HOOSIER HEARTLAND
HIGHWAY
Public Information Meeting – August 27, 2009
STATE ROAD 25, SEGMENT 2
From 0.42 mile east of Tippecanoe/Carroll County line
to 0.20 mile east of CR400W
Length of 8.46 miles with 9 Bridges
INDOT DESIGN CONSULTANT:
Bernardin Lochmueller & Associates, Inc.
Jeff Whitaker, P.E.
Section 2: Central Segment

Current Design Status


Road & Bridge Design - 50% Complete
R/W Engineering – 50% Complete
Section 2: Central Segment

Work Schedule





Hydraulic Review & Grade Review
(Completed 2007)
Context Sensitive Solution Design
(Completed August 28, 2008)
Preliminary Field Check of Road & Bridge
(February 23, 2009)
Public Information Meeting
(August 27, 2009)
Design Approval (September 2009)
Section 2: Central Segment

Right-of-Way Schedule





R/W Engineering & Acquisition (20082011)
90 Parcels of Property
26 Relocation
R/W Appraising
(Oct/Nov 2009-April 2010)
Property Information
Section 2: Central Segment

Construction Schedule




Phase
Phase
Phase
Phase
2A - (November 2010- 2012)
2B – (March 2011-2013)
2C – (December 2011-2013)
2D – (October 2011-2013)
Section 2: Central Segment

Alignment Issues:




Robinson Branch Bridge Added:


Alignment was shifted on SR 25 and Connector Roads to
avoid Environmental Sensitive Areas
Alignment shifted on SR 218 because of an at-grade
Railroad Crossing
Alignment shifted on Connector Road between the New
SR 218 and Existing SR 218
Because of Environmental Stream Impacts & Wetland
Seeps
Upstream Bridge Creek Bridge Added:

Because of hydraulics & cost savings
Section 2: Central Segment
Main Street Access



Local Officials Requested – Main Street Access
Revised
Improve Entrance into Delphi
Signature Bridge for the Monon Trail
Section 2: Central Segment
Context Sensitive Solutions - Deer Creek
Valley Rural Historic District



Committee Stakeholders
Total of 4 Meetings, Last Meeting August 28, 2008
Context Sensitive Design Solutions
 Texturing & Coloring of the Retaining Walls & Bridge
Piers
 Shape of Bridge Piers
 Type of Bridge Railing
 Type of Landscaping
 Type of Lighting at Main Street
HOOSIER HEARTLAND
HIGHWAY