SECTION 39, “Hot Mix Asphalt” Training

Download Report

Transcript SECTION 39, “Hot Mix Asphalt” Training

1

Caltrans Changes SECTION 39

“Hot Mix Asphalt”

Presented by: Terrie Bressette Caltrans

2

What Changed?

TERMS

Hot Mix Asphalt (HMA) = Asphalt Concrete (AC) Rubberized HMA (RHMA) = Rubberized AC (RAC) Open Graded Friction Course (OGFC) = OGAC RHMA-G = RAC (Type G) RHMA-O & -O-HB = RAC (Type O) & (Type O-HB) Tack Coat = Paint Binder (Tack Coat) Geosynthetic Pavement Interlayer = Pavement Reinforcing Fabric (PRF)

3

What Changed?

Section 39 – AC vs. HMA

Old Standard Specifications

Section 39 – AC = 12,000 Words

New “Amended to Read”

Section 39 – HMA = 18,000 Words

SSPs

Section 39 AC = 21 SSPs

58,000 Words

Section 39 HMA = 12 SSPs

28,500 Words

4

What Changed?

Standard Special Provisions 12 SSPs from 30+ Old SSPs

39-AAA – HMA Type A & B

• • • • • • • • • • •

39-BBB – OGFC 39-CCC – RHMA-G 39-DDD – RHMA-O & RHMA-O-HB 39-EEE – HMA (Misc. Areas) 39-FFF – Minor HMA 39-GGG – Rumble Strips (Ground in) 39-HHH – HMA-Lime Slurry 39-III – HMA-Dry Lime 39-JJJ – HMA-Liquid Anti-Strip 39-KKK – Prime Coat 39-LLL – Replace AC Surface

5

What Changed?

Standard Special Provisions New SSPs

39-MMM – Large Stone Mix

• • •

39-NNN – High Stability Mix 39-OOO – Bonded Wearing Course (Gap-Graded) 39-PPP – Bonded Wearing Course (Rubberized)

District Requested

 Extra testing required by aggregate issues  Lime-slurry marination required

6

Section 39 – CHANGES Mix Designs

Still Hveem Method of Mix Design Dense Graded

– HMA (Type A & B)

Rubberized HMA

– RHMA-G

   

Mix Design by Producer State Verifies JMF with Plant Mix Mix design good for 12-months Flat & Elongated

Open Graded

– OGAC, RHMA-O & O-HB

  

Aggregate qualities and gradation by Producer State determines asphalt content Mix design good for 12-months

7

Section 39 – CHANGES Materials

Aggregate Qualities

     

Gradation

LA Rattler Sand equivalent

% Crushed Particles Fine Aggregate Angularity Flat & Elongated (TV ± Tolerance) (2-face – New) (New) (New)

8

Section 39 – CHANGES Materials

Mix Qualities

 Binder Content     Air voids content

Stability

HMA moisture content

(Mix & Production) Voids in Mineral Aggregate

(

Mix Design & Verification)

 

Voids Filled with Asphalt Dust Proportion (Mix Design Only) (Mix Design Only)

9

Section 39 – CHANGES Materials

• • •

CT371 Pilot

California Test (CT) 371

• 

AASHTO T283-03 In QC/QA projects for 2 years

 Estimate approx 25 projects / year •

Producer tests mix with CT371

 Chooses treatment choice (TSR  70)

Test HMA at least once during production District & Translab tests also (FIO) Data analysis – repeatability, lab / lab, mix vs. production

10

Section 39 – CHANGES Construction

Processes –

 Standard  

HMA (Type A & B) RHMA-G

OGAC & RHMA-O

 Method 

Small quantities

 QC/QA - >10,000 tons  

HMA (Type A & B) RHMA-G

11

Section 39 – CHANGES (3 Construction Processes) Standard –

Applies to the majority of HMA.

• • •

Contractor QC plan & tests at least twice daily Compaction (91 – 97% of Rice) State will test and results will be used for acceptance and pay

12

Section 39 – CHANGES (3 Construction Processes) Method –

Applies to very small quantities of HMA • •

The contractor will not perform QC Method compaction with roller and temperature requirements

State will test and results will be used for acceptance and pay.

Default for compaction when layer <0.15-ft

13

Section 39 – CHANGES (3 Construction Processes) QC/QA –

All HMA quantities greater than 10,000 tons.

QC tests for each 750 tons of HMA

State will verify gradation & % binder

 1 verification per 5 QC tests •

Statistical evaluation of gradation, % binder and compaction for pay.

 Verified contractor QC for gradation & % binder  Sate cores for compaction (92 – 96% of Rice)

14

Section 39 – CHANGES Production

Materials Production Quality Program –

 HMA & PCC (soon) 

Weights and Measures

 

Safety Limited production unit requirements

15

Section 39 – CHANGES Placement

Lift Thickness > 3 X NMAS

e.g.

¾-inch mix = 0.20-ft layer and above ½-inch mix = 0.125-ft layer

Must comply for compaction Contractor may change gradation of mix if ¾” mix and 0.15 to 0.20 layer Not required for Method

Thin blanket – Maintenance

Leveling, etc.

16

Section 39 – CHANGES

HMA must meet all specification requirements throughout production and placement.

First out of spec = Contractor Fix

Second out of spec = Stop, test, show RE before starting up

In-place & out-of-spec material

RE determines status on case-by-case

17

Thank you