Transcript Protecting Electric Power Systems
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2011
Simon R. Chano
Protection Specialist
Hydro Québec TransÉnergie 2, Complexe Desjardins, tour Est 9ième étage C.P. 10000 Montréal, QC H5B 1H7
SC B5- STRATEGIC ACTIVITIES
Synthesizing and disseminating state of-the-art practices and developing recommendations For the engineering of power system progress of protection , automation , monitoring and metering 2011 - 09 -15 Simon R. Chano, Hydro Québec TransÉnergie 2
SC B5 Thematic Groups
TG51
V. Leitoff (FR) Substation Automation and Remote Control
TG52 S. Chano (CA) TG53 R. Adams (UK)
Protection & Monitoring of Main Plant and Circuits Monitoring, Metering, Recording and Overall Power System Protection
TG54 I. Mesmaeker (CH)
Tutorials Simon R. Chano, Hydro Québec TransÉnergie 2011 - 09 -15 3
Substation Automation Curren t Issues
• • • • • •
IEC 61850 – Widespread application and acceptance Documentation Training Testing – Deficiencies in reference material – Lack of reference tutorials – New requirements for commissioning and maintenance Engineering tools – The key for a efficient IEC 61850 implementation The Process Bus – The technology is mature for implementation in real projects.
Working Groups
• • • •
WG B5.39: Documentation
Requirements for DSAS
WG B5.42: WG B5.45:
Experience Concerning
Availability and Reliability
Acceptance, Commissioning and Field
Testing WG B5.40: Education
and Qualification of Engineers in P & C 2011 - 09 -15 Simon R. Chano, Hydro Québec TransÉnergie 4
Protection and Monitoring Current Issues Working Groups
2011 - 09 -15 • • • •
FACTS & HVDC Special equipments New Sensors – Protection requirements – Modeling and transients Training – Requirements and impacts on AC protection – Guide lines for digital protection application
• • • • • • •
WG B5-23: Short Circuit Protection of Mixed Conductor Networks JWG B5/B4/C4-25: Impact of HVDC Station on AC Protection WG B5-37: Protection, Monitoring and Control of Shunt Reactors WG B5-24: Transients on V & I Digital Acquisition Chain WG B5-27: Benefits of Standardized Protection Schemes WG B5-36: Application IEC61850 for Protection Schemes Based on WG B5.44: Protection Schemes for Special Transformers
Simon R. Chano, Hydro Québec TransÉnergie 5
Network Requirements Current Issues
• • • •
WAMPS – New requirements and impacts Communication Information – Coordination of communication performance and protection requirements.
Systems – Protection management, automated fault analysis, asset management.
Network of the future – Local and wide area Coordination of protection and control.
Working Groups
2011 - 09 -15 • • • • •
WG B5-14: Wide Area Protection & Control Technologies JWG B5/D2-30: Communications for Protection & WAMPS WG B5-31: Management of Protection Settings WG B5.41: Metering Systems for Billing Purposes WG B5.43: Coordination of P & C of Future Network
Simon R. Chano, Hydro Québec TransÉnergie 6
SC B5 Next Colloquium and Future meetings
• • •
Switzerland 2011 – Preferential Subjects
PS1 - IEC 61850: Which tools for which user PS2 - Protection of Hybrid Line/Cable PS3 - Performance of Protection Systems. Whilst the
Network is under Stress
• •
France 2012 – Preferential Subjects
PS1 - Coordination of Protection and Control for the
Network of the Future
PS2 - Use of remote access for protection and automation systems - application and developments
Brazil 2013
• With local Protection & Automation Symposium Simon R. Chano, Hydro Québec TransÉnergie 2011 - 09 -15 7
Web site
•
SC address : web site is
http://www.cigre-b5.org
•
Pour information additionnelle /For additional information, me contacter / you can contact me: [email protected]
Simon R. Chano, Hydro Québec TransÉnergie 2011 - 09 -15 8