Transcript Slide 1
SR 25 – Hoosier Heartland Highway Lafayette to Logansport 97th Annual Purdue Road School March 8, 2011 / Stewart Center / Purdue University INDOT Project Management – Jim Earl, P.E. Agenda • Corridor Overview • Overall Project Status • Contract Letting Schedule • Construction Change: Roundabout • Current Construction Schedule SR 25 – Hoosier Heartland Highway Four Segments: 1 West Segment 2 Central Segment 3 East Segment 4 Logansport Segment Construction Schedule: Began in Fall 2008 Complete by End of 2013 Lafayette to Logansport Overall Project Status • • • • • Environmental Document complete Design Development on schedule Permitting Process on schedule Utility/Railroad Coordination ongoing Land Acquisition ongoing o Over 300 parcels o Critical Path – drives schedule o Complete by Fall 2011 (depending on condemnations) Overall Project Status • • • • • Most contracts funded from Major Moves Some contracts include federal funds One contract stimulus funded (ARRA) Total Estimated Cost approximately $450M All contracts to letting by Summer 2012 Contract Letting Schedule • Corridor has 24 total contracts o 13 Road Contracts o 8 Bridge Contracts o 3 Environmental Mitigation Contracts • 14 contracts have been let o o o o o o 8 more contracts letting in calendar year 2011 2 contracts letting in calendar year 2012 7 Road Contracts 3 Bridge Contracts Next contract letting 5/11/2011 Last contract letting 7/11/2012 IR-30845 Segment 2A Letting: 5/11/2011 Delphi IR-30850 Segment 3B Letting: 5/11/2011 Burrows IB-30854 Segment 4B Letting: 8/10/2011 Logansport IB-30855 Segment 4A Letting: 10/13/2011 Logansport IR-30847 Segment 2B Letting: 10/13/2011 Delphi IB-33804 Segment 3B Letting: 11/16/2011 Burrows IR-30846 Segment 2D Letting: 11/16/2011 IR-30848 Segment 2C Letting: 12/14/2011 Delphi IR-30853 Segment 4A Letting: 03/07/2012 Logansport IR-30852 Segment 4B Letting: 07/11/2012 Logansport Construction Change: Roundabout • Location – just east of I-65 Interchange • Original Plan (Traditional T-Intersection) o o o o Impacts on unsuitable soils Restrictions on commercial access Concerns for safety and convenience Absence of transition from rural to urban setting • Revised Plan (Roundabout) o o o o Avoids unsuitable soils Loosens restrictions on commercial access Increases safety and convenience Provides transition from rural to urban setting Construction Change: Roundabout Original Plan (Traditional T-Intersection) Construction Change: Roundabout Revised Plan (Roundabout) Construction Change: Roundabout • Minimal additional impact to right-of-way o Public Information Meeting held on 11/8/2010 o AI Approval received from FHWA on 3/2/2011 • Revisions to construction plans o o o o Design review completed on 2/21/2011 Utility coordination complete by 3/31/2011 Adjustment to traffic maintenance plan Attempting to complete changes by April 2011 • No impact to construction schedule Current Construction Schedule • 14 of the 24 contracts have been let o 5 contracts are complete (4 are open to traffic) o 9 contracts are under construction o 10 remaining contracts to letting by Summer 2012 • Highway from I-65 to US421 open to traffic by December 2012 • Highway from Lafayette to Logansport open to traffic by December 2013 Current Construction Schedule 2008 SR25 HHH 1/1/2011 1st 2nd 3rd 2009 4th 1st 2nd 3rd IB-30839 IB-30841 IB-30842 1st IR-30844 3rd 2011 4th 1st 2nd 3rd 2012 4th 1st 2nd 3rd 2013 4th 1st 2nd 3rd Bridge - CR625E over NSRR and SR25 Bridge - CR900E over NSRR and SR25 Bridge - CR1000E over SR25 Phase 1A - from I65 to 0.1 m. E of CR750E Phase 1B - from 0.1m. E of CR750E to 0.1m. W of NSRR Phase 1C - from 0.1m W of NSRR to 0.42m E of CL Phase 2A - from 0.42 m. E of CL to 0.15 m. E of US421 IR-30845 IR-30847 Phase 2B - from 0.15 m. E of US421 to 0.6 m. S of Main St. IR-30848 Phase 2C - from 0.6 m. S of Main Street to 0.21 m. E of SR218 Phase 2D - from 0.21 m. E of SR218 to 0.48 m. E of CR400W IR-30846 Bridge - CR50W over NSRR and SR25 IB-33804 Phase 3A - from 0.48 m. E of CR400W to 0.11 m. E of CR100W IR-30849 Phase 3B - from 0.11 m. E of CR100W to 0.16 m. E of CR500S IR-30850 IR-30851 IR-32543 IB-30855 IB-30854 IR-30853 IR-30852 4th Bridge - CR500E over NSRR and SR25 IR-30840 SIR-30843 2nd Bridge - CR300N over NSRR and SR25 IB-30837 IB-30838 2010 4th Phase 3C - from 0.16 m. E of CR500S to 0.61 m. E of CR325W Grading and Bridges for Phase 3C Bridge - SR25 over Old SR25 and NSRR Bridge - SR25 over Kokomo Pike Phase 4A - 0.61m E of CR325W to 0.21m E of CR115W Phase 4B - 0.21 m. E of CR115W to US24/US35 Thank you! http://www.in.gov/indot/div/projects/sr25study/ 97th Annual Purdue Road School March 8, 2011 / Stewart Center / Purdue University