HMI Mission PDR

Download Report

Transcript HMI Mission PDR

Acronym List
AIA
AS
ABPL
ABML
AD
Atmospheric Imaging Assembly
AMBI/Summit driver
As-Built Parts List
As-Built Materials List
Analog Data
CIL
CM
CM
CPT
CVCM
Critical Items List
Command System
Configuration Management
Comprehensive Performance Test
Collectable Volatile Condensable Materials
AMBI
ANSI
ASIC
ASQ
ASTM
BB
ASCM Module Bus Interface
American National Standards Institute
Application Specific Integrated Circuits
American Society for Quality
American Society for Testing and Materials
Ball Bearing
DB
DC
DDS
DS
DoD
DPA
Command and telemetry database
Decompression object
BDS
BG
BGA
BOL
CA
Beam Distribution System
Background
Ball Grid Array
Beginning of Life
Camera Control
DT
EDU
EEE
EIT
ELV
Descriptor table
Engineering Development Unit
Electrical, Electronic, and Electromechanical
Data Structures
Department of Defense
Destructive Physical Analysis
Expendable Launch Vehicle
CA
Corrective Action
CAGE Commercial and Government Entity Code
CCB
Configuration Control Board
EMC
Electromagnetic Compatibility
EMI
Electromagnetic Interference
EPIC/Triana
CCD
CEB
CDR
EOL
ESD
ETU
Camera Electronics Box
Critical Design Review
CDRL
Critical Design Review – 16-17 Nov 2004
FD
Electrostatic Discharge
Engineering Test Unit
Front Door
HMI00905 – Page 1
Acronym List
FEM
FPA
FPGA
FPP
Focal Plane Package
FM
Fault Management
HEB HMI Electronics Box
HOP HMI Optics Package
HMI Helioseismic and Magnetic Imager
HR
Compressor control (on High-Rate Interface
board)
FMEA
FRB
FS
FTA
FRR
FSR
ICD Interface Control Document
IPD Instrument Performance Document
ISS
Image Stabilization System
ISO
International Standards Organization
I&T
Integration and Test
IV&V Independent Verification and Validation
Failure Mode and Effects Analysis
Failure Review Board
File System
Fault Tree Analysis
Flight Readiness Review
Free spectral range
GT
Guide Telescope
GEVS General Environmental Verification Specification
GEVS-SE
General Environmental Verification
Specification for STS & ELV Payloads,
Subsystems, and Components
GFE
Government Furnished Equipment
JSOC Joint Science Operations Center
KL
Kernel
LD
Loader
LMSAL Lockheed Martin Solar & Astrophysics Laboratory
LRR
Launch Readiness Review
LWS
Living With a Star
GIDEP Government Industry Data Exchange Program
GSE
Ground Support Equipment
MA
MAR
GSFC Goddard Space Flight Center
HAO
HC
Hollow Core motor
HCM Hollow Core Motor
MAT Mission Allowable Temperatures
MC
Mechanism Control
MCP
Multi-Chip Module
Critical Design Review – 16-17 Nov 2004
Mission Assurance
Mission Assurance Requirements
HMI00905 – Page 2
Acronym List
MG
Messaging System
MHD
MOC
MOR Mission Operations Review
MPCB Materials & Processes Control Board
PIL
PIND
PM
PPL
PRA
MRD Mission Requirement Document
MRB
Material Review Board
MRR Mission Readiness Review
MUA
Materials Usage Agreement
NAS
NASA Assurance Standard
NASA National Aeronautics and Space Administration
PSR
Pre-Shipment Review
PW
Power Control
PWA Printed Wiring Assembly
PWB Printed Wiring Board
QCM Government Furnished Equipment
QE
Quality Engineer or Quality Engineering
NHB
NASA Handbook
OC
On-board Clock (OBC object)
OH
Operational Heaters
OSSMA Office of Systems Safety and Mission Assurance
OV
Oven
QMS
SAM
SC
SCC
SCM
PA
PAPL
Product Assurance or Performance Assurance
PAIPProduct Assurance Implementation Plan
Project Approved Parts List
SECCHI
SDO Solar Dynamics Observatory
SH
Shutter
PC
PCB
PDR
PER
Processed command derived classes
Parts Control Board
Preliminary Design Review
Pre-Environmental Review
SI
1553 Spacecraft Interface
SM Structural Model
SM/ETU
Critical Design Review – 16-17 Nov 2004
SMA
Parts Identification List
Particle Impact Noise Detection
Program Manager
Preferred Parts List
Probabilistic Risk Assessment
Quality Management System
Systems Assurance Manager
Spacecraft
Stress Corrosion Cracking
Software Configuration Management
Safety and Mission Assurance
HMI00905 – Page 3
Acronym List
SOCs
SOHO/MDI
SOW Statement of Work
SQ
Sequencer
SQE
Software Quality Engineer
V&V
Verification and Validation
XRT
SQMS Software Quality Management System
SUROM Start-Up Read-Only Memory
SR
SUROM (Start-Up Read-Only Memory)
SRO
Systems Review Office
SRR
Software Requirements Review
SS
Script System
SSP
System Safety Plan
SUROM Start-Up Read-Only Memory
SXI
Solar X-ray Imager
SXT
TD
Telemetry Diagnostic buffer
TI
TM
TML
Timing
Telemetry
Total Mass Loss
TR
Torque Ratio
TRACE
TRR
Test Readiness Review
Critical Design Review – 16-17 Nov 2004
HMI00905 – Page 4