Transcript Document
LV Switchboards monitoring for ALICE and LHC-B experiments 1 Equipment location. Radiation and access constraints. Monitoring goals. Available signals. Quantity. Cabling switchboards to concentrator. Possible interfaces. Monitoring system architecture. Conclusions. 4/28/2020 G. Burdet ST/EL/CO Equipment location. ALICE – UX25 – PX24 8 switchboards (23 drawers each) for electronic racks (EXD). 1 UPS Distribution switchboard (EOD) LHC-B – 2 7 switchboards (23 drawers each) for electronic racks (EXD). 2 General Services switchboards (EBD) ? 4/28/2020 G. Burdet ST/EL/CO 3 4/28/2020 G. Burdet ST/EL/CO EXD EXD PLC EXD EXD EOD Interface Equipment Monitored Switchboard 4/28/2020 G. Burdet ST/EL/CO 4 EXD PLC EXD EXD EBD EXD EBD EXD EXD PLC EXD Interface Equipment Monitored Switchboard 4/28/2020 G. Burdet ST/EL/CO 5 RS485 Jbus to URT500 ENS FIPIO to PLC in PX24 and MAGELIS in ACR TCP/IP (ModBus on TCP/IP and WEB Server BUS X PLC crate expansion MCA15 for drawers information 4/28/2020 G. Burdet ST/EL/CO 6 RS485 Jbus for DIRIS Ap SOCOMEC communication EMD4/2E EMD3/2E FIR Ir Is It FIR Ir Is It FIR Ir Is It EMT302/2X EMT406/2X SX2 SEM2 EXD1/2X EBD1/2X Is EODx/2X Ir Is It In Ih EXD1/20 23 drawers Ih Ir Is It In Ih EXD3/20 23 drawers Ih Ir Is It In Ih EXD5/20 23 drawers Ih Ir Is It In Ih EXD7/20 23 drawers Ih Is Ir Is It In Ih EXD2/20 23 drawers Ih Ir Is It In Ih EXD4/20 23 drawers Ih Ir Is It In Ih EXD6/20 I phase S 23 drawers Ih Ir Is It In Ih EXD8/20 23 drawers Ih PX24 39 drawers per level, total 156 UW25 EXD1/25 UX25 Ir Is It In Ih EXD1/29 PX24 Ir Is It In Ih EXD4/29 23 drawers Ih 23 drawers Ih Ir Is It In Ih EXD5/29 Ir Is It In Ih EXD2/29 23 drawers Ih Supervision of the LV Distribution for ALICE experiment G. Burdet April 2003 Ir Is It In Ih EXD3/29 23 drawers Ih Ir Is It In Ih EBD1/29 x drawers Ih 23 drawers Ih Ir Is It In Ih EXD6/29 23 drawers Ih Ir Is It In Ih EXD7/29 23 drawers Ih Ir Is It In Ih EBD2/29 x drawers Ih Radiation and Access Constraints ALICE – UX25 – PX24 – No radiation constraint Accessible area ALICE validate PLC in UX25 8 Radiation level consideration Inaccessibility during operation PLC closer to switchboards to reduce cabling cost Measurement modules in switchboards 4/28/2020 G. Burdet ST/EL/CO Monitoring goals Monitoring of switchboards and drawers. Remote control of drawers. States and measurements integrated to ENS. – – – 9 Synoptic. Fault on electrical trips. Alarms on measurements levels. Monitoring and Control available to Experiment SCADA. 4/28/2020 G. Burdet ST/EL/CO Available Signals Switchboards – States – Measures Bus Bars voltages (230V and 3*7.07VAC nominal) Input currents (Ir, Is, It, In: CT 1A and 7.07VAC nominal) Drawers – States – – Contactor Position (Opened and Closed) Breaker Position (Opened) after drawer modification. Local/Remote switch (LOCAL and Remote) Over current trip (SD) External Interlock (Activated) Measures Earth current tore/shunt (7.5A, 7.70VAC nominal) Controls 10 Input breaker (Opened and Closed) 48VDC auxiliary (Missing) Contactor Close, Open, Reset external interlock 4/28/2020 G. Burdet ST/EL/CO Separate Qc and Qd information Use one of the 2 pins to transmit Schema of drawer (before modification for breaker state) 4/28/2020 G. Burdet ST/EL/CO 11 Quantity ALICE – Principe of 1 drawer per rack. UX25: 7 switchboards of 23 drawers = 161 racks maximum PX24: 8 switchboards of 23 drawers = 184 racks maximum Tableaux Commun Départs ETOR Analog STOR UX25 7 2 7 PX24 23 8 2 8 23 3 8 7 1 3 8 7 1 3 3 Total – 12 Câbles ETOR STOR TOR Analog 14 21 161 1127 175 1148 16 24 184 1288 200 1312 375 2460 21 56 483 1610 161 483 1631 217 24 64 552 1840 184 552 1864 248 1035 3495 465 120 measures without earth current per drawer. 4/28/2020 G. Burdet ST/EL/CO Cabling Switchboards No Cable Length Connectors Total General Drawers MCA15 Unite Total Pulling Supply Cabling Supply 2 2 23 50 5 250 1185 775 6446 900 9306 2 2 23 50 15 750 3555 2325 6446 900 13226 2 2 23 50 30 1500 7110 4650 6446 900 19106 1 2 23 25 50 1250 5925 3875 3223 450 13473 2 2 23 50 30 1500 7110 4650 6446 900 19106 2 2 23 50 10 500 2370 1550 6446 900 11266 2 2 23 50 30 1500 7110 4650 6446 900 19106 2 2 23 50 20 1000 4740 3100 6446 900 15186 US25 PX24 119778CHF 8250m Groupement d’affaire 13 Pulling / Cabling 32668 € 4/28/2020 Supply 36794 CHF Total 88409 CHF 74% G. Burdet ST/EL/CO Considered Interfaces CIT8.4, CIT8.4A, CIT1.32P HAZEMEYER PLC PREMIUM and distributed I/O’s on FIPIO PLC SIEMENS – – – 14 S7-300 centralised S7-300 distributed S7-400 PLC PREMIUM and CIT 8.4A HAZEMEYER PLC PREMIUM and DIRIS Ap SOCOMEC 4/28/2020 G. Burdet ST/EL/CO CIT HAZEMEYER (1) << 15 switchboards >> << 23 drawers >> 15 4/28/2020 G. Burdet ST/EL/CO CIT HAZEMEYER (2) Modularity et compatibility with analogue signals. – – – 15 sets (7+8 switchboards). – 16 15 CIT8.4A, 345 CIT8.4, 15 CIT1.32P 1 x PLC PREMIUM SCHNEIDER + MAGELIS – 1 x CIT 8.4A per switchboard (measures et states). 1 x CIT 8.4 per drawer (states and controls). 1 x CIT1.32P as switchboard concentrator. Interface Cost: 63609€ (plus crates, cables, cabling, program). CIT Quantity and HAZEMEYER contract. 4/28/2020 G. Burdet ST/EL/CO PLC PREMIUM and distributed FIPIO TBX 16 inputs TBX 16 outputs TBX Analogues + converters Total equipments – – – PLC TBX Measurement Converter 17 67500 € 48500 € without measure 4/28/2020 G. Burdet ST/EL/CO PLC SIEMENS 32 bits inputs boards 16 bits outputs boards, common by 4 Prices for digital I/O (no measures). S7-400 Centralisé Station S7-400 I_O Tête entrées 3213 77516 Decentralisé Station Tête 2827 Station Entrées 34217 Station Tête 2252 Station entrées 34217 S7-300 Pupitre operateur TP 270 10" 18 PT catalogue en Euros Rabais Prix CERN Change Prix CERN EUROS 0.748 EUROS 1.500 FS 80729 60385 90577 Station Sorties 42420 79464 PT catalogue en Euros Station sorties EUROS 42420 78889 6 AV6 545-0CC10-0AX0 4/28/2020 2525 59439 89159 59009 88513 1889 2833 G. Burdet ST/EL/CO PLC PREMIUM + CIT HAZEMEYER (1) PLC PREMIUM SCHNEIDER – – 64 bits input boards (24VDC polarisation) 64 bits output boards with external TeleFast relays CIT8.4A (spare) versus CIT8MX (contract) – 1 module per switchboard 19 Voltage Ur, Us, Ut Currents Ir, Is, It, In Active Power Pr, Ps, Pt included CIT1.32P as concentrator 4/28/2020 G. Burdet ST/EL/CO PLC PREMIUM + CIT HAZEMEYER (2) PREMIUM limited to 2048 TOR – – – Two sets UX25 and PX24. Modular crates, 64 drawers each. Special crates for CIT and UC HH EUROS CHF EUROS CHF 58876 88314 Total PLC 58876 88314 6750 10125 CIT (CIT 8MX) 16050 24075 Matériel 79626 119439 Matériel 88926 133389 Program. 7000 10500 Program. 7000 10500 Câbles 54803 82205 Câbles 54803 82205 ALICE 141429 212144 ALICE 150729 226094 Total PLC CIT (CIT8.4A) 20 4/28/2020 G. Burdet ST/EL/CO PLC PREMIUM + DIRIS Ap SOCOMEC (1) PLC PREMIUM SCHNEIDER – – 1 x DIRIS Ap SOCOMEC per switchboard – – – – – – – 21 64 bits input boards (24VDC polarisation) 64 bits output boards with external TeleFast relays Voltage Ur, Us, Ut Currents Ir, Is, It, In, maximum current Active & reactive Power, maximum power On/Off incomer interface Saves 2 MCA15 cables par switchboard Local display Best placed in switchboards 4/28/2020 G. Burdet ST/EL/CO PLC PREMIUM + DIRIS Ap SOCOMEC (2) PREMIUM limited to 2048 TOR – – – Two PLC sets UX25 and PX24. Modular crates, 64 drawers max each. Measures by DIRIS Ap in switchboards 22 Reduce cable 25 to 23 per switchboard Full measurement Local display EUROS CHF Total PLC 58876 88314 Total DIRIS 17040 25561 Matériel 83916 125875 Program. 7000 10500 Câbles 50419 75629 ALICE 141336 212003 4/28/2020 G. Burdet ST/EL/CO TCR CAS TDS ENS SES2 Local SCADA URT500 & FE SX2 PX24 PLC PLC Tableaux BT PX24 UX25 CIT1.32P Tableaux BT UX25 CIT8.4A 4/28/2020 G. Burdet ST/EL/CO 23 TCR CAS TDS ENS SES2 Local SCADA URT500 & FE SX2 PX24 PLC PLC UX25 Tableaux BT PX24 4/28/2020 Tableaux BT UX25 G. Burdet ST/EL/CO 24 PREMIUM PLC’s and DIRIS Ap SOCOMEC ALICE Experiment Switchboards Monitoring and Control FIPIO inter-PLC and to MAGELIS UX25 PX24 TCP/IP ModBus on TCP/IP WEB Server Jbus on RS485 URT500 ENS 46 drawers in 2 switchboards BUS X Jbus RS485 BUS X 69 drawers in 3 switchboards Jbus RS485 46 drawers in 2 switchboards BUS X BUS X <100m 46 drawers in 2 switchboards BUS X BUS X 46 drawers in 2 switchboards 92 drawers in 4 switchboards 4/28/2020 G. Burdet ST/EL/CO 25 Conclusions Switchboards impose cable/connector type Distributed architecture to reduce cabling costs Best compromise is SCHNEIDER PREMIUM PLC for digital I/O with SOCOMEC DIRIS Ap for measures Cabling and system cost related to relation rack/drawer – 26 Change relation => reduce cost. 4/28/2020 G. Burdet ST/EL/CO