Transcript Document

Development of Regional Aviation in Russia 2009
Copyright CorganDyer 2009
• Anglo-American design company
• Main offices in London, Dallas and Moscow
• 300 employees
• Fully licensed to trade in Russia
• Full range of architectural and engineering design services provided
Current project locations in Russia .....
Moscow
Voronezh
Orel
Nizhny Novgorod
Cheboksary
Ufa
Perm
Saratov
Volgograd
Krasnodar
Sochi
Omsk
We offer a multitude of design services
that meet rigorous aviation demands
•
Airport Planning
•
Terminal Design
•
Airport Facilities
•
Airline Facilities
Selected Client List
Aer Lingus
Frontier Airlines
Air France
Japan Airlines
Air India
JFK International Airport
Alitalia Airlines
KLM
American Airlines
Korean Air
Asiana Airlines
Miami International Airport
British Airways
Northwest Airlines
BAA
Sabena Airlines
Continental Airlines
Southwest Airlines
DFW International Airport
Swiss Air
Detroit Metro Int. Airport
Turin/Casella Airport
Delta Airlines
United Airlines
Egypt Air
Principles for success in regional airport projects •
Operational-based, flight schedule driven,
briefing
•
Adherence to business plan objectives
•
Defining, and then meeting, or exceeding
customer service standards
•
Comprehensive integration of technical
systems, including; building services, baggage,
security, communications and data systems
•
Commitment to development and
implementation of effective security systems
and processes
•
Design excellence
TERMINAL E
GEORGE BUSH INTERCONTINENTAL
Description: This facility provides
600,000 SF of new construction
including 23 new swing gates for
Continental Airlines. The new terminal
is a three level, dual pier arrangement
which provides independent operations
at each gate position.
Location: Houston, Texas
Completed Date: July 2004
Cost: $200,000,000+
TERMINAL D
DFW INTERNATIONAL AIRPORT
Description: DFW International Airport
developed a new 2 Million SF terminal to
house all international operations. The
terminal includes: Two Ticketing Halls,
Concourses, Concession Areas, A
Customs Hall, Bag Claim Areas, Airline
Clubs, Automated People Mover Stations,
and an Integrated 300-Room Hotel.
Location: DFW Airport, Texas
Completed Date: 2005
Cost: $753,000,000
MAYNARD H. JACKSON
INTERNATIONAL TERMINAL
Description: The new terminal will
provide supplemental international
passenger processing capability through
a 16-gate international terminal served
by a new landside terminal roadway
system and garage. It will connect with
the existing terminal and concourses by
way of a people-mover extension and
multiple passenger walkways.
Location: Atlanta, Georgia
Completed Date: In Progress
Cost: $790,000,000
TERMINAL EXPANSION
CHANGSHA, CHINA
Description: This facility provides 1.25
million new SF to China’s Changsha
Airport. The terminal expansion
includes: 6 additional international and
22 domestic gates with ticketing, bag
claim and international passenger
processing capacity.
Location: Changsha, China
LOVE FIELD TERMINAL
MODERNIZATION PROGRAM
Description: The project includes
the replacement of the 3 existing
concourses with one single new
concourse, constructed in a phased
manner to preserve active gate count.
The existing Terminal building and bag
claim hall will be heavily renovated, and
the ticketing wing will be replaced. The
final Terminal configuration will include
approximately 750,000 SF and will
accommodate 20 narrow body gates.
Location: Dallas, Texas
Completed Date: In Progress
Cost: $500,000,000+
DELTA AIR LINES ATO RENOVATION
HARSTFIELD-JACKSON
Description: A new, open plan for the
ticketing hall and ATO support offices
improves intuitive way finding and also
creates room for ticket queuing. The
new layout increases exposure to
concessions and improves passenger
flow through three additional security
checkpoint lanes.
Location: Atlanta, Georgia
Completed Date: July 2007
Cost: $220,000,000
DFW AIRPORT CONSOLIDATED
RENTAL CAR FACILITY
Description: To accommodate the
rapid growth of rental companies, the
new facility was designed to house 11
companies, with planned expansion on
the ground level. The new 24-hour
facility includes a two-story, 1.4 M SF
parking structure which accommodates
5,000 cars and a 16,000 SF six bay bus
maintenance facility. Also there are 11
exclusive use service facilities
independent of the main building where
each of the rental car companies wash
and prepare their vehicles, and perform
light maintenance.
Location: Dallas, Texas
Completed Date: 2001
Cost: $142,000,000+
AMERICAN AIRLINES AIRCRAFT
MAINTENANCE HANGAR
Description: This C-Check
Maintenance Hangar built at Alliance
Field totals 780,000 SF and is the
largest cantilevered hangar in the
world. It is capable of simultaneously
servicing seven aircraft. Combinations
include Boeing 767 and 757, Airbus
A300, and McDonnell Douglas MD-11
airframes. The hangar has a 260 foot,
clear-span cantilever structure free of
interior columns and is designed to
accommodate the addition of three
future bays.
Location: Fort Worth, Texas
Cost: $90,000,000
Mixed Use Development,
Voronezh
Mixed Use Development
Zhukovsky
We can help deliver your vision….
• Masterplanning
• Concept Design
• Proekt Design
• Project Delivery