Transcript Folie 1
TRANS-CSP NREA Study Project TRANS-CSP Trans-Mediterranean Interconnection for Concentrating Solar Power (WP01 Transmission Technologies) Project for the Research & Development Programme of the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) TRANS-CSP WP01 Transmission Technologies Scope: Assessment, characterisation and comparison of technology options for the transmission of solar electricity produced by Concentrating Solar Power Plants or by other renewables from MENA to Europe Result: High Voltage Direct Current transmission (HVDC) is the least cost and most efficient solution TRANS-CSP Power transmission via Hydrogen is possible, but 75 % of the solar electricity would be lost. TRANS-CSP After closing the Mediterranean Ring in 2010, about 0.5 % of European electricity demand could be imported through the conventional AC grid. If upgraded to European standards, 3 %. However, 45 % of the solar electricity would be lost over 3000 km. Source: OME TRANS-CSP Security and Redundancy of Power Supply by a Future TRANS-Mediterranean HVDC Grid High Voltage Direct Current (HVDC) power transmission looses only 10 % over 3000 km distance. Like interstate highways, HVDC lines will serve long distance transfer, with only few outlets to the conventional Alternating Current (AC) grid which will be used analogue to country roads and city streets. By 2050, 700 TWh/y solar electricity could be imported from 20 locations in MENA at a cost of 5 c/kWh providing about 15 % of European electricity demand. TRANS-CSP Options for Solar Electricity Transfer over 3000 km Distance Solar Power Transfer by: Hydrogen AC / HVAC HVDC Line Losses 75 % 45 % / 25 % 10 % Cost very high high low Adaptation to Consumers (Transformer) has to be transformed to AC first directly transformable has to be transformed to AC first Over Sea Transport by tankers or pipelines not over 30 km standard solution Visibility Impact very low high low Materials and Emissions moderate moderate low Preferred Application eventually fuel for transport regional and local power long distance power transfer TRANS-CSP Total EU-MENA HVDC Interconnection 2020 – 2050 * Year 2020 2030 2040 2050 Capacity GW 2x5 8x5 14 x 5 20 x 5 Transfer TWh/y 60 230 470 700 Capacity Factor 0.60 0.67 0.75 0.80 Turnover Billion €/y 3.8 12.5 24 35 Land Area km x km CSP HVDC 15 x 15 30 x 30 40 x 40 50 x 50 3100 x 0.1 3600 x 0.4 3600 x 0.7 3600 x 1.0 Investment Billion € CSP HVDC 42 5 134 16 245 31 350 45 Elec. Cost €/kWh CSP HVDC 0.050 0.014 0.045 0.010 0.040 0.010 0.040 0.010 * All countries analysed in TRANS-CSP TRANS-CSP Interconnecting HVDC* to the AC** System Monopolar HVDC System, e.g. sea cable Bipolar HVDC System, e.g. overhead line Source: ABB * HVDC High Voltage Direct Current (electricity flows steadily from a negative to a positive pole) ** AC Alternating Current (the flow direction is reversed 50 or 60 times per second) TRANS-CSP Cost of HVDC and HVAC Links with 5 GW Capacity Cost of 5 GW Overhead Link 4500 Investment [M€] 4000 3500 3000 2500 2000 1500 1000 500 0 0 1000 2000 3000 Distance [km] 1150 kV HVAC HVDC High Voltage Direct Current HVAC High Voltage Alternating Current ± 800 kV HVDC 4000 TRANS-CSP Space required for 10 GW Power Transmission (Quelle: ABB, erweitert) AC Alternate Current HVDC High Voltage Direct Current UHVDC Ultra High Voltage Direct Current TRANS-CSP HVDC is well established, transmitting 75 GW world wide, mainly remote hydro- and geothermal power Source: ABB TRANS-CSP Solar Import Electricity in TWh/y Year Austria Cyprus Denmark Finland France Czech Republic Belgium Ireland Luxembourg Netherlands Sweden Switzerland United Kingdom Poland Bulgaria Slowac Republic Slowenia Germany Hungary Greece Italy Malta Portugal Spain Turkey Macedonia Croatia Romania Serbia & Montenegro Bosnia-Herzegowina Iceland Norway Total 2000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2010 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2020 0 0 0 0 10 0 0 0 0 5 0 0 0 0 0 0 0 15 0 0 10 0 0 15 5 0 0 0 0 0 0 0 60 2030 0 0 2 0 35 5 10 0 0 10 0 0 15 15 4 2 0 40 8 5 25 0 0 25 15 0 0 15 0 0 0 0 231 2040 0 0 3 0 70 15 16 0 0 15 0 0 35 50 6 8 0 80 10 10 45 0 0 35 45 0 0 30 0 0 0 0 473 2050 0 0 5 0 110 30 24 0 0 17,5 0 0 65 90 6,5 12,5 0 120 12 15 60 0 0 45 60 0 0 35 0 0 0 0 707,5 TRANS-CSP Solar Import Capacity in GW Year Austria Cyprus Denmark Finland France Czech Republic Belgium Ireland Luxembourg Netherlands Sweden Switzerland United Kingdom Poland Bulgaria Slowac Republic Slowenia Germany Hungary Greece Italy Malta Portugal Spain Turkey Macedonia Croatia Romania Serbia & Montenegro Bosnia-Herzegowina Iceland Norway Total 2000 0,00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2010 0,00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2020 0,00 0 0 0 2 0 0 0 0 1 0 0 0 0 0 0 0 3 0 0 2 0 0 2,5 1 0 0 0 0 0 0 0 11,5 2030 0,00 0 0,4 0 5 1 2 0 0 1,5 0 0 2,5 2,5 0,75 0,5 0 6 1,5 1 5 0 0 4 2,5 0 0 3 0 0 0 0 38,65 2040 0,00 0 0,5 0 9 2 2,5 0 0 2 0 0 5 8 1 1,5 0 11 1,75 1,5 8 0 0 5 6 0 0 5 0 0 0 0 69,25 2050 0,00 0 0,75 0 15 4 3,5 0 0 2,4 0 0 9 14 1 2 0 16 2 2 10 0 0 8 7,5 0 0 5 0 0 0 0 102,15