EGCO Presentation

Download Report

Transcript EGCO Presentation

ENGINEER GENRAL CON.CO. (EGCO)
ENG.ABDEL MOETY AMER & CO.
Web site : www.egcoegypt.com
Email : egco @ egcoegypt.com
More than twenty years of experience
ENGINEER GENERAL CON.CO.(EGCO):
ENG.ABDEL MOUTY AMER.
EGCO, OUR COMPANY, HAS BEEN ESTABLISHED IN 1985, BY A VERY HIGH QUALIFIED
GROUP OF CIVIL, MECHANICAL, ELECTRICAL AND ARCHITECTURAL ENGINEERS.
WE HAVE A VERY GOOD EXPERIENCE OVER 20 YEARS IN THE CONSTRUCTION OF
PROJECTS FOR WATER SUPPLY AND WASTE WATER FACILITIES.
WE ARE WORKING HARD TO KEEP A GREAT COORDINATION BETWEEN OUR
PROFESSIONAL EMPLOYEES AND THE MANAGEMENT OF OUR DEPARTMENTS,
MAINTAINING THE HIGHTEST STANDARD OF QUALITY.
SO WE INVITE YOU TO TAKE A LOOK AT OUR BROCHURE, WISHING ALL PROGRESS
AND SUCCESS FOR EGCO.
COMMITMENT TO QUALITY, SERVICE, FUNCTION AND VALUE REMAINS AT THE HEART
OF EVERYTHING WE DO.
ENG.ABDEL MOُُETY AMER
CHAIRMAN OF THE BOARD
CHAIRMAN AND MANAGING
DIRECTOR
PUBLIC
RELATION
TECHNICAL
MANAGER
ADMINISTRATIVE
MANAGER
PLANNING
CONTRACTS
TENDERS
RESEARCH
GENERAL
PROJECTS
MANAGER
EXECUTIVE
MANAGER
HUMAN
RESOURCES
AND TRAINING
LEGAL
AFFAIRS
IT
MANAGER
EXECUTIVE
SECRETARY
QUALITY CONTROL
MANAGER
FINANCIAL
MANAGER
SUBCONTRACTORS
CASH
STORES
ACCOUNTS
SECRETERIAL
INTERNAL
PREVIEW
ADVANCE
GENERAL
LEDGER
AUDITING TENDERS
RESEARCH
DOCUMENTATION
CONTROL
CONTRACTS,
OFFERS &
CASHIER
QUALITY
CONTROL
PURCHASING
INFORMATION
STATICS
STORAGE
EXECUTIVE
WORKS PREVIEW
SITE ENGINEER
MANAGERS
PROJECTS COSTS
MECHANICAL
EQUIPEMENTS
MANAGERS
BANKS &
INVESTMENTS
Sr.
Quality ( Item )
Quantity
1
Excavator ( Komatsu ) PC 200/2
2
2
Excavator ( Komatsu ) PC 200/3
2
3
Excavator ( Komatsu ) PC 120/5
5
4
Excavator ( Komatsu ) PC 120/6
2
5
Loader ( Komatsu ) WA 350
2
6
Loader ( Komatsu ) W 60
2
7
Loader ( Komatsu ) WA 40
1
8
Crane FMC ( 18 Ton )
2
9
Moving mixer 1m 3
4
10
Well point system with accessories
32
11
Jet pump 4 inch
6
12
Deep well pump (Ferbank ) 30 H.P 100 m3/h with accessories
20
13
Generator ( Komatsu ) 230 K.V.A
4
14
Generator ( Helwan ) 60 K.V.A
3
15
Distribution panels for operation pumps
3
16
Air compressor( Atlas )
3
Sr.
Quality ( Item )
Quantity
17
Concrete Vibrator ( Honda5 ) 5.5 H.P
8
18
Submersible pump (Tesromi ) 220 Volt
13
19
Dewatering pump ( kobbota )
6
20
Truck ( 3 Ton )
6
21
Water truck
6
22
Diesel truck
3
23
Welding Machine Doeits 400 Amb
3
24
Mercedes Car ML 320
1
25
Peugeot car GLX 405
1
26
Mitsubishi Lancer
1
27
Mitsubishi truck car ( 5 Ton )
1
28
Pick up Chevrolet car
8
29
Dogan car SLX 1600
1
30
Shaheen car 1400
1
31
Computer Network
1
32
Personal Computer
22
33
Printer
8
NO
NAME
POSITION
YEARS
OF
EXPERIENCE
QUALIFICATION
YEARS
WITH
THE
FIRM
1
Abdel Moety Mohamed
Amer
Chairman of the board.
36
B.Sc. of Mechanical Eng. Cairo Univ.
1968
19 Years
2
Ahmed El Sayed Amer
General Executive
Manager
19
B.Sc. of Science, 1985
16 Years
3
Abdel Moneim Zayed
Technical Dept. Manager
29
B.Sc. of Mechanical Eng. 1975
6 Years
4
Mohsen El Shabrawi
Project Manager
21
B.Sc. of Civil Eng. 1983
3 Years
5
Helal Aziz Sharobim
Maintenance Engineer
27
B.Sc. of Mechanical Eng. 1977
6 Years
6
Mostapha EL Tabei
Chemical Engineer
26
B.Sc. of chemical Eng. 1978
8 Years
7
Ahmed Sabry NourEldeen
Project Manager
21
B.Sc. of Civil Eng. 1983
6 Years
8
Ahmed Mohamed Elbieh
Site Engineer
16
B.Sc. of Civil Eng. 1987
1 Year
9
Baher Mikhaeil
Shenouda
Site Engineer
15
B.Sc. of Civil Eng. 1988
4 Years
10
Fathy Elsaid Almoursy
Site Engineer
6
B.Sc. of civil Eng. 1997
4 months
11
Mohamed Bayomi
Ramadan
Computer Engineer
9
B.Sc. of Science Technology 1995
3 Years
12
Ahmed Adel Mahmoud
Technical Dept. Engineer
1
B.Sc. of civil Eng. 2003
18
months
13
Sameh Nabil Abdel Hadi
Site Engineer
3
B.Sc. of civil Eng. 2000
6 months
NAME
14
Hassan Moh. Mohei El Din
Accountant
16
Faculty of Commerce 1985
10 Years
15
Mohamed Omar
Financial Manager
26
Faculty of Commerce 1975
10 Years
16
Ali Abdel Al Saleh
Financial & Admin.
10
Faculty of Commerce 90
7 Years
17
Ibrahim Abdel Halim
Accountant
10
Faculty of Commerce 91
4 Years
18
Magdy Abou El Magd
Accountant
9
Faculty of Commerce 1992
1 months
19
Mohamed Seliman Eliwa
Accountant
4
Faculty of Commerce 1985
4 Years
20
Onsi Anwar Ali
Personnel
20
Technical Commercial High
School 1881
5 Years
21
Safwat Abdel naieem
Financial & Admin.
9
Technical Commercial High
School 1881
7 Years
22
Osama Anwar Ali
Admin. Manager
20
Faculty of Commerce 1985
20
23
Hisham
Helal
Accountant
1
Faculty of Commerce 2003
1
24
Amal Abdel Megeed
Accountant
4
Faculty of Commerce 2000
1
25
Heba Ali Mourad
Special Secretary
4
Faculty of Agriculture 2000
1
26
Ebtihal Gamal Eldeen
General Secretary
10
Faculty of Law
1993
2
27
Yasmien Saleh Mahmoud
Receptionist
2
Faculty of Law
2002
1
moniem
QUALIFICATION
YEARS
WITH
THE
FIRM
NO
Abdel
POSITION
YEARS
OF
EXPERIENCE
NO
NAME
POSITION
YEARS OF
EXPERIENCE
QUALIFICATION
YEARS
WITH THE
FIRM
28
Fouad Nabil Sobhy
Surveyor
8
Industrial High School 1993
3 Years
29
Ezzat Khalaf Hassan
Surveyor
5
High School for Area measurements 1996
4 Years
30
Ahmed Abdel Hafiz
Surveyor
4
Technical Industrial high school 1997
4 Years
31
Mohamed Roshdy Ahmed
Surveyor
4
High School for Area measurements 1997
4 Years
32
Taha Bassiouny Mohamed
Surveyor
4
Technical Industrial high school 1997
4 Years
33
Moustafa
Wakeel
Technical Supervisor
13
Technical Industrial high school 1988
7 Years
34
Hazem Abdalla El Mougi
Technical Supervisor
13
Technical high School 1988
3 Years
35
Ibrahim El Sayed Bayoumy
Technical Supervisor
12
Technical Industrial high school 1989
5 Years
36
Mohamed El Sherbini
Technical Supervisor
9
Technical Industrial High School 1992
7 Years
37
Ramadan Shaaban
Technical Supervisor
10
Technical Industrial high school 1991
7 Years
38
Maged Abdel Moneim
Technical Supervisor
7
Technical Industrial high school 94
5 Years
39
Mohsen Aboul Leil
Technical Supervisor
18
Agriculture Science high school 1994
40
Nabil Aboul Leil
Store Keeper
15
Technical Commercial high school 1986
6 Years
41
Mohamed Badr El Din
Purchasing Representative
12
Technical Commercial high school 1989
5 Years
42
Mohamed Ibrahim
Moustafa
Store Keeper
14
Agriculture Science high school 1987
5 Years
43
Ali El Sayed Ali
Store Keeper
14
Agriculture Science high school 1987
5 Years
44
Aref Sabry Sharaf
Store Keeper
8
Faculty of letter 1993
4 Years
A.
Fatah
El
4 months
NO
NAME
POSITION
YEARS OF
EXPERIENCE
QUALIFICATION
YEARS
WITH THE
FIRM
45
Wael Ahmed El Sheikh
Plumber
9
Technical Industrial high school 1992
4 Years
46
Attia Mansour Ahmed
Plumber
6
47
Essam Abdel Moety
Plumber
9
Technical commercial high school 93
6 Years
48
Abdel Nasser Abdel
Khalek
Plumber
-
-
5 Years
49
Amgad El Shahat
Plumber
-
-
4 Years
50
Mosaad Sallam
carpenter
9
Preparatory School 1992
4 Years
51
Gamal Hussein
Electrician
21
Industrial High School 1980
7 Years
52
Wagih Mansour
Electrician
16
Industrial High School 1985
5 Years
53
Hesham Taha
Electrician
14
Technical Industrial High School 1987
5 Years
54
Hassan Abdel Azim
Electrician
-
Industrial High School 1979
5 Years
55
Khaled Galal El Din
Electrician
4
Technical Industrial High School 1997
3 Years
56
Alaa Abdel Gawaad
Technician
-
-
5 Years
57
Mohamed Mekki
Mechanic
-
-
1 Year
58
Atif Abdel Hamid
Mechanic
-
-
9 Years
59
Mahmoud Hafez Mahmoud
Mechanic
-
-
6 Years
60
Emad El Sayed Attia
Mechanic
-
Primary school 1982
5 Years
Carpentry high school
1996
7 Years
NO
1
2
3
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLIO
N
1985- 1986
POTABLE WATER
PIPES AT: MEET MAZAH
& MEET ALI VILLAGES
DAKAHLIA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF ASBESTOS
CEMENT PIPES LINE, DIAMETERS 150 MM &
200 MM INCLUDING VALVES, SPECIAL
PIECES, VALVES CHAMBERS AND HOUSE
CONNECTIONS.
MINISTRY OF
RECONSTRUCTIO
N AND HOUSING
AT DAKAHLIA
GOVERNORATE.
1.5
1985-1986
SEWAGE DRAINAGE
NETWORK AT 10TH OF
RAMADAN AREA GAMASSA CITY.
DAKAHLIA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
175 MM UP TO 600 MM INCLUDING THE
INSTALLATION OF SQUARE AND CIRCULAR
PLAIN CONCRETE MANHOLES, BASED ON
WELL-POINT SYSTEM DEWATERING.
MINISTRY OF
RECONSTRUCTIO
N AND HOUSING
AT DAKAHLIA
GOVERNORATE.
2.0
1985-1986
SEWAGE PUMPING
STATION AND SUPPLY
OF MECHANICAL AND
ELECTRICAL
EQUIPMENTS AT THE
10TH OF RAMADAN
AREA - GAMASSA CITY
. DAKAHLIA
GOVERNORATE –
EGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE
PUMPING STATION INCLUDING EXCAVATION
WORKS, PLAIN & REINFORCED CONCRETE
WORKS, PUMPS-ROOM, BUILDINGS AND
FINISHINGS.
PLUS OF SUPPLY AND ERECTION OF
MECHANICAL AND ELECTRICAL
EQUIPMENTS, BASED ON WELL–POINT
SYSTEM DEWATERING.
MINISTRY OF
RECONSTRUCTIO
N AND HOUSING
AT DAKAHLIA
GOVERNORATE.
2.0
NO
4
5
6
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1986-1987
POTABLE WATER
PIPES LINE AT NEW
EZBET EL SAIIDIA
VILLAGE.
DAKAHLIA
GOVERNORATE.
EGYPT.
SUPPLY AND INSTALL OF ASBESTOS
CEMENT PIPES LINE, DIAMETERS 150
MM & 200 MM INCLUDING VALVES,
SPECIAL PIECES, VALVES CHAMBERS
AND HOUSE CONNECTIONS.
MINISTRY OF
RECONSTRUCTI
ON AND
HOUSING AT
DAKAHLIA
GOVERNORATE
.
1.5
1986-1987
SEWAGE DRAINAGE
NETWORK AT 5TH
AREA – GAMASSA
TOURIST AREA.
DAKAHLIA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED
CLAY PIPES WITH RIGID JOINTS,
DIAMETERS FROM 175 MM UP TO 450 MM
INCLUDING THE INSTALLATION OF
SQUARE AND CIRCULAR PLAIN
CONCRETE MANHOLES, BASED ON
WELL-POINT SYSTEM DEWATERING.
MINISTRY OF
RECONSTRUCTI
ON AND
HOUSING AT
DAKAHLIA
GOVERNORATE
.
1.5
1986- 1987
SEWAGE PUMPING
STATION AND
SUPPLY OF
MECHANICAL AND
ELECTRICAL
EQUIPMENTS AT 5TH
AREA - GAMASSA
CITY. DAKAHLIA
GOVERNORATEEGYPT.
SUPPLY AND CONSTRUCTION OF
SEWAGE PUMPING STATION INCLUDING
EXCAVATION WORKS, FOUNDATIONS,
PLAIN & REINFORCED CONCRETE
BUILDINGS, ISOLATIONS, FINISHINGS
AND OUTSIDE FENCE.
PLUS OF SUPPLY AND ERECTION OF
MECHANICAL AND ELECTRICAL
EQUIPMENTS FOR THE STATION, BASED
ON WELL-POINT SYSTEM DEWATERING.
MINISTRY OF
RECONSTRUCTI
ON AND
HOUSING AT
DAKAHLIA
GOVERNORATE
.
1.5
NO
7
8
9
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1986-1987
SEWAGE PUMPING
STATION AND SUPPLY
OF MECHANICAL AND
ELECTRICAL
EQUIPMENTS AT 2ND
AREA -GAMASSA CITY
DAKAHLIA
GOVERNORATEEGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE
PUMPING STATION INCLUDING EXCAVATION
WORKS, FOUNDATIONS, PLAIN &
REINFORCED CONCRETE BUILDINGS,
ISOLATIONS, FINISHINGS AND OUTSIDE
FENCE.
PLUS OF SUPPLY AND ERECTION OF
MECHANICAL AND ELECTRICAL
EQUIPMENTS FOR THE STATION, BASED ON
WELL-POINT SYSTEM DEWATERING.
MINISTRY OF
RECONSTRUCTIO
N AND HOUSING
AT DAKAHLIA
GOVERNORATE.
1.5
1987-1988
SEWAGE DRAINAGE
NETWORK AND
DEWATERING FOR
INDUSTRIAL AREA AT
NEW DAMIETTA CITY.
DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF GRP, PVC AND
PRE-STRESS PIPES, DIAMETERS FROM 200
MM UP TO 1000 MM INCLUDING SUPPLY AND
INSTALL OF SQUARE AND CIRCULAR
CONCRETE MANHOLES, BASED ON WELLPOINT SYSTEM DEWATERING.
ARAB
CONTRACTORTANTA BRANCH.
AUTHORITY OF
RECONSTRUCTIO
N OF NEW
DAMIETTA CITY.
5.5
1988
POTABLE WATER
PIPES LINE DIAMETER
1000 MM AND
DEWATERING AT NEW
DAMIETTA CITY.
DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF PRE-STRESS
CONCRETE PIPES, DIAMETER 1000 MM.
PLUS OF SUPPLY AND INSTALL OF VALVES
CHAMBERS AND SPECIAL PIECES, BASED
ON WELL-POINT SYSTEM DEWATERING.
ARAB
CONTRACTORTANTA BRANCH.
AUTHORITY OF
RECONSTRUCTIO
N OF NEW
DAMIETTA CITY.
4.5
NO
10
11
12
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1989-1990
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT
DELENGATE CITY
(PART 1).
EL BEHERA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 500 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES
BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB
CONTRACTORSALEX BRANCH.
FOR THE
(NOPWASD).
3.0
1990-1991
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT
DELENGATE CITY
(PART 2).
EL BEHERA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 500 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES,
BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB
CONTRACTORS –
ALEX BRANCH.
FOR THE
(NOPWASD).
3.5
1991-1992
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT
KHANKA CITY.
GREAT CAIRO-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 600 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES,
BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB
CONTRACTORS –
ALEX BRANCH.
FOR THE
(NOPWASD).
2.0
NO
13
14
15
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1992-1993
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT
DAMANHOUR CITY
(PART 1).
EL BEHERA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 750 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES,
BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB
CONTRACTORSALEX BRANCH.
FOR THE
(NOPWASD).
3.0
1992-1993
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT
DAMANHOUR CITY
(PART 2).
EL BEHERA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 750 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES,
BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB
CONTRACTORS –
ALEX BRANCH.
FOR THE
(NOPWASD).
3,0
1992- 1994
GRAVITY PIPES LINE
DIAMETER 1400 MM
AND DEWATERING AT
DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF GRP PIPES,
DIAMETER 1400 MM TO JOIN THE PARTIAL
STATION AND THE MAIN STATION.
PLUS OF SUPPLY AND INSTALL OF VALVES
CHAMBERS INCLUDING THE SPECIAL
PIECES, BASED ON THE WELL- POINT
SYSTEM DEWATERING.
ARAB
CONTRACTORS –
ALEX BRANCH.
FOR THE
(NOPWASD).
8.5
NO
16
17
18
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1992-1993
FORCE MAIN PIPES
LINE FOR THE SEWAGE
DRAINAGE AND
DEWATERING AT
RASSEL BAR.
DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF DUCTILE CASTIRON PIPES LINE, DIAMETER 900 MM.
PLUS OF SUPPLY AND INSTALL OF VALVES
CHAMBERS, SPECIAL PIECES, BASED ON
WELL-POINT SYSTEM DEWATERING.
ARAB
CONTRACTORSTANTA BRANCH.
FOR THE
(NOPWASD).
9,00
1995-1997
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT
EZBET EL BORG CITY.
DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
175 MM UP TO 750 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR PLAIN CONCRETE
MANHOLES, BASED ON WELL -POINT
SYSTEM DEWATERING.
ARAB
CONTRACTORSTANTA BRANCH.
FOR THE
(NOPWASD).
9.0
1995-1997
SEWAGE DRAINAGE
NETWORK, FORCE
MAIN PIPELINES AND
DEWATERING AT
HORANI CITY.
DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH RIGID JOINTS, DIAMETERS FROM
175 MM UP TO 600 MM FOR THE SEWAGE
DRAINAGE NETWORK.
PLUS OF SUPPLY SQUARE AND CIRCULAR
PLAIN CONCRETE MANHOLES, FLEXIBLE
CAST IRON FORCE MAIN PIPES LINE
DIAMETERS FROM 150 MM UP TO 200 MM,
VALVES CHAMBERS AND ITS SPECIAL
PARTS.
EL NASR
COMPANY FOR
BUILDINGS AND
CONSTRUCTIONS
.
FOR THE
(NOPWASD).
13.0
NO
19
20
21
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1996
SEWAGE PUMPING
STATIONS AT HORANI
CITY (1, 2). DAMIETTA
GOVERNORATEEGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE
PUMPING STATIONS INCLUDING
EXCAVATION WORKS, FOUNDATIONS, PLAIN
& REINFORCED CONCRETE WORKS, WELLS,
BUILDINGS, FINISHING AND OUTSIDE FENCE.
EL NASR
COMPANY FOR
BUILDINGS AND
CONSTRUCTIONS
.
FOR THE
(NOPWASD).
3.0
1997
SUPPLY AND ERECTION
FOR MECHANICAL AND
ELECTRICAL
EQUIPMENTS FOR
SEWAGE PUMPING
STATIONS AT HORANI
CITY.
DAMIETTA
GOVERNORATE-EGYPT.
SUPPLY AND ERECTION OF MECHANICAL
AND ELECTRICAL EQUIPMENTS INCLUDING
PUMPS, DISTRIBUTION BOARDS,
GENERATOR UNITS, VALVES & SPECIAL
PIECES IN VALVES CHAMBERS.
EL NASR
COMPANY FOR
BUILDINGS AND
CONSTRUCTIONS
.
FOR THE
(NOPWASD).
3.0
1997-2001
GRAVITY PIPE
NETWORKS AND
DEWATERING AT
BALTIME CITY. KAFREL
SHEIKH GOVERNORATE
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 175 MM UP TO 750 MM.
PLUS OF SUPPLY AND INSTALL OF SQUARE
& CIRCULAR CONCRETE MANHOLES, BASED
ON WELL-POINT & DEEP-WELL SYSTEMS
DEWATERING.
INDUSTRIAL &
ENGINEERING
PROJECTS
COMPANY.
FOR THE
(NOPWASD)
42.0
NO
22
23
24
PERIOD
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1998-2001
SEWAGE PUMPING
STATIONS (1,2) AT
BALTIME CITY. KAFREL
SHEIKH GOVERNORATE
EGYPT.
SUPPLY AND CONSTRUCTION OF
ENGINEERING WORKS FOR PUMPING
STATIONS INCLUDING EXCAVATION WORKS,
FOUNDATIONS, PLAIN & REINFORCED
CONCRETE WORKS, WELL WORKS,
BUILDINGS, FINISHING AND OUTSIDE FENCE.
INDUSTRIAL &
ENGINEERING
PROJECTS
COMPANY.
FOR THE
(NOPWASD).
6.0
1999-2000
PILES FOR CROSSING
CANAL OF MAHMOUDIA
AT ABOU HOMOSSZAWYETTE GHAZAL.
EL BEHERA
GOVERNORATEEGYPT.
SUPPLY AND CONSTRUCTION OF 16 M
LENGTH OF PILES FROM IRON PIPES,
DIAMETER 600 MM.
PLUS OF CONSTRUCTION OF REINFORCED
CONCRETE COLUMNS AND RETAINING
WALLS OF AN IRON BRIDGE TO SUPPORT
FLEXIBLE CAST IRON PIPES.
INDUSTRIAL &
ENGINEERING
PROJECTS
COMPANY.
FOR THE
(NOPWASD).
3.0
1999-2001
SEWAGE DRAINAGE
NETWORK AND
DEWATERING AT EL
MAASARA & HELWAN.
CAIRO GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 200 MM UP TO 500 MM.
PLUS OF CONSTRUCTION OF SQUARE &
CIRCULAR CONCRETE MANHOLES, BASED
ON DEEP- WELL SYSTEM DEWATERING.
ARAB
CONTRACTORS –
HELWAN
BRANCH.
GREAT CAIRO
RECONSTRUCTIO
N AUTHORITY
9.0
NO
25
26
27
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
1999-2000
POTABLE WATER
PIPES LINE AT EAST
KANTARA CITYEGYPT.
SUPPLY AND INSTALL OF GRP PIPES,
DIAMETER 500MM.
PLUS OF CONSTRUCTION OF CONCRETE
CHAMBERS, SPECIAL PIECES, UNDER
CROSSING ABOVE CANALS AND
DRAINAGES.
ENGINEERING
INDUSTRIAL
PROJECTS
COMPANY.
SOUTH SINAI
RECONSTRUCTIO
N AUTHORITY.
20.0
1999-2002
SEWAGE DRAINAGE
NETWORK AND
SEWAGE PUMPING
STATIONS AT
BATANOUN CITY.
MOUNIFIA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 200 MM UP TO 750 MM INCLUDING THE
SUPPLY AND INSTALL OF SQUARE AND
CIRCULAR CONCRETE MANHOLES.
PLUS OF CONSTRUCTION OF SEWAGE
PUMPING STATIONS INCLUDING THE CIVIL
WORKS, BASED ON THE DEEP WELL SYSTEM
DEWATERING.
ENGINEERING
AND INDUSTRIAL
PROJECTS
COMPANY.
FOR THE
(NOPWASD).
10.0
2001-2002
IRRIGATION PIPE LINES
AT AHMED DAWOUD
CANAL – DEWIDAR
AREA.
NORTH SINAI
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF GRP PIPES,
DIAMETER 700 MM, 1200MM, 1400MM,
1600MM, 1800 MM AT DIFFERENT DEPTHS UP
TO 8M.
ENGINEERING &
INDUSTRIAL
PROJECTS
COMPANY.
NORTH SINAI
IRRIGATION
AUTHORITY.
2,00
PERIOD
NO
28
29
30
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
2002-2004
FORCE MAIN PIPELINE
FOR SEWAGE
DRAINAGE STATIONS
AT BALTIME.
KAFREL SHEIKH
GOVERNORATE
EGYPT.
SUPPLY AND INSTALL OF GRP PIPES,
DIAMETER 600MM INCLUDING THE
CONSTRUCTION OF VALVES CHAMBERS,
THE SPECIAL PIECES, UNDER CROSSINGS,
ABOVE CANALS AND DRAINAGES.
ENGINEERING &
INDUSTRIAL
PROJECTS
COMPANY.
FOR THE
(NOPWASD).
12,00
2002-2003
DEVELOPMENT OF
IRRIGATION LINES AT
EL HAMAMI CANALABOU HOMOSS.
BEHIRA
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF PLASTIC PIPES,
DIAMETERS FROM 315MM UP TO 500 MM
INCLUDING THE CONSTRUCTION OF VALVES
CHAMBERS AND THE SPECIAL PIECES.
ENGINEERING &
INDUSTRIAL
PROJECTS
COMPANY.
BEHIRA
GOVERNORATE
IRRIGATION
AUTHORITY.
6,00
2002-2003
DEVELOPMENT OF
IRRIGATION AT
KHAWALID CANAL-SIDI
SALEM.
KAFREL SHEIKH
GOVERNORATEEGYPT.
SUPPLY AND INSTALL OF PLASTIC PIPES,
DIAMETERS FROM 315 MM UP TO 500 MM
INCLUDING THE CONSTRUCTION OF VALVES
CHAMBERS AND SPECIAL PIECES.
ENGINEERING &
INDUSTRIAL
PROJECTS
COMPANY.
KAFREL SHEIKH
GOVERNORATE.
13,00
PERIOD
NO
31
PERIOD
2003-2006
NAME & LOCATION
DESCRIPTION OF PROJECT
OWNER
COST
PER
MILLION
GRAVITY PIPE
NETWORKS, SEWAGE
PUMPING STATIONS,
DEWATERING AND
FORCE MAIN PIPELINE
FOR SEWAGE DRAINAGE
STATIONS AT
TABLOUHA VILLAGE.
MENOFYA
GOVERNORATE
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY
PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 175 MM UP TO 800 MM INCLUDING THE
SUPPLY AND INSTALL OF SQUARE AND
CIRCULAR CONCRETE MANHOLES.
PLUS OF CONSTRUCTION OF SEWAGE
PUMPING STATIONS INCLUDING THE CIVIL
WORKS, BASED ON THE DEEP WELL
SYSTEM DEWATERING.
PLUS SUPPLY AND INSTALL FORCE MAIN OF
PIPE LINES, INCLUDING THE CONSTRUCTION
OF VALVES CHAMBERS, THE SPECIAL
PIECES, UNDER CROSSINGS AND OVER
CROSSINGS.
EL NASR
COMPANY FOR
BUILDINGS AND
CONSTRUCTIONS
.
FOR THE
(NOPWASD).
12,00
SEWAGE DRAINAGE NETWORKS AT 5TH AREA AT GAMASSA TOURIST
CITY, DAKAHLIA GOVERNORATE.
PROJECT
DESCRIPTION:
Construction of sewage
drainage network at the
5th area, Gamassa
Touristic city, to protect
the city from pollution
as well as encouraging
resorting and tourism.
MAIN
CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of
Reconstruction and
Housing at El Dakahlia
Governorate.
EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
450 mm, length of 8000 m and depths up to 6,50 m.

Supply and installation of 320 square & circular plain concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high
water level at this area.
COST:
1.5 Million EGP.
SEWAGE DRAINAGE NETWORK AT THE INDUSTRIAL CITY , NEW
DAMIETTA CITY
PROJECT
DESCRIPTION:
Construction of sewage
drainage network for
the industrial area at
Damietta city to
complete the existing
drainage project at the
city.
MAIN
CONTRACTOR :
Arab contractors – Tanta
branch
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
EGCO SERVICES :

Supply and installation of GRP & PVC pipes, diameters from 175 mm up to 600 mm , length of
10000 m and depths up to 8,50 m.

Supply and installation of 400 square and circular plain concrete manholes,
internal diameters from 1,20 m up to 1,50 m and depths up to 8,50 m.

The construction was based on the well-point system dewatering according to the high
water level at this area.
COST:
5.5 Million EGP.
WATER PIPELINES AT NEW DAMIETTA CITY,DAMIETTA
GOVERNORATE.
PROJECT
DESCRIPTION:
CONSTRUCTION OF
A POTABLE WATER
PIPES LINE
NETWORK,
DIAMETER OF 1000
MM, FOR THE NEW
DAMIETTA CITY, TO
COMPLETE THE
EXISTING SERVICES
AT THE CITY.
MAIN
CONTRACTOR :
Arab contractors – Tanta
branch
OWNER :
National Organization
for Potable Water and
Sanitary Drainage
COST:
4.5 Million EGP.
EGCO SERVICES :

Supply and installation of pre-stress reinforced concrete pipes, diameter of 1000 mm and
length of 1200 m including bends and plugs, etc.

Supply and installation of sluice, wash and air valves chambers including
special pieces, valves and dismantling pieces.

The construction was based on the well-point system dewatering according to the high
water level at this area.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL
DELENGAT CITY,EL BEHIRA,(PART ONE)
PROJECT DESCRIPTION:
CONSTRUCTION OF SEWAGE DRAINAGE
NETWORK AT EL DELENGAT CITY TO COMPLETE
THE EXISTING NETWORK AT EL BEHIRA
GOVERNORATE.
MAIN CONTRACTOR :
Arab contractors – Alex branch.
OWNER :
National Organization for Potable Water and
Sanitary Drainage
COST:
3 million EGP
EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
375 mm, length of 8500 m and depths up to 6,50 m.

Supply and installation of 340 square and circular plain concrete manholes,
internal diameters from 1,20 m up to 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high
water level at this area.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL
DELENGAT CITY, EL BEHIRA, (PART TWO)
PROJECT DESCRIPTION:
CONSTRUCTION OF THE SECOND PART OF
SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY
EL BEHIRA TO COMPLETE THE EXISTING NETWORK AT
GOVERNORATE
EGCO SERVICES:

Supply and installation of vitrified clay pipes with rigid joints,
diameters from 175 mm up to 375 mm, length of 8500 m and
depths up to 4.50 m.

Supply and installation of 320 square and circular plain concrete
manholes, internal diameters of 1,20 m & 1,50 m and depths up to
4,50 m.

The construction was based on the well-point system dewatering.
MAIN CONTRACTOR :
Arab contractors – Alex branch
OWNER :
National Organization for
Potable Water and
Sanitary Drainage.
COST:
3.5 million EGP.
SEWAGE DRAINAGE NETWORK AND DEWATERIND AT EL KHANKA
CITY, GREAT CAIRO.
PROJECT
DESCRIPTION:
Construction of sewage
drainage network at El
Khanka City to
complete the existing
network at Great Cairo.
MAIN
CONTRACTOR :
Arab contractors – Nasr
City branch.
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
600 mm, length of 1200 m and depths up to 6,50 m.

Supply and installation of 48 square and circular plain concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high
water level at this area.
COST:
2.0 million EGP.
GRAVITY PIPELINES NETWORK, 1400 MM DIAMETER, AND
DEWATERING AT RAS EL BAR, DAMIETTA GOVERNORATE.
PROJECT DESCRIPTION:
This project was constructed to join the partial
stations with the main station by gravity pipes line,
diameter of 1400 mm.
MAIN CONTRACTOR :
Arab contractors – Tanta branch.
OWNER :
National Organization for Potable Water and
Sanitary Drainage.
COST:
8.5 million EGP.
EGCO SERVICES :

Supply and installation of GRP pipes, diameter of 1400 mm, to join the partial stations with the
main station.

Supply and installation of slow down and sluice valves chambers including the
special pieces, valves and paddle pieces.

The construction was based on the well-point system dewatering according to the high
water level at this area.
SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH
GOVERNORATE.
PROJECT
DESCRIPTION:
CONSTRUCTION OF
GRAVITY PIPELINES,
DIAMETER OF 900 MM,
AT RAS EL BAR CITY,
TO TRANSPORT
SEWAGE TO THE
TREATMENT STATION
AND TO COMPLETE
THE EXISTING
SEWAGE DRAINAGE
NETWORK AT THE
CITY.
MAIN
CONTRACTOR :
Arab contractors – Tanta
branch.
OWNER :
National Organization
for Potable Water and
Sanitary Drainage
EGCO SERVICES :

Supply and installation of ductile cast iron pipes, diameter of 900 mm, depths from 2,50 m up
to 3,5 m and length of 9000 m.

Supply and installation of sluice, wash and air valves chambers including the
special pieces, valves, paddle and dismantling pieces.

The construction was based on the well-point system dewatering according to the high
water level at this area.
COST:
9 million EGP.
GRAVITY PIPELINES AND DEWATERING AT EZBET EL BORG CITY,
DAMIETTA GOVERNORATE.
PROJECT DESCRIPTION:
Construction of the first part of gravity
Pipes line at Ezbet El Borg according
To the need of a sewage drainage
network at this area.
EGCO SERVICES:

Supply and installation of vitrified clay pipes with rigid joints, diameter
from 175 mm up to 750 mm, length of 6000 m and depths up to 6,50 m.

Supply and installation of 400 square and circular concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering
according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Tanta branch.
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
9.0 million EGP.
POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT
THE EAST EL TAFREAA AREA.
PROJECT DESCRIPTION:
Construction of force main
pipelines, from GRP pipes,
diameter of 600 mm and length
of 14000 m, to transport the sewage
from the sewage drainage stations.
Including the construction of valves
chambers, special pieces, valves
and dismantling pieces.
EGCO SERVICES:

Supply and installation of force main pipelines from GRP pipes,
diameter of 600 mm and length of 14000 m including excavation
works, installation, test, washing, cleaning and transportation

Supply and installation of sluice, wash and air valves chambers
valves including the special pieces, valves, dismantling and wall
paddle pieces.

The construction was based on the well-point system dewatering
for levels up to 3.50 m and on the deep-well system dewatering
for levels more than 3.50 m.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization for
Potable Water and
Sanitary Drainage
COST:
12 million EGP
SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING
STATIONS AT EL BATANOUN CITY.
MAIN
CONTRACTOR :
PROJECT
DESCRIPTION:
Construction of sewage
drainage network at
Batanoun, Menoufia
Governorate according
to the Government’s
policy concerning
supplying all villages
and cities at Cairo by
the Gravity pipes
networks.
Industrial and Engineering
Projects Company.
EGCO SERVICES :
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
6 million EGP.

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
750 mm, length of 8000 m and depths up to 8.50 m.

Supply and installation of 320 square and circular concrete manholes, internal
diameters of 1,20 m & 1,50 and depths up to 8.50 m.

Supply and construction of 4 sewage pumping stations including wells works,
diameters from 3 m up to 8 m, plus of construction of extension buildings as
workshops, generator room, storage, administration building and outside fences.

The construction was based on the deep-well system dewatering according to the high
water level at this area.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL
MAASARA AND HELWAN.
PROJECT DESCRIPTION:
Construction of sewage drainage
Network At El Maasara and Helwan
areas to complete the existing network
at the Great Cairo.
EGCO SERVICES:



Supply and installation of vitrified clay pipes with flexible joints,
diameters from 200 mm up to 550 mm, length of 6500 m and
depths up to 6,50 m.
Supply and installation of 260 square and circular concrete
manholes, internal diameters of 1,20 m & 1,50 m and depths up to
6,50 m
The construction was based on the deep-well system dewatering
according to the high water level at this area.
COST:
MAIN CONTRACTOR :
Arab contractors – Helwan branch.
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
9.0 million EGP.
SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA,
GAMASSA CITY, DAKAHLIA GOVERNORATE
PROJECT
DESCRIPTION:
Construction of 2
sewage pumping
stations to transport
sewage to the treatment
station to complete the
existing network project
at Balteem.
MAIN
CONTRACTOR :
Engineer General Con. Co
OWNER :
Authority of
Reconstruction and
Housing at El Dakahlia
Governorate
EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
600 mm, length of 1200 m and depths up to 6,50 m.

Supply and installation of 320 square and circular plain concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high
water level at this area.
COST:
2.0 million EGB.
SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND
ELECTRICAL EQUIPMENTS AT THE 5 TH AREA AT GAMSSA CITY,
DAKAHLIA GOVERNORATE
PROJECT
DESCRIPTION:
Construction of sewage
drainage network at
Gamassa, Dakahlia
Governorate to
complete the network
of the city.
MAIN
CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of
Reconstruction and
Housing at El Dakahlia
Governorate
COST:
1.5 Million EGP
EGCO SERVICES :

Supply and installation of a well for the pumping station, internal diameter of 3 m including
the reinforced concrete works and the penetration until the well settles at the required level.

Construction of the extension buildings as the workshop, the generator
building, storage, security room and outside fences.

Supply and erection of mechanical and electrical equipments including submersible
pumps, generator unit, distribution boards, transformers, valves, special parts,
dismantling pieces and the installation at the valves chambers.
SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL &
ELECTRICAL EQIPMENTS AT THE 2ND AREA, GAMASSA CITY,
DAKAHLIA GOVERNORATE.
PROJECT
DESCRIPTION:
Construction of a
sewage pumping
station and supply of
mechanical & electrical
equipments at the 2nd
area to complete the
sewage drainage
network at Gamassa
city.
MAIN
CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of
Reconstruction and
Housing at El Dakahlia
Governorate..
EGCO SERVICES :

Supply and installation of a well for the pumping station, internal diameter of 4 m, including
the reinforced concrete works and the penetration until the well settles at the required level.

Construction of administrative units at the station as the workshop, the
generator building, storage, security room and outside fences.

Supply and erection of mechanical & electrical equipments including submersible
pumps, generator unit, distribution boards, transformers, valves, special pieces,
dismantling pieces and the installationation at the valves chambers
COST:
2.0 million EGP
SEWAGE DRAINAGE NETWORK AND DEWATERING AT
DAMANHOUR CITY, EL BEHIRA, (PART ONE)
MAIN CONTRACTOR :
PROJECT DESCRIPTION:
Construction of a sewage drainage
Network at Damanhour (Part one)
to complete the existing network
at middle Delta.
EGCO SERVICES:

Supply and installation of
vitrified clay pipes with rigid
joints, diameters from 175 mm
up to 750 mm, length of 10500 m
and depths up to 8,50 m.
Arab contractors – Alex branch
OWNER :
National Organization
for Potable Water and
Sanitary Drainage. .
COST:

Supply and installation of 420
square and circular plain
concrete manholes, internal
diameters of 1,20 m & 1,50 m
and depths up to 8,50 m.

The construction was based on the
well-point system dewatering
according to the high water level at
this area
3.0 million EGP
SEWAGE DRAINAGE NETWORK AND DEWATERING AT
DAMANHOUR CITY, EL BEHIRA, (PART TWO).
PROJECT DESCRIPTION:
construction of the second part of sewage drainage
network at Damanhour City to complete the existing
network project at El Behira Governorate.
MAIN CONTRACTOR :
Arab contractors – Alex branch
OWNER :
National Organization for Potable Water and
Sanitary Drainage.
COST:
3.0 million EGP
EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
750 mm, length of 4800 m and depths up to 8,50 m.

Supply and installation of 190 square and circular plain concrete manholes,
internal diameters of 1,20 mm and depths up to 8,50 m.

The construction was based on the well-point system dewatering according to the high
water level at this area.
SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH
GOVERNORATE.
PROJECT
DESCRIPTION:
Construction of 2
sewage pumping
stations to transport
sewage to the treatment
station to complete the
existing network project
at Bal teem.
MAIN
CONTRACTOR :
Industrial and Engineering
Projects Company
OWNER :
National Organization
for Potable Water and
Sanitary Drainage
EGCO SERVICES :

Supply and Construction of concrete wells, diameters of 12 m including the penetration for
wells settlement at the required level.

Supply and construction of the extension buildings as the working building,
generator building, storage, workshop, security room and the outside fences.

The construction was based on the well-point system dewatering according to the high
water level at this area.
COST:
6.0 million EGP.
Sewage pumping stations (1,2) at El Horaniy city, Damietta
Governorate
PROJECT
DESCRIPTION:
MAIN
CONTRACTOR :
Construction of the
sewage pumping
stations (1,2) and
supply of mechanical
& electrical
equipments, to
complete the sewage
drainage network
project at El Horaniy
city.
El Nasr Company for
Buildings and
constructions.
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
3.0 million EGP.
EGCO SERVICES :

Supply and Construction of reinforced concrete wells and the penetration until the wells
settles at the required level.

Supply and construction of the extension buildings as the working building,
generator building, storage, workshop, security room, the administration
building and the outside fences.

Supply and erection of electrical and mechanical equipments at the stations including
submersible pumps, generator unit, distribution board, transformers and special pieces,
valves, dismantling pieces at the valves chambers
AHMED DAOUD CANAL IRRIGATION PIPELINES AT EL DOWAIDAR
AREA, NORTH SINAI.
PROJECT
DESCRIPTION:
Construction of
irrigation lines for the
agriculture areas at
north Sinai in
accordance with the
development scheme of
this area.
MAIN
CONTRACTOR :
Industrial and Engineering
Projects Company.
OWNER :
North Sinai
Reconstruction
Authority.
EGCO SERVICES :

Supply and installation of GRP pipes, diameters of 700 mm, 1200 mm and 1400 mm, depths
from 4 m up to 7 m and length of 12000 m.
COST:
2 million EGP.
POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT
THE EAST EL TAFREAA AREA.
PROJECT DESCRIPTION:
Construction of a potable water
Pipelines from El kantara East at
EastEl Tafreaa Area to complete the
needs and the services at this area.
EGCO SERVICES:

Supply and installation of GRP pipes, diameter of 500 mm,
depths from 2,50 m up to 3,50 m and length of 25000 m.

Supply and installation of 65 sluice, wash and air valves
chambers including special pieces, valves and dismantling
pieces.

Supply and construction of under crossing roads and over
crossing canals, using excavation for the roads and piles for the
canals.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
North Sinai
Reconstruction
Authority.
COST:
15 million EGP
PILES FOR OVER CROSSING CANAL AT EL MAHMOUDIA, ABOU HOMOUS
AND ZAWIAT GHAZAL, EL BEHIRA GOVERNORATE..
PROJECT
DESCRIPTION:
In view of the need of
"Abou Homuos city" for
potable water supply,
especially the east area
of El Mahmoudia canal,
it was necessary to
construct an over
crossing for ductile
cast iron pipes,
diameter of 600 mm.
MAIN
CONTRACTOR :
Industrial and Engineering
Projects Company
OWNER :
National Organization
for Potable Water and
Sanitary Drainage..
EGCO SERVICES :

Supply and installation of 64 reinforced piles, diameter of 600 mm, length of 16 m including
tests of loading and pouring of the reinforced concrete into the piles.

Supply and construction of walls and reinforced concrete piles heads to hold
the steel bridge.
COST:
3 million EGP
GRAVITY PIPELINES NETWORK AND DEWATERING AT BALTEEM
CITY, KAFR EL SHEIKH GOVERNORATE.
PROJECT DESCRIPTION:
Construction of a sewage drainage network at Balteem
city to complete services at all villages and cities in
Egypt.
EGCO SERVICES:

Supply and installation of vitrified clay pipes with flexible joints, diameters
from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m.

Supply and installation of 1200 square and circular concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 4

The construction was based on the well-point system dewatering for
depths up to 3,50 m and on the deep well system dewatering for depths
more than 3,50 m.

Demolition and reconstruction of water supply networks which facing
the execution of the network project.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
42.0 million EGP.
Sewage Drainage network, force main pipelines and Dewaterimg at
El Horani city, Damietta Governorate..
PROJECT DESCRIPTION:
Construction of a sewage drainage network at El Horani city, Damietta
Governorate, according to the Government policy
to complete the construction of all
sewage drainage networks at all villages and cities in Egypt
EGCO SERVICES:

Supply and installation of vitrified clay pipes with rigid joints, diameters
from 175 mm up to 600 mm, depths up to 6,50 m and length of 12500 m.

Supply and installation of 500 square and circular concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

Supply and installation of ductile cast iron pipes, diameters of 150 mm
& 200 mm and length of 6000 m including valves chambers, special
pieces, valves and dismantling pieces.

Supply and construction of under crossing roads and over crossing
canals including isolated iron pipes, diameters of 200 mm & 150 mm
and the chambers on the crossing sides.
MAIN CONTRACTOR :
El Nasr for buildings and Constructions.
OWNER :
National Organization for
Potable Water and Sanitary
Drainage.
COST:
13.0 million EGP.
WATER PIPELINES AT MEETMAZAH AND MEETALI VILLAGES,
DAKAHLIA GOVERNORATE.
PROJECT DESCRIPTION:
Supply
and
modification
of
Potable
water
network
at
Meetmazah and
villages.
Meetali
EGCO SERVICES:

Supply and installation of potable water network from Asbestos pipes, diameters of
150 mm & 200 mm and lenglh of 18000 m.

Supply and installation of valve diameters of 150 mm & 200 mm including special pieces
of bends, tees and reducers, etc, along the network.

Joining the housing connections with the main network.
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of Reconstruction and Housing at El Dakahlia
Governorate.
COST:
1.5 Million EGP.
POTABLE WATER PIPELINES AT NEW SAIIDIA VILLAGE, DAKAHLIA
GOVERNORATE.
PROJECT DESCRIPTION:
Modification
of
the
existing
potable
water
network
at El Saiidia
Governorate.
village,
Dakahlia
EGCO SERVICES:

Supply and installation of potable water network from Asbestos pipes, diameters of
150 mm and 200 mm and length of 6500 m.

Supply and installation of valves, diameters of 150 mm & 200 mm including bends, tees
and reducers, Etc.

Supply and installation of potable water pipes for the house connections.
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of Reconstruction and Housing at El Dakahlia
Governorate.
COST:
2.0 Million EGP.
DEVELOPING OF THE IRRIGATION PROJECT AT EL HAMAMI
CANAL, ABOU HOMOUS, EL BEHIRA GOVERNORATE.
PROJECT DESCRIPTION:
Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to
save the waste water resulting from the use of old-fashioned irrigation
system.
EGCO SERVICES:

Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save
the waste water resulting from the use of old-fashioned irrigation system.

Supply and installation of 240 valves chambers including valves, diameter of 250 mm.

Supply and construction of 38 irrigation stations, wells for pulling, places for the pumps
and horizontal containers including excavation works and reinforced & plain concrete
foundations, walls and ceilings.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
Irrigation development Authority at the Ministry of the General
affairs.
COST:
6 million EGP
DEVELOPMENT OF IRRIGATION PROJECT AT EL KHAWALED
CANAL, SEDY SALEM, KAFR EL SHIEKH GOVERNORATE.
PROJECT DESCRIPTION:
Construction of irrigation pipeline system at El Khawaled canal, Sedy Salem, to
save the waste water resulting from the use of old-fashioned irrigation
system
EGCO SERVICES:

Supply and installation of plastic pipes, diameters of 315 mm, 355 mm, 400mm & 500
mm and length of 49000 m including excavation works, installationations and tests.

Supply and installation of 680 valves chambers including valves, diameter of 250 mm.

Supply and construction of 78 irrigation stations, wells for pulling, places for the pumps
and horizontal containers including excavation works, reinforced & plain concrete
foundations, walls and ceilings.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
Irrigation development Authority at the Ministry of General affairs.
COST:
13.0 million EGP
CONSTRUCTION OF GRAVITY PIPES NETWORK FOR TABLOUHA
CITY WITH THE WELL POINT IN KAFR EL SHEIKH
PROJECT
DESCRIPTION:
Construction of a
sewage drainage
network at Tablouha
city to complete
services at all villages
and cities in Egypt.
MAIN
CONTRACTOR :
Industrial and Engineering
Projects Company
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
30 million EGP.
EGCO SERVICES :

Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to
750 mm, depths up to 8,50 m and length of 30000 m.

Supply and installation of 1200 square and circular concrete manholes,
internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.

The construction was based on the well-point system dewatering for depths up to 3,50
m and on the deep well system dewatering for depths more than 3,50 m.

Demolition and reconstruction of water supply networks which facing the execution of
the network project.
SEWAGE PUMPING STATIONS (1,2) AT TABLOHA, KAFR EL SHEIKH
GOVERNORATE.
PROJECT
DESCRIPTION:
Construction of 2
sewage pumping
stations totransport
sewage to the
treatment station to
complete the existing
network project at
Tablouha.
MAIN CONTRACTOR
Industrial and Engineering
Projects Company.
OWNER :
National Organization
for Potable Water and
Sanitary Drainage.
COST:
4 million EGP
EGCO SERVICES :

Supply and Construction of concrete wells, diameters of 12 m including the penetration for
wells settlement at the required level.

Supply and construction of the extension buildings as the working building,
generator building, storage, workshop, security room and the outside fences.

The construction was based on the well-point system dewatering according to the high
water level at this area.
Arabian Cement Project
Water Transmission Pipe Line ( Kattamia - Ein ELsokhna road) .
PROJECT DESCRIPTION:
Supply and install upvc water pipes with diameter 355
mm of working pressure 10 ,16 bar length of 15 km
including Wash, Air chambers and Tunnels . In addition
to supply and build reinforced concrete ground tanks
capacity of 4000 m3 within the factory and another 750
m3 capacity in pumping stations.In addition to the
ordinary work including excavation , PC , RC ,and
finishing the work and including the supply and install
of Pumps ,generators, cranes, chlorination systems,
water hammer systems , the earthing and fire alarm
systems Inside Pumping stations.In addition to the
supply and installation of internal water networks of
diameters 160 mm , 110 mm and 63 mm for all the
buildings inside the factory and connecting the ground
tank to cement product water tanks and build Pump
chambers for water transfer from the ground tank to
the internal water networks.
EGCO SERVICES :
MAIN CONTRACTOR :
Engineer General
Contracting Company
OWNER :
Arabian Cement
Company
Consultant :
Arab Consulting
Engineers – Reliance
Heavy Industries
COST: 20 million EGP.

Supply and install upvc water pipes with diameter 355 mm length of 15 km including Wash , air chambers and Tunnels ( Kattamia
– Ein El El sokhna road ) the Arab cement company – ( quarries road) .

Supply and install RC ground tank with capacity of 4000 m3 including all concrete works . inlet and outlet chambers and their
Pipe works .

Supply and install all the ordinary works for the Pumping stations including ground tanks with capacity of 750 m3, Pumps
chambers , Cranes , Gates , Garde room , Fence , and Generating chambers .

Supply and install the Mechanical and Electrical equipments for Pumping stations including Pumps , Generators , Cranes ,
Panel
boards , Cables , Earthing systems , Water hummer systems , Fire alarm and Control system .

Supply and install PVC pipes for the internal water pipe network with diameters of (160,110,63 )mm with length of
2500 m