Transcript Introduction to Data Transmission
ICT Policies and Regulations in Africa: Implications to NRENs
Lishan Adam
Outline
Progress in regulations and ICT policies
Qualitative view of ICT policies and regulations
Regional dimensions of regulation
Challenges and opportunities
Emerging policy and regulatory issues within the context of NREN
Implications
Progress
Reform in the telecom sector in all countries and improved private investment Tele-density from 1% in 1990 to above 10% in 2005 (including mobile) Mobile footprint of about 30% Internet usage, slow but improved (about 2-3%)
Subscribers in Africa in 2003 (millions)
51 22 Mobile Mainline RECs (ECOWAS, SADC, COMESA), NEPAD, ADB have made in regional networks and broadband top priority Independent IXPs in about nine countries Market entry by alternative communication service providers (Gas, electricity, railway)
Progress in Sector Reform
50 45 40 35 30 25 20 15 10 5 0 3 17 37 42 30 36 41 C om pe tit Pri io va n M in tiz at b ore as io th n ic of an s erv th tw e o ic in ce Pri es cu llu va m te la be c r o el nt U pe lu pt ra la o to r o da rs pe te Se ra s Se to ec pa rs to pa ra r l ra te aw te p re os s gu t a la nd to r te le co C m PE tra de 48
Source: World Bank
Less than 5% have moved towards full competition in basic services Over 35 countries have yet to introduce competition in fixed segment
Reform agenda incomplete Public and private sector investment is required for rapid diffusion of NRENs Good regulation is a must for lowering cost and bring about rapid investment
Qualitative view – regulatory situation in Africa
Using a key benchmarks like legal status – laws creating the regulatory body Independence - budget, decision, legitimacy Competencies – tariff setting, licensing, resource allocation, dispute settlement, interconnection, quality of service, consumer protection, facilitating competition and market entry Internal organization –staffing, management and relationship with the board Regulatory governance – participation of CSO, public Enforcement – enforcement power, interaction with judiciary, arbitration bodies Different pace of reform due to institutional and political factors Three phases in regulation Phase I – regulatory bodies are non-existent or ineffective Phase II – regulatory bodies exist, do assume roles, but weak Phase III – regulatory bodies assume full roles
State owned Incumbent operators Congo DRC Angola Mozambique Nigeria Zimbabwe Botswana Gabon Malawi Burundi Sierra Leone Liberia Mali Congo Tunisia Algeria Togo Monopoly of International Segment Cote d’ivoire Cameroon Burkina Faso Gambia Benin Chad Kenya Zambia Senegal South Africa Niger Mauritania CAR Eritrea Swaziland Sao Tome Equatorial Guinea Sudan Namibia Rwanda Ethiopia Comoros Cape Verde Guinea Bissau Mauritius Lesotho Others Tanzania Morocco Uganda Egypt Somalia Guinea No regulatory Authority Mobile Monopoly
Phase I
Regulatory agencies are non-established (sector ministry in charge) or not functional – e.g Sierra Leone, Liberia, Eritrea,Swaziland One to five staff members Watching the behaviour of monopoly operator Non-existent enforcement and dispute resolution No public participation Limited competencies of staff and inefficient institution Unable to determine market behaviour
Phase II
Countries have created sector regulators and licensed sector participants (Uganda, Kenya, South Africa, etc.) Laws are in place Some independence in allocation of resources, government sets fees and approve allocation Some power in dispute resolution and enforcement via fine A few core competencies Decisions with approval of minister Assume certain roles in market development
Phase III
Barely a few regulatory institutions… Meet the necessary independence and self governance criteria Promote open access - (technology neutral, competition in all layers, opportunities for small players to connect) All the necessary competencies (e.g entry) tariff setting, licensing, resource allocation, dispute settlement, interconnection, quality of service, consumer protection, facilitating competition and market assumed an active role in enforcement, promoting competition, open access in all layers (local, national regional, service, transmission, physical)and general market development Clear from entrenched personal and political interest (focus on long term benefits than short term benefits) Flexible and technology neutral regulation Sophisticated information systems (transparency)
Information Management as a key indicator on progress
NRA web sites survey by Amy Mahan 2004
NRAs with site under construction 11% NRAs without site 11% NRA with partially functioning site 44% No independent regulator 34% Organization do not pay attention to the appeals their content, content management is not a core business
http://www.ncc.org.na/
Information management is often event driven
http://www.incm.gov.mz/
• New tools are not incorporated Web sites remain static http://www.potraz.gov.zw/ , Some feel that basic information could be sufficient
http://www.virtualseychelles.sc/gov er/mitc_telecom.htm
• Outsourcing core function as a result no up to date sites • Outdated web sites
PHASE III PHASE II PHASE I Mauritius, Morocco, Tanzania, Botswana, South Africa Uganda Kenya Nigeria Senegal Cote d’Ivoire Ghana Mozambique Mauritania Zambia Zimbabwe Lesotho Namibia Seychelles Rwanda Malawi Cameroon Mali Sudan Congo Togo Burkina Faso Burundi Cameroon, Niger, Guinea-Bissau DRC Ethiopia Comoros Benin Chad Togo Cape Verde Gabon Gambia Swaziland, Sao Tome & Principe Equatorial Guineas Eritrea, Sierra Leone Liberia Central African Republic
Consequences of weakness in regulation
Slowed transaction and investment due to negative sentiments
Excessive cost of bandwidth
Backbone networks over stretched
Network concentration in urban area
Limited diffusion of wireless and innovative technologies
Challenges
Different pace of reform due to these institutional and political factors Regulation were not up to date to reflect technological changes, rapidly changing circumstances – outdated “Telecommunication ACT” over 7 years makes it difficult to regulate Information asymmetry and low level of competence to regulate/not regulate the dynamic sector Competing institutions (IT, regulator, spectrum management, broadcast, consumer affairs, fair trade, parent ministry) New elements of monopoly and resistance (mobile services)
In imperfect governance situation regulation more about mediating vested interest and political networks Natural tendencies to defend status quo Governments trying to (open the sector and protect the incumbent) Influence of political and individual agendas Personality of regulators, background, relationship to the incumbent and senior policy makers Role of influential sector participants (Board, director of operators) Ignorance and fear of consequences of changes or introducing competition
National ICT Policies
Many countries developed e-strategies between 1999-2003 at the height of enthusiasm about ICTs Were instrumental in raising awareness, society issues mobilization of resource , conceptual shift to ICT4D and digital divide now to wider information Decisive changes to policies and implementation of e-strategies has been difficult Detached from core reform agenda Comprehensive vs focussed ICT experts vs development experts Distribution impact on sectors vs ICT investment Technology push vs reality Internal vs external Commitment vs rhetoric Shopping list vs realistic implement able projects Consensus and participatory vs decree Organic vs driven by institutions New institutions vs competing implementing agencies PRSP/MDG focus vs host of lists under the sun
The number of countries with ICT policies and without
100% 80% 60% 40% 20% 0% 19 99 20 00 20 02
Year
20 04 No policy Underway Policy
Regional Dimensions
Smaller traffic, large number of countries Regional strategies Policy harmonization EARPTO Cross-border connectivity Rationalization of initiatives Investment opportunities (PPP) – mostly studies – DFID, World Bank, e-Africa commission Enabling environment – Interconnection (world Bank) ARICEA e-Africa Commission
Opportunities for NREN
Phasing out of exclusivity period (Senegal, Uganda, South Africa, Kenya, Mali, Ghana) Introduction of converged licensing regime (post exclusivity) – Kenya, Uganda, Mauritius, South Africa Senegal, Tanzania, these announced broad competition IP driven market dynamics Depriving incumbents of lucrative revenue low volume/high margin High volume low margin Digital divide/ information society initiatives WSIS (ITU, ADB) Commission for Africa NEPAD/AU RECs (ECOWAS, ECAAS, COMESA, SADC, EAC, IOC, National (e-strategies, ICT4D policies) Fastest growing communications economy
Implications to NREN
Regulations adapted to NREN take time ( patience ) No homogeneous model or logic in regulation – respond to specific infrastructure, demographic and organizational capacities (institutional, national NREN, sub-regional, continental) Stronger knowledge networks between regulators, policy makers, members of NREN for joint innovations ( focus on local innovations ) NREN members could capitalize on their position in the society (VCs, eminent academics) to negotiate changes in policies ( human relations ) Local policies research and advocacy informed by global best practices (bring in global best practice )
Implications to NREN
Involvement of middle level managers (technocrats drafting policies and regulations) NREN promotion within the contexts of E-strategies e-governance Development, MDGs and government e-education, national S&T policy Regional agenda (Strategic policy advocacy speak the language) Policy and advocacy strategy taking incentives, vested interests, linguistic, cultural and regional factors into account (association with local actors) Smaller better – EARPTO
Implications to NREN
Bilateral, trilateral or … quadrilateral regional aggregations could be used as building block for regional regulations – federated R&E networks useful than regional Organic development start from where it works (SARUA) Regional harmonization through regional regulatory associations ( engage NRAs) Build interface with regulatory associations (participation in AGM, OGM) Awareness – tutorials Model NREN and regulatory implications cookbook(small players, e-rates, Dark fiber, public good) Use of regional organizations (AAU, East African Universities Association, Association of Francophone universities.) Rationalization of regional NREN projects and initiatives (avoid confusions, policy makers do hate confusion and unnecessary details) It is about policy…and commitment of governments AU, NEPAD, RECs (ECOWAS, SADC, COMESA) agenda Policy advocacy requires same level of commitment – “It is political, institutional than technical”