Transcript Martin St P.S.
Information Open House
March 10, 2015
7 – 9 pm
Tonight
we will have several information
stations for the public to visit.
Please visit those areas that you are
interested in and ask questions of the staff.
Pick up a copy of the feedback form to
provide us with your thoughts on the
project.
Follow the progress on the Board’s web
site.
Information
stations:
Planning enrolments and demographics.
Draft options for the project.
Photos of ‘typical’ new features found in
recently constructed schools.
Pick up your feed back form.
Halton
DSB has projected enrolment
growth in Milton.
There are currently no new sites to
construct a school on. (there will be sites
in the future)
Board staff suggested that we use an
existing school/site and make it larger.
The Ministry of Education has approved the
funding for a new school on the Martin St.
P.S. site.
Several options are being considered and
will be explained at the information
evening.
A
‘new’ school would be designed to
include the following:
Junior Kindergarten to grade 8
740 pupil places
Speciality rooms for science, technology and
music
Larger gymnasium
Support rooms
In
addition to the new building there are
site related items that will also be looked
at:
Parking
Bus loop/drop off
Car loop/drop off
Playground
Kindergarten play area
Remove
the existing building.
Build new school in the location of the
original building.
Recreate or relocate heritage parts of the
original building.
Students would have to be relocated off
site during construction.
Schedule would be longer than other
options.
Build
in the existing location of the school.
Students would have to be located off site
at other school(s).
Existing sections or parts of the school
could be reused.
Timing of the building and student moves
need to be known and targets reached.
Lowers the ‘change’ to the area.
Build
a new ‘school’ next to the existing
building.
May allow for students to remain on site.
Enables the ‘move’ into the new building
to occur at almost anytime.
Some restricted use of the existing site
during construction.
Safety and scheduling must be coordinated
There
are some unique characteristics of
the site:
Located behind existing residential homes.
Looped drive is behind homes.
Rail line to the South West.
Triangular shape of the property.
History of the building.
We
have created a form for you to provide
us with your feedback on the project.
Feel free to pick up a copy at the
information meeting or on line.
Or submit your comments in your own
form.
Please return the form to ‘Gerry Cullen’ at
the JW Singleton Center by March 23, 2015
You can use any schools mail system.
Staff
will be gathering information from
tonight, the Architect, the Town of Milton
and Region of Halton.
A report will be prepared by staff
recommending a specific approach to this
project.
Trustees will set the direction at a meeting
in May/June.
Following
approval of the approach staff
will proceed with the details of design and
approval.
Only after an option is approved will we be
able to confirm the schedule.
We will keep the community informed
through the school and the Board’s web
site.
Thank