HMI Peer Review - Stanford University

Download Report

Transcript HMI Peer Review - Stanford University

SDO/HMI Preliminary Design Review
Solar Dynamics Observatory
Helioseismic and Magnetic Imager
Preliminary Design Review
Stanford University and Lockheed Martin Solar and Astrophysics Laboratory
18-19 November 2003
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 1
HMI00384
HMI PDR Logistics and Agenda Review
Larry Springer
HMI Program Manager
[email protected]
650-354-5793
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 2
Agenda Day 1
Time
8:30
9:00
9:10
9:15
9:35
9:45
10:05
10:25
10:45
11:15
12:15
1:15
2:25
3:05
4:15
Topic
Coffee & Continental Breakfast
Welcome & Logistics & Agenda Review
Introduction
Investigation Overview
Requirements
Instrument Overview
Instrument Performance Requirements
S/C Accommodation & Resources
Optics
Filter Systems
Front Window, Blocking Filter and Lyot
Michelson Inteferometers
Lunch
Mechanical (OP structure, telescope, FPA)
Thermal Design
Overall and Front Window
Precision Oven
Mechanisms
Wrap-up and plan for tomorrow
HMI Preliminary Design Review – Nov. 18 &19, 2003
Presenter
Larry Springer
Tom Cygnarowicz
Philip Scherrer
Rock Bush
Larry Springer
Jesper Schou
Brock Carpenter
Alan Title
Duration
30 min
10 min
5 min
20 min
10 min
20 min
20 min
20 min
30 min
60 min
Richard Shine
Rock Bush
Barbara Fischer
70 min
40 min
Rose Navarro
Carl Yanari
David Akin
70 min
Introduction and agenda Page 3
Agenda Day 2
9:00 CCD Camera Systems Overview
CCD Sensors
CEB (Camera Electronics Box)
10:20 Electronics
11:35 Image Stabilization System
12:05 Lunch
1:05 Flight Software
1:45 Integration & Test (w/GSE/Verification)
2:30 Calibration
2:45 Mission Assurance
Quality Assurance and Inspection
Software Quality Assurance
Materials and Processes
Safety
EEE Parts
3:25 Reliability
3:35 Contamination Control
3:45 Ground System
4:05 Mission Operations
4:15 Review Team Caucus
4:30 Debrief and Wrap-up
HMI Preliminary Design Review – Nov. 18 &19, 2003
Jake Wolfson
Gein Tsang
Nick Waltham
Russ Lindgren
Chris Edwards
Jerry Drake
Michael Levay
Jesper Schou
Ed McFeaters
Dale Wolfe
Syndie Meyer
Jim Aloise
Rock Bush
10 min
30 min
40 min
75 min
30 min
40 min
45 min
15 min
60 min
10 min
10 min
20 min
10 min
15 min
10 min
Introduction and agenda Page 4
Acronym List (1/4)
ABPL
As-Built Parts List
ABML
ANSI
As-Built Materials List
American National Standards Institute
ASIC
Application Specific Integrated Circuits
ASQ
American Society for Quality
ASTM
American Society for Testing and Materials
BB
BGA
BOL
CA
Ball Bearing
Ball Grid Array
Beginning of Life
Corrective Action
CAGE
Commercial and Government Entity Code
CCB
Configuration Control Board
CCP
Contamination Control Plan
CDR
Critical Design Review
CIL
Critical Items List
CM
CPT
Configuration Management
Comprehensive Performance Test
CVCM
Collectable Volatile Condensable Materials
DoD
Department of Defense
DPA
Destructive Physical Analysis
EDU
Engineering Development Unit
EEE
Electrical, Electronic, and Electromechanical
ELV
Expendable Launch Vehicle
EMC
Electromagnetic Compatibility
EMI
Electromagnetic Interference
ESD
Electrostatic Discharge
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 5
Acronym List (2/4)
FMEA
Failure Modes and Effects Analysis
FOR
Flight Operations Review
FRB
Failure Review Board
FTA
Fault Tree Analysis
FRR
Flight Readiness Review
GEVS
General Environmental Verification Specification
GEVS-SE
General Environmental Verification Specification for STS & ELV Payloads, Subsystems, and
Components
GFE
Government Furnished Equipment
GIDEP
Government Industry Data Exchange Program
GSE
Ground Support Equipment
GSFC
Goddard Space Flight Center
I&T
Integration and Test
ISO
International Standards Organization
IV&V
Independent Verification and Validation
LRR
Launch Readiness Review
LWS
Living With a Star
MA
MAR
Mission Assurance
Mission Assurance Requirements
MCP
Multi-Chip Module
MOR
Mission Operations Review
MPCB
Materials & Processes Control Board
MRB
Material Review Board
MRR
Mission Readiness Review
MUA
Materials Usage Agreement
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 6
Acronym List (3/4)
NAS
NASA Assurance Standard
NASA
National Aeronautics and Space Administration
NHB
NASA Handbook
OSSMA
Office of Systems Safety and Mission Assurance
PA
Product Assurance or Performance Assurance
PAIP
Performance Assurance Implementation Plan
PAPL
Project Approved Parts List
PCB
Parts Control Board
PDR
Preliminary Design Review
PER
Pre-Environmental Review
PIL
Parts Identification List
PIND
Particle Impact Noise Detection
PM
Program Manger
PPL
Preferred Parts List
PRA
Probabilistic Risk Assessment
PSR
Pre-Shipment Review
PWB
Printed Wiring Board
QCM
Quartz Crystal Microbalance
QE
QMS
Quality Engineer or Quality Engineering
Quality Management System
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 7
Acronym List (4/4)
SAM
SCC
Systems Assurance Manager
Stress Corrosion Cracking
SCM
Software Configuration Management
SOW
Statement of Work
SQE
Software Quality Engineer
SQMS
Software Quality Management System
SMA
Safety and Mission Assurance
SRO
Systems Review Office
SRR
Software Requirements Review
SSP
System Safety Plan
TML
Total Mass Loss
TRR
Test Readiness Review
V&V
Verification and Validation
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 8
ITAR Considerations
•
The HMI PDR Package has been reviewed with the LMATC Export Control
Director to determine that it is not an ITAR controlled document.
•
It is the opinion of the LMATC Export Control Director that ITAR and the
provisos of the HMI TAA prevent us from exporting information about other
programs that are regulated by ITAR
•
Therefore the names and acronyms from previous programs covered by ITAR
have been replaced by generic references (ie. Program A)
•
THE Review Panel will be provided with a cross reference.
•
Programs like MDI and TRACE which were developed prior to ITAR are not
restricted.
•
Because the audience of this review includes non US persons, who are
members of the HMI team, it may be necessary to defer the answers to detailed
technical questions that would include information considered technical data or
defense service by ITAR.
HMI Preliminary Design Review – Nov. 18 &19, 2003
Introduction and agenda Page 9