Transcript Document
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT SOME FACTS Twin cities separated by about 20 km. INDIA KARNATAKA Single municipal area: 202 sqkm Population : 0.94 million(2011) Density: 4678 persons per sq.km. NAVALGUND DHARWAD Hubli: commercial centre business hub of the region. and Dharwad: administrative seat of the District and Educational hub of the region. NAVANAGAR HUBLI KALGHATGI KUNDGOL DHARWAD DISTRICT Growth direction: along the corridor between the two cities. Travel Characteristics • Two lane road. • • • • Average time taken: Peak period : 64 mins Public transport: main mode. 0.17 million use PT every day. PT operator: NWKRTC, a state government undertaking. • 6000-7000 PHPDT. Buses comprises 7 % of total traffic along the corridor; carry 70 % of the passengers. Context Project sanctioned for widening of two lanes to four lanes. Overall PT mode share for the twin cities: 30% Two-wheelers: 67% of total vehicles. Vehicle growth rate: 9.5 % Mobility plan projected drop in PT share to 25% by 2028. Concerns for PT 45% of fleet over-aged, Congested buses, poor infrastructure, lack of last mile connectivity. ISSUES Wouldn’t widening to four lanes be enough? Is BRT required at this point of time? • BRT-land acquisition costs, resettlement issues. Wouldn’t widening to four lanes be enough? • Present V/C : 1.3 • Even with 4 laning : V/C > 1 before 2020. • With BRTS, V/C : 0.84 in 2031. Is BRT required at all? BRT-land acquisition; costs, resettlement issues. High EIRR( 29.5%) Benefits: savings in vehicle operating costs, commuter time, benefits due to accident reduction, savings due to reduction in carbon emissions etc. Total benefits valued at US $ 611 million in present value terms. Makeover of PT required to retain present share; to attract more commuters. Public transport needs focus - NOW not LATER. OPERATING COSTS NEED NOT BE SUBSIDIZED. 100.00 90.00 80.00 Income from Operations 70.00 Operating Cost 60.00 50.00 40.00 30.00 20.00 10.00 0.00 2014 2015 2020 2025 2030 Proposed BRTS Corridor BRT - NETWORK DHARWAD PROPOSED BRT CORRIDOR: 22.25 Km NWKRTC terminal Dharwad CBT Jubilee circle Dedicated corridor:21.35 km Mixed traffic: 0.9 km FEEDER SERVICE: 19.7 km Karnataka University Rani Chennamma circle (OCBS) Navanagar Tarihal Industrial area N Gopankoppa Airport LEGEND Hubli Rly Station BRT Corridor FEEDER Terminal HUBLI Hosur cross Hubli CBT Electricity Grid Elements of HDBRTS Dedicated corridor for 21.35 km. In mixed traffic : 0.9km. Central bus lanes with Median bus stops; Closed system. Regular/Express services. Passing lanes. At-level boarding & alighting; Off-board fare collection system ; Fare structure: Increase by 16-20% over prevalent fares. Rolling stock: 160 : 12m, 900 mm floor buses; articulated buses(30) Access to the corridor: At-grade pedestrian crossings; FOBs, Pelican signals. Elements of HDBRTS Comprehensive development of the city transport infrastructure: Depots, workshops, terminals both for BRT and feeder buses. Integration, physical, service, fare, information. ITS for BRT, Depot/workshop management, feeder services and traffic management. Last-mile connectivity. Integrated Land use and transport planning. Communications and outreach. Project financing Total project Cost including Land acquisition: $133.6 million. 18% 35% 12% WBLoan GEFgrant GOK grant SUTF NWKRTC 15% Cesses/surcharge 19% 1% INSTITUTIONAL ARRANGEMENT • Special purpose vehicle created for implementing the project: Hubli-Dharwad BRTS Company Limited – Company registered under the Companies act. – Stakeholders represented on the Board of Directors. • BRT bus operations by NWKRTC. – Service level agreement between NWKRTC and SPV. WHERE ARE WE TODAY • DFR prepared by CEPT University, consultants for the project. • Physical Design : Design of Corridor and Transit Infrastructure completed. • Preparation of RFPs, Bid Documents under way. • Land Acquisition under progress. • BRT Corridor work under progress. BRT Project completion date: January, 2015. HDBRTS - SNAPSHOTS BRT STATION OCBS Hubli Divisional workshop, Airport road, Hubli BRT Workshop, Gokul road, Hubli BRT depot, Dharwad