Transcript Document

GuoNeng Electricals, China
GNE
Business Sectors
• Power Generations – Energy Solutions
–
–
–
–
Project Engineering
Machinery Supply
Auto Control Solutions
Parts & Services
• Environmental Protections – Total
Solutions
– Thermal power plant by burning urban
garbage
– Ethonol Vinasse treatment
GNE
Power Generation-Thermal
• Steam Boiler
– CFB/PC/Bagasse/Biomass
• Steam Turbine
– Condensing/Extraction/Back Pressure
• Turbo Generator
– Direct Coupling/Gearbox, Air/Hytrogen
Cooling
• Total Controls
– DCS/PLC, Instrumentations
GNE
Power Generation-Hydro
• Hydro Turbine
– Axial Inflow/Intrusion/Pressure
Inflow
• Hydro Generator
– Single Shaft/Gearbox
• Total Controls
– DCS/PLC, Instrumentations
GNE
Power Generation-Thermal
• Business Associated with:
– CNIEC, CHEC
– GXYA
– China Science Group
– Hualan Engineering
– Top Brands of Manufacturers
……
GNE
Sound Track
GNE
•
Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mw,
major boiler, turbine, generator plus auxiliaries, 3 sets
•
Heat and Power Plants for Sugar Mills:bagasse boiler 35-85t/h, turbo
generator 3-12mw,major boiler, turbine, generator plus auxiliaries, 5 sets
•
Heat and Power Plants for Textile, Chemical Mills:CFB/PC boiler 35-120t/h
turbo generator 3-15mw, major boiler, turbine, generator plus auxiliaries, 2
sets
•
Thermal Power Plants of Burning Urban Garbage:CFB boiler 35-65t/h, turbo
generator 6-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets
•
Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment
600t/d
•
Auto Controls: DCS, PLC, Instrumentations: 60 sets
•
Hydro Power Plant:3-10mw: major boiler, turbine, generator plus auxiliaries,
2 sets
Typical Thermal Power Plant
• Huaxing Power Plant, Baise, China
• Boiler:1*220t/h CFB, 9.81MPa, 540℃
• Turbo Generator: 1*50MW, 9.0MPa,
500℃
• Completion: Dec., 2004
• Notes: Second hand turbo generator,
made in 1959
Total Plant
Turbo Generator
Control Room
GNE
DCS Operator Station
Feed Pumps
Captive Power Plant (1)
•
•
•
•
•
Deyongjia Garment Plant, Dongguan,
China
Boiler:4×75t/h, CFB, 3.98MPa, 450℃
Turbine:15MW 3.5MPa 435℃
DCS:BTG synchronized auto controls
Date of Completion: May, 2001
Total Plant
TG Set
GNE
Control Room
Power Panels
Coal Conveying
Captive Power Plant (2)
•
•
•
•
GNE
#1、#2、#3、#4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China
Honeywell HC-900 DCS system
All boilers communicate to each other plus remote controls
EJA series pressure transmitters, ZKZ series control valves , Wayleber
flow meters
Power Plant – Burning Garbage
•
•
•
•
•
Dongguan Garbage Power Plant, 2×15+
1×12mw, 1200t/d garbage handling,
Guangdong, China
Ningbo Garbage Power Plant, 2×15mw, 800t/d
garbage handling, Zhejiang, China
Boiler:65t/h CFB, 3.98MPa 450℃
Turbo Generator:15mw, 3.5MPa, 435℃
Date of Completion: Dongguan-March, 2005,
Ningbo-Dec., 2005
Dongguan Plant
Ningbo Plant
Control Room
GNE
CFB Boiler
Turbo Generator
International Projects
•
•
•
AA Group, 300t/h, CFB,Biomass,
Thailand
Boiler:300t/h, CFB, 9.8MPa, 540℃
Date of Completion:under construction,
to commissioning in Oct. 2008
Signing Ceremony
Technical Agreement
Signing
Site Survey
GNE
Site Survey
China Representatives
International Projects
GNE
•
SSYPL, 2*35t/h, CFB,2*7.5MW STG, India
•
2009.04.25 Signing of contract with SSYPL
Signing Ceremony
International Projects
Lhoknga 2×16MW Power Plant EP Project, Indonesia
• Boiler:75t/h,CFBC Boiler, 3.9MPa, 450℃
• Steam turbine and generator:15MW, 3.5MPa, 435℃
• Associated with CHEC, 2006
Used plant package supplied to Indonesia, 2008.
• Boiler: 2×75t/h,CFBC Boiler, 3.9MPa, 450℃
• Steam turbine and generator:2×15MW, 3.5MPa, 435℃
HFO DG Sets, 4×10MW, 2008, package supplied to Indonesia
• 4×10MW, HFO DG Sets
• Associated with GD Imp/Exp Corp.
GNE
International Projects
India KPPL 2×25MW thermal power plant EP Project
• Boiler:2×130t/h, PC Boiler, 3.9MPa, 450℃
• Steam turbine and generator:2×25MW, 3.5MPa, 435℃
GNE
Contract Signing
Typical International Projects
 SSYPL, Surat, India
- Boiler: CFB, 2x35t/h, 3.82MPa, 450 ℃
- TG: 2x7.5MW, 3.82MPa, 435 ℃
GNE
DCS Applications
Typical DCS installed:
•
•
•
•
•
•
GNE
XDPS-400, Shanghai Xinhua
MACS, Beijing Hollysys
WebField ECS-100, Supcon
PCS7, Siemens
Florence 2000, ABB
UMC-800/HC900, Honeywell
PLC Applications
Typical PLC installed:
•
•
•
•
GNE
S7-200/S7-300, Siemens
Schneider
Allen Bradley
FX2N, Mitsubishi
Installed Instrumentations
Pressure
Transmitters
50MW Turbo
Generator
Drum leveler
Temprature
Probe
GNE
Generator Hydrogen
Cooling
Speed Sensors
Sony Video Camera
Industrial
Monitors
Typical Projects
#1、#2、#3、#4 Boiler auto controls, Baiganhua, Baise, China
•
•
•
GNE
Honeywell HC-900 DCS system
All boilers communicate to each other plus remote controls
EJA series pressure transmitters, ZKZ series control valves ,
Wayleber flow meters
GNE
GuoNeng Electricals Ltd.
Addr.: Rm1612, Xincheng Int’l Bldg, No.92-1,
Nanning, Guangxi, 530028 China
Tel: 0771-5511310 5501300
Fax: 0771-5511852
Email: [email protected]