Transcript Document
GuoNeng Electricals, China GNE Business Sectors • Power Generations – Energy Solutions – – – – Project Engineering Machinery Supply Auto Control Solutions Parts & Services • Environmental Protections – Total Solutions – Thermal power plant by burning urban garbage – Ethonol Vinasse treatment GNE Power Generation-Thermal • Steam Boiler – CFB/PC/Bagasse/Biomass • Steam Turbine – Condensing/Extraction/Back Pressure • Turbo Generator – Direct Coupling/Gearbox, Air/Hytrogen Cooling • Total Controls – DCS/PLC, Instrumentations GNE Power Generation-Hydro • Hydro Turbine – Axial Inflow/Intrusion/Pressure Inflow • Hydro Generator – Single Shaft/Gearbox • Total Controls – DCS/PLC, Instrumentations GNE Power Generation-Thermal • Business Associated with: – CNIEC, CHEC – GXYA – China Science Group – Hualan Engineering – Top Brands of Manufacturers …… GNE Sound Track GNE • Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mw, major boiler, turbine, generator plus auxiliaries, 3 sets • Heat and Power Plants for Sugar Mills:bagasse boiler 35-85t/h, turbo generator 3-12mw,major boiler, turbine, generator plus auxiliaries, 5 sets • Heat and Power Plants for Textile, Chemical Mills:CFB/PC boiler 35-120t/h turbo generator 3-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets • Thermal Power Plants of Burning Urban Garbage:CFB boiler 35-65t/h, turbo generator 6-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets • Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d • Auto Controls: DCS, PLC, Instrumentations: 60 sets • Hydro Power Plant:3-10mw: major boiler, turbine, generator plus auxiliaries, 2 sets Typical Thermal Power Plant • Huaxing Power Plant, Baise, China • Boiler:1*220t/h CFB, 9.81MPa, 540℃ • Turbo Generator: 1*50MW, 9.0MPa, 500℃ • Completion: Dec., 2004 • Notes: Second hand turbo generator, made in 1959 Total Plant Turbo Generator Control Room GNE DCS Operator Station Feed Pumps Captive Power Plant (1) • • • • • Deyongjia Garment Plant, Dongguan, China Boiler:4×75t/h, CFB, 3.98MPa, 450℃ Turbine:15MW 3.5MPa 435℃ DCS:BTG synchronized auto controls Date of Completion: May, 2001 Total Plant TG Set GNE Control Room Power Panels Coal Conveying Captive Power Plant (2) • • • • GNE #1、#2、#3、#4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters Power Plant – Burning Garbage • • • • • Dongguan Garbage Power Plant, 2×15+ 1×12mw, 1200t/d garbage handling, Guangdong, China Ningbo Garbage Power Plant, 2×15mw, 800t/d garbage handling, Zhejiang, China Boiler:65t/h CFB, 3.98MPa 450℃ Turbo Generator:15mw, 3.5MPa, 435℃ Date of Completion: Dongguan-March, 2005, Ningbo-Dec., 2005 Dongguan Plant Ningbo Plant Control Room GNE CFB Boiler Turbo Generator International Projects • • • AA Group, 300t/h, CFB,Biomass, Thailand Boiler:300t/h, CFB, 9.8MPa, 540℃ Date of Completion:under construction, to commissioning in Oct. 2008 Signing Ceremony Technical Agreement Signing Site Survey GNE Site Survey China Representatives International Projects GNE • SSYPL, 2*35t/h, CFB,2*7.5MW STG, India • 2009.04.25 Signing of contract with SSYPL Signing Ceremony International Projects Lhoknga 2×16MW Power Plant EP Project, Indonesia • Boiler:75t/h,CFBC Boiler, 3.9MPa, 450℃ • Steam turbine and generator:15MW, 3.5MPa, 435℃ • Associated with CHEC, 2006 Used plant package supplied to Indonesia, 2008. • Boiler: 2×75t/h,CFBC Boiler, 3.9MPa, 450℃ • Steam turbine and generator:2×15MW, 3.5MPa, 435℃ HFO DG Sets, 4×10MW, 2008, package supplied to Indonesia • 4×10MW, HFO DG Sets • Associated with GD Imp/Exp Corp. GNE International Projects India KPPL 2×25MW thermal power plant EP Project • Boiler:2×130t/h, PC Boiler, 3.9MPa, 450℃ • Steam turbine and generator:2×25MW, 3.5MPa, 435℃ GNE Contract Signing Typical International Projects SSYPL, Surat, India - Boiler: CFB, 2x35t/h, 3.82MPa, 450 ℃ - TG: 2x7.5MW, 3.82MPa, 435 ℃ GNE DCS Applications Typical DCS installed: • • • • • • GNE XDPS-400, Shanghai Xinhua MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell PLC Applications Typical PLC installed: • • • • GNE S7-200/S7-300, Siemens Schneider Allen Bradley FX2N, Mitsubishi Installed Instrumentations Pressure Transmitters 50MW Turbo Generator Drum leveler Temprature Probe GNE Generator Hydrogen Cooling Speed Sensors Sony Video Camera Industrial Monitors Typical Projects #1、#2、#3、#4 Boiler auto controls, Baiganhua, Baise, China • • • GNE Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters GNE GuoNeng Electricals Ltd. Addr.: Rm1612, Xincheng Int’l Bldg, No.92-1, Nanning, Guangxi, 530028 China Tel: 0771-5511310 5501300 Fax: 0771-5511852 Email: [email protected]