ERTMS Generic Presentation
Download
Report
Transcript ERTMS Generic Presentation
Oct. 2004
Experience
in ERTMS level 2
Pardubice, Czech Republic - 25 Oct 2004
Dr G. de Tilière
ALSTOM Solutions & Products
Projects: Example of Switzerland
(SBB-SA NBS) and Italy (IHSL)
ALSTOM Return of experience
Conclusion
2
ATLAS™ 200 solution
ERTMS Level 2
Control
Centre
ATS
track-side signals no longer required
Movement authority by radio: Euroradio
/ GSM-R, ...
Train position via Eurobalise
Train Integrity via RBC “Radio-Based
Centre”
GSM-R
local radio equipment
RBC
Radio Block Centre
Local
IXL
Signal
ERTMS on-board
+ cab-signaling
Train detection
Local
IXL
Point
Machine
Fixed Beacon
relocalisation
3
ERTMS Product Experience
On-board equipment:
ALSTOM’s EVC platform>1000 in service
(Belgium, Hong-Kong, Netherlands, UK)
>2300 EVC to be delivered
(including 194 computers for TASS, « Tilt Autorisation
and Supervision System », for UK)
ALSTOM ’s ETCS MMI (>200 in service)
> 4000 to be delivered
•
ALSTOM ’s ETCS antenna
similar to that of KVB, the ATC for SNCF (> 7000 in service)
> 2500 to be delivered
Odometers
> 2500 to be delivered
4
4
ETCS Doppler radar has been
tested on all Alstom Test Tracks
> 2000 to be delivered
Juridical Recorder Unit
> 2000 to be delivered
Cabradio datarack & MMI > 1000 sets GSM-R (Cab-Radio + 2 antennas
+MMI) are to be delivered
5
5
Trackside Products
ERTMS level 2
ERTMS level 1
Class B
Class A (Start March 2005)
EUROBALISES: ALSTOM’s experience comes
from over 200,000 balises in service
(with SNCF KVB), that are similar to Eurobalise.
> 19’000 balises to be delivered
LEU: Line-side Electronic Unit
ALSTOM’s experience comes from 20,000 KVB
encoders in service at SNCF/RFF.
> 2000 encoders, « LEU », are to be delivered
6
6
RBC, main feature (ERTMS-L2)
Fulfills the latest standards
– EN50126/8/9, SIL 4
– Interoperability:
UNISIG spec 2.2.2
– Euroradio FFFIS for GSM-R interface
RBC Architecture
– A 2oo3 safe computer system
– Redundant safe I/O system
– Industrial workstation for Maintenance
and recording.
ALSTOM
tested the features of on-line RBC,
on the 4 Test Tracks (France, Italy,
Netherlands, UK)
> 24 RBC are to be delivered
7
ERTMS ALSTOM Solutions
& Products
ALSTOM Projects; Example of
Switzerland and Italy
ALSTOM Return of experience
Conclusion
8
ERTMS/ETCS trackside Level 1
current commercial projects
CFL:
ground
board
May 2005
TASS:
board & ground
2003-04
SCMT:
board & ground
2004
Zaragoza-Huesca
Athens suburban:
ground
2004
ground
2004
most projects: SRS 2.2.2
9
ERTMS/ETCS trackside Level 2
current commercial projects
Belgium L3/L4:
Level 1 & 2 (ground)
2006
Betuwe Route :
Level 2 (ground)
June 2005
SBB (Mattstetten-Rothrist)
Levels 1 & 2
~500 cabs
2004..2006
most projects: SRS 2.2.2
Rome – Naples
Bologna – Florence
Bologna –Milano
Torino Novara
(Milano)
Level 2 (ground)
2004..
10
ERTMS/ETCS carborne
current commercial projects
SNCB-M6:
32 cabs
2004-2007
CFL:
146 cabs
May 2005..
France bi-std KVB STM:
2006..07
Czech Pendolinos
EuroAVE
Lanzaderas
(1 & 2)
ATB / ATB-NG
118 cabs
15 cabs May 2005
2004..
SBB (Mattstetten-Rothrist)
Level 2
~500 cabs
2004..2005
Cisalpino
ETR500
New Pendolino
106 cabs
2004
Athens
16 cabs
2004
11
Switzerland: SBB - Mattstetten-Rothrist
ERTMS/ETCS SBB Project
45 km double track
10 km single track
ETCS Level 2 area
12
Switzerland Mattstetten-Rothrist
Maximal speed:
200 km/h
Mixed traffic on Level 1 line (Step 1):
- ERTMS equipped rolling stock and
- ZUB as fallback ( = reversed STM ) equipped rolling stock
•
Mixed traffic on Level 2 line (Step 2)
Operational headway: 2 minutes
Pure Class 1 specifications (SRS version 2.2.2)
13
13
Switzerland Mattstetten-Rothrist
ALSTOM Scope :
•
Trainborne: > 500 cabs, including:
ETCS (EVC, MMI, JRU...), GSM-R data, GSM-R voice, analogue radio
•
Trackside: 1 RBC and local peripherals
- LCS for local train supervision, including implementation of
TSR, (Temporary Speed Restrictions)
- LMS, Local Maintenance Station
•
System Integration:
• 1 electronic IXL + train detection products (Alcatel)
• Balises (Siemens)
• Interface with GSM-R network
•
Installation, Maintenance, After-sales support
14
Switzerland Mattstetten-Rothrist
Step 1: Service in Dec. 2004 with partial ERTMS
– ERTMS fallback:ERTMS L2 HW & SW but with specific dataprep for
use of MMIs & interfaces
– 130 trains in service, 250 trains for Dec 2004.
– Target: 1 min delay per train per week for 12 Dec 2004
Step 2: Full ERTMS L2 functions
– V&T trainborne and trackside passed
– System FAT end of Nov 2004
– Pre system test on site in June-July 2004
– Full supervision
– Entry-exit scenarios
– Integration test IXL-RBC + Trackside-trainborne communication
– SAT System planned for mid 2005
– Safety case “fit” for ERTMS L2 operation end 2005/2006
15
Switzerland Mattstetten-Rothrist
Trackside Tests
RB
C
RIS
IXL
Real HW/SW data used for system FAT
16
16
Switzerland Mattstetten-Rothrist
Onboard Tests
17
17
IHSL Roma Napoli: ERTMS L2
Verone
Moncenisi Milan
o
Moncenisio
Trieste
Padova
Venise
Turin
Bologne
Genova
Florence
Rome
Naples
Lines to be implemented
Battipaglia
Lines for which the detail design has been drawn up
Planned lines
ERTMS Level 2 on high-speed network
18
Rome-Naples Line characteristics
Line
–
–
–
–
216 km and 18 Stations
Max speed
Operational headway
Typical block
300 km/h
5 min
1500 m
ERTMS (3 RBCs & 15’000 Balises) complete system
test in 2004
– Trains runs at 300 km/h with overlap of 2 RBC/IXL achieved in
May 2004
– August 27/04 system test in Tunnel
provisional acceptance expected Jan 05, in revenue
service in Dec 2005
Scope includes 27 trains ETR500 + 26 Pendolinos
19
ERTMS ALSTOM Solutions
& Products
ALSTOM Projects; Example of
Switzerland and Italy
ALSTOM Return of experience
Conclusion
20
ERTMS: ALSTOM Experience
Advance position in ERTMS contracts,
strong return of experience on:
Trackside - Trainborne - System Integration
System integration & validation: on-board, trackside & system
First experience on 4 test tracks
Most advanced ERTMS L2 projects
Interfaces RBC:
- Interface developed with ALCATEL IXL (SA-NBS / SBB)
ANSALDO IXL (IHSL / RFI)
Siemens TCCS (SBB)
- Euroradio + standard protocol
Safety case
ALSTOM has a generic safety case being assessed by ISA
(Trackside/Trainboard)
21
21
ERTMS: ALSTOM Experience (2)
ERTMS L2 Norms & operational rules:
Strong experience in the process of implementation of rules
and operational scenarios (critical point for operators).
Strong Return of experience on Products :
ERTMS L1: Athens (Operation for Olympic Games)
ERTMS L2: IHSL & SBB
=> Product improvement, including Ergonomic
SBB: Return on experience based on 130 trains in operation
Generic on-board solutions:
- Implemented on various types of trains
- Interfaces developed with - GSM-R networks
- Onboard central units
ALSTOM has now an advanced return of experience in ERTMS as:
- Product provider
- System integrator
22
22
Experience in ERTMS Test Scheme
- RBC interface tests
- Complete subsystem integration
tests
- Integration test of indoor
equipment before site delivery
- Integrated tests to secure delivery
of reliable equipment
Test phase is critical for successful implementation of projects
23
ERTMS Test Bench
Experience :
- Thousands of tests for RBC and EVC
Train-borne
- Used by SBB and RFI/FS for validation
- Recognized by ISA for Acceptance
Network Transmission Gateway
24
ERTMS ALSTOM Solutions
& Products
ALSTOM Projects; example of SANBS and IHSL
ALSTOM Return of experience
Conclusion
25
CONCLUSION
With around 15 ERTMS projects in parallel, among which 5
major ones, ALSTOM has a leading position in ERTMS:
•ALSTOM Baseline SRS 2.2.2 already in hands:
Strong return of experience through full-scale
tests and operation
•Improved Engineering Processes based on current advanced and
challenging projects
ALSTOM reference solution is in operation
with stabilised generic platforms
26
April 2002
Thanks
www.alstom.com
www.ertms.com
27