Agenda, Day 1
Start
Topic
Presenter
Duration
08:30
Getting Settled
Coffee and Treats
00:30
09:00
Welcome & Agenda
Fischer
00:10
09:10
CDR Introduction
Cygnarowicz
00:05
09:15
Science Investigation Overview
Scherrer
00:30
09:45
Instrument Development Overview
Fischer
00:30
10:15
System Engineering
Miles
00:30
10:45
Break
11:00
Reliability
Wolf
00:20
11:20
Optical System
Rairden
00:30
11:50
Filter System
Shine
00:25
12:15
Lunch
13:00
Michelson Interferometers and Beamsplitters
Bush
00:25
13:25
Polarization, Radiometry, and Calibration
Schou
00:20
13:45
Mechanical System
Gradwohl
00:45
14:30
Structural Analysis
Katz
00:20
14:50
Filter Oven System
Dusenbury
00:25
15:15
Break
15:30
HOP Thermal System
Navarro
00:40
16:10
Mechanisms
Akin
01:00
17:10
Image Stabilization System
Edwards
00:20
17:30
Adjourn Day 1
Critical Design Review – 16-17 Nov 2004
00:15
00:45
00:15
HMI00905 – Page 1
Agenda, Day 2
Start
Topic
Presenter
Duration
08:30
Getting Settled
Coffee and Treats
00:30
09:00
Focal Plane System Overview
Thomas
00:20
09:20
CCD (e2v)
Wilson
00:40
10:00
CEB (RAL)
Waltham
00:40
10:40
Break
10:55
Electronics
12:15
Lunch
13:00
EEE Parts
Yamamoto
00:15
13:15
HEB Thermal
Navarro
00:20
13:35
Flight Software
Drake
01:15
14:50
Break
15:05
Integration and Test
Moskal
00:45
15:50
Launch and On-orbit Calibration
Bush
00:20
16:10
Mission Assurance
McFeaters
00:20
16:30
Review Team Caucus
00:30
17:00
Debrief
00:15
17:15
Adjourn Day 2
Critical Design Review – 16-17 Nov 2004
00:15
Lindgren
01:20
00:45
00:15
HMI00905 – Page 2
Welcome and Agenda
Barbara Fischer
HMI Deputy Program Manager
LMSSC*ATC*LMSAL
[email protected]
650-424-2838
Critical Design Review – 16-17 Nov 2004
HMI00905 – Page 3
Welcome
...the common eye sees only the outside of things, and judges by that, but the
seeing eye pierces through and reads the heart and the soul, finding there
capacities which the outside didn't indicate or promise, and which the other
kind couldn't detect.
Mark Twain
Welcome and thank you for being our seeing eye…..on with the review
Critical Design Review – 16-17 Nov 2004
HMI00905 – Page 4
The HMI Team
Alan Title
HMI Principal Investigator
HMI-CoI, LMSAL Lead/AIA PI
Rock Bush
Larry Springer
HMI-Stanford Prg. Mgr.
HMI-AIA Prg. Mgr.
Romeo Durscher
Financial/Admin
Sasha Kosovichev
LMSAL
Phil Scherrer
Barbara Fischer
HMI Science Lead
HMI Deputy Prg.Mgr.
Jesper Schou
HMI Instrument Scientist
Phil Scherrer
Yang Liu
Acting JSOC Data Lead
Magnetic Field Science
Margie Stehle
Admin Support
Carl Cimilucca
Jim Aloise
Keh-Cheng Chu
Rasmus Larsen
Rick Bogart
JSOC System Engineer
JSOC Software
JSOC Hardware
Processing & Analysis
Data Export
Jeneen Sommers
TBD
TBD
Karen Tian
Database & GUI
System Support
Sci Programmer
VSO Access
Hao Thai
Data Operations
Critical Design Review – 16-17 Nov 2004
HMI00905 – Page 5
The HMI Team - LMSAL
Alan Title
HMI-LMSAL Lead/AIA PI
Frank Friedlaender
Resource Manager
Bob Honeycutt
Susan Piazza
Margaret Morgan
Linda Gates
Shayne Mathews
Larry Springer
HMI/AIA Program Manager
Ed McFeaters
Mission Assurance
Technical Advisors
Jake Wolfson
Ted Tarbell
Ramona Jimenez
Program Office Assistant
Ruth Mix
Configuration Management
Francis Lee
Chuck Fischer
Karen Kao
Dale Wolfe
Zaki Kudiya
Ross Yamamoto
Pete Kacensky
Barbara Fischer
HMI Deputy PM
Common w/ AIA
John Miles
System Engineer/ CPE
Rose Navarro
Thermal Lead
Carin Lundquist
Dave Akin
Mechanism Lead
Tom Nichols
Dave Kirkpatrick
Integration and Test
Ryan Moskal
Critical Design Review – 16-17 Nov 2004
Rick Rairden
Optics Lead
Darrel Torgerson
Dick Shine
Filter Lead
Glenn Gradwohl
Mechanical Lead
Don Ausmus
Lizzie Barnett
Klaas Bol
John Fischer
Ernest Herrera
Noah Katz
Tom Nichols
Jack Palouci
John Vieira
Brad Watson
John Wang
Russ Lindgren
Electronics Lead
Bob Caravalho
Jay Dusenbury
Viet Duong
Chris Edwards
Cliff Evans
Bruce Imai
Jerry Janeka
Dwana McClurg
Sokong Sour
Bill Taylor
Edgar Thomas
Kent Zickur
Jerry Drake
Software Lead
Ron Baraze
Roger Chevalier
Gary Heyman
Dnyanesh Mathur
Roger Rehse
JP Riley
Ralph Seguin
Dexter Duncan
CCD Lead
Lawrence Shing
Louis Tavarez
HMI00905 – Page 6
Executive Summary
•
•
Completed all peer reviews
–
Internal independent reviewers
–
Project reviewers
Structural model structure received and started assembly
–
Environmental testing scheduled for Dec
•
Front window testing complete
•
HCM life test began
•
Shutter life test is near completion
•
HEB design, specifications and drawings are complete
•
HEB brass boards and enclosure are in fabrication
•
SUROM acceptance test is complete
•
Space-wire Bread board in fabrication
•
All required CDRL items are supplied (copies available in lobby for your review)
•
ICD initial release complete
•
Drawing Status: 86% Complete
HOP Fabrication Drawings
278
Of
334
83%
HEB Fabrication Drawings
64
Of
80
80%
SM/ETU Model Drawings
173
Of
179
97%
Total
515
Of
593
86%