JKIA Stakeholder Presentation

Download Report

Transcript JKIA Stakeholder Presentation

Investment Opportunities- KAA
By
Henry Ogoye
[email protected]
Head of Corporate Planning and Strategy
9th December 2013
Outline




Background
Traffic Performance and Outlook
Investment Areas and
Investment Climate
2
2
KAA: Background
-
-
Established in 1991 by an Act of Parliament, the KAA Act
Provides and manages aviation infrastructure, facilities and
services.
Manages:
- 4 IA- Nairobi, Moi, Eldoret and Kisumu ;
- 4 DA- Wilson, Malindi, Lokichoggio and Wajir; and
- 6 AS- Ukunda, Manda, Kitale, Garissa, Lodwar, Kakamega.
Nairobi Airport- flagship facility
- Main gateway in the East & Central Africa region,
- Currently serves over 30 scheduled airlines,
- Catchment area: EU, the ME, the FE and African Region,
- Accounts for about 75% of national aviation traffic and
- Among the busiest airports in Africa w.r.t. pax (cargo) traffic
3
3
Nairobi Airport:
Traffic Performance Vs Design Capacity
4
4
Nairobi Airport:
Traffic Performance Vs Design Capacity (Cont’d)
5
5
Nairobi Airport- Traffic Outlook: 2012-2030
6
6
Nairobi Airport- Unit 4 and Re-organization
- Terminal 4 – 2.5 million capacity. Acquisition & installation of
BHS, PBB, Security, ICT & CE in progress. Cost US$ 110 MAFD, WB & KAA. Partial commissioning - 2014
- T4 Arrivals Building – February 2015. Estimated cost US$ 25.8
M- WB
- Reorganization of Units 1,2 and 3 for modernization and space –
2016 Estimated Cost-US$ 150M. EIB – US$93 Million.
- Contractors /Funding.
7
Terminal Unit 4
8
View from the East
9
View after expansion programme for unit 1 to 4
infill 1
Level 2 separation
Walkways
Unit 2
Infill 2
Unit 1
Unit 4
Unit 3
Multi-Storey
Car Park
New Apron
10
10
Green Field Terminal
– 178,000 M2 terminal building on 4 levels
– 50 international Check-in positions
– 32 Contact and 8 Remote gates
– 45 Aircraft stand apron
– Landside and Airside roadwork
– Associated utilities
– Railways terminal- construction- KRC
11
11
Green Field Terminal Cont.
–
–
–
–
–
Passenger Boarding Bridges - JBT Aerotech Corporation (USA)
Airport Security Equipment – L-3 (USA)
Airport Seats – Kusch Co. (Germany)
Airport Information systems – Airolusion (UK)
Electrical Switchgear, Control Systems & Generators – Schneider
Electric (France)
– Generators – Caterpillar (USA)
– Baggage Handling System – Vanderlande Industries B.V Netherlands
12
12
Green Field Terminal (Cont).
– Estimated Cost: US$ 654 Million- Loan + Own Funds
– Contractor: Pascall + Watson architects/Anhui Construction
Group JV – UK/China
– Supervision- Loius Berger Group, Inc
– Status: Ground breaking - 3rd December 2013.
- Investment Opportunities: Duty free, Transit Hotel- 50 rooms
and Commercially Important Persons Lounge
13
13
Greenfield bird’s eye view
14
Second Runway
– Length: 5.5 km- Code F: 60m wide by 15m shoulders,
– Direct flights to New York 6403 NM at 32 ton payload 89%
LF,
– ICAO CAT II compliant to allow landing and takeoff in bad
weather,
– Estimated Cost: US$ 180Million,
– Investment Opportunities:
- Detailed Design under AfDB funding; and
- Funding/Construction /supply of equipment
15
15
Moi Airport Pavement Works
– Pavement rehabilitation to support operations;
– Estimated Cost: US$100 million: World Bank ;
– Tendering for construction scheduled to commence in 2014;
and
– Investment Opportunity: Construction and Equipment Supply .
16
16
Other Investment Opportunities
– Cargo warehouse in Kisumu
– Special Economic Zone at Nairobi Airport (NA) to host MUB;
– Investors to participate in mapping of potential businesses for
the SEZ- NA;
– 2nd Specialized Freight Area- NA; and
– Airport City- convention centers, airport hotel, hospitals,
shopping malls and golf course- NA.
17
17
Investment Climate
– PPP Act 2013 and associated Regulations- legal and
regulatory certainty to investors,
– GoK also putting in place the necessary infrastructure to ease
cost of doing business in Kenya and
– Attractive fiscal regime.
18
18