symposium Simon R. Chano, Hydro Québec TransÉnergie 2011 - 09 -15 7

Web site

SC address : web site is

http://www.cigre-b5.org

Pour information additionnelle /For additional information, me contacter / you can contact me: [email protected]

Simon R. Chano, Hydro Québec TransÉnergie 2011 - 09 -15 8