1. S3 Raj MGNREGA & NBA Churu

Download Report

Transcript 1. S3 Raj MGNREGA & NBA Churu

Model Estimate for IHHL
The estimated cost of IHHL is about Rs.
14500/- comprising unskilled labour
component–3000/-,
Skilled
labour
component 2500/- and material component
5500/-, which can be meet out as under:
• Through NBA incentive – 4600/• Through MGNREGA – 4500/• Beneficiary Share – 5400/-
Provision through MGNREGA
Under MGNREGA Unskilled labour
(up to 20 person days) and skilled labour
(up to 4 person days under material
component) on construction of Individual
Household Latrine is permitted subject to
total expr. up to Rs 4500/-.
.
Provision through NBA
Under NBA an allowable incentive money
of Rs. 4600/-, is being paid to beneficiary
in two installments i.e. I installment of Rs.
3000/- as an advance for purchasing of
material and remaining II installment of Rs.
1600/- after completion of IHHL and its
valuation.
Steps taken by State for simplification of
convergence for IHHL
1. Issuing TS as per model estimate :• TS are being issued on the basis of model
estimate to save time for issuing Financial
Sanction.
2. Simplified Performa for UC/CC and valuation
•A simplified Performa for valuation and issue
of UC/CC has been developed for reducing
lengthy paper work early payment.
3. Incentive to Field Functionaries :Incentive amount is being paid to Field
Functionaries as a motivator after declaration
of GP as ODF -
•Gram Rozgar Sahayak - Rs. 50/- Per IHHL
•Technical Assistant - Rs. 25/- Per IHHL
•Block Coordinator - Rs. 2000/- for GP of 300
families.
- Rs. 3000/- for GP > 300
families.
4. Provision of mate for better implementation
• Govt has decide to engage a mate on a cluster of 20-25
households for construction of IHHL.
• The so deployed mate will obtain form no. 6, will
receive MR’s from block and will deposit filled MR’s
back to PS after completion of cluster works.
• The mate will be responsible for taking attendance of
wage seekers, for valuation of toilet constructed and to
issue UC/ CC.
• The mate will be allowed maximum 20 days presence
from either from administrative head of MGNREGA or
from MGNREGA material component of Rs. 4500/• The mate will be provided an incentive of Rs. 50/- per
IHHL from NBA.
5. Sanctions of IHHL alongwith IAY/CMBPL :-
In Rajasthan, about 10 lacs Rural houses of
BPL families are being constructed in
IAY/CMBPL Aawas yojana and efforts are
being made to sanction toilets in each house
through convergence of NBA and
MGNREGS.
6. Feeding of sanctions and MR’s in MIS:•Keeping in view huge pendency in feeding
of sanctions and muster rolls in MIS, the
feeding is permitted through out sourcing.
•an incentive money is being granted to the
MIS manager/Data entry operators.
Progress of IHHL works under MGNREGA
through convergence with NBA
• Total works sanctioned under NBA – 9.31 Lacs
(including 4.30 lacs of CM BPL & IAY).
• Convergence with NREGA – 6.20 Lacs
(including 2.85 lacs of CM BPL & IAY).
• 93000 MR's (15%) have been issued against 6.20
lacs toilets.
• 1.47 lacs (16%) Toilets have been completed
against 9.31 lacs toilets.
Achievement
• In the year 2011-12, 321 GP's had been declared as
Nirmal Gram Panchyat (NGP) by Ministry of Driking
Water and Sanitation (MoDWS).
• In the year 2012-13, about 300 GP'S were made ODF,
GoI is conducting survey to declared these GPS as
NGP‘s. Likely ODF GPs - Bikaner (55GP) Churu ( 55
GP), Jhunjhunu (34 GP), Nagaur
(30 GP) Jodhpur
(28 GP), Hanumangarh (21 GP) Jaisalmer (21 GP),
Ganganagar (14 GP) and Karauli (14 GP).
• In Churu district, Taranager block has become the first
ODF block of the State and verification process is going
for declaring other block Sardarshar as ODF block.
Problems
• The feeding of sanctions and muster rolls in
MIS is very time consuming, so reflected
entered progress in MIS is not up to the
mark.
• A large no. of muster rolls are depositing
back due to non deployment of wage
seekers.
• 15 to 20 persondays may be added in the job card
of beneficiary after completion of toilet.
• Material cost (as a part of permissible assistance
of Rs 4500/ from EGS) may be transferred into the
account of beneficiary towards cost of Skilled
labour and material.
Or
• There should be relaxation in depositing the
muster rolls of IHHL works and it should be
allowed for depositing after completion so as to
save time and energy for frequent issuing of the
same.