Integrated Operations on the NCS

Download Report

Transcript Integrated Operations on the NCS

Daglig borerapport
Teleconference May 16th
Agenda
1. Introduction of participants
2. Approval of agenda
3. WITSML Introduction (Alan)
- Background
- Status
- Use
- ...
4. Daily Drilling Report project
- Background (CDRS, etc)
- Status
- Terminology (Pål)
- XML (Arnt Vegard)
5. Discussion Daily Drilling Report and WITSML
- Coverage/compliance
6. How to progress
- Further plans
- Necessary contribution from POSC
- etc..
7. Conclusions and actions
8. AOB
www.olf.no
Daglig borerapport – Background and status
Teleconference May 16th
Drilling - Daily Drilling Report
• Scope: Develop common XML schemas for Daily Drilling Report
• Participants: BP, ConocoPhillips, ENI, ExxonMobil, Petoro, Hydro, IIP project (DNV, POSC,
POSC Caesar, Capgemini,…), NPD, PSA, Shell, Statoil, Total
• Pilots: At least two drilling rigs
• Implementation on NCS: August 1, 2006
• Benefits: Efficient exchange of drilling data and daily drilling reporting
Operator
Internal
drilling
rep.
system
RDL
PSA
XML
file
Drilling
report
LicenseWeb
?
License Web
Operator,
partners
and authorities
Std. reports
Non-std. reports
XML
file
www.olf.no
Scope - details
• Create standard terminology and standard data exchange
formats for daily drilling reporting between operators,
partners and authorities.
• Terminology modeled in ISO 15926 – 4 (Important contribution
to an oil and gas ontology).
• Data exchange formats have to be based on terminology in ISO
15926 – 4. Link between XML schema/XML documents(?) and
RDL
• Phase 1:Cover regulatory reporting requirements given by
“new” Common Daily Drilling Report System (CDRS)
• Phase 2: Cover additional reporting requirements identified
by project participants.
www.olf.no
Current Plan
Date
Task
26.01
 Project meeting (1-06)
24.02
 Daily Drilling Report Terminology based on CDRS suggested.
06.03
 Meeting Hydro
07.03
 Meeting Statoil
08.03
 Meeting ConocoPhillips
09.03
 Meeting BP
10.03
 Start updating according to feedback from meetings and review
23.03
 Project meeting (2-06)
31.03
 Terminology based on CDRS complete
20.04
 XML kick off, POSC, Capgemini, project participants (Originally 2-3 days)
16.05
Teleconference with POSC
23.05
Project meeting (3-06)
16.06
Terminology updated according to new requirements from PSA/NPD
31.07
XML schemas complete
01.08
Start Pilot, and adjust
31.08
Project meeting (4-06) – decision to recommends implementation?
www.olf.no
Terminology & XML- Status
1.
Terminology based on “old” CDRS completed and
added top ISO 15926 reference data library
1.
2.
Outstanding issues except Technical Side Tracks
resolved by IIP and PSA/NPD
Additional requirements from project participants
transferred to Phase 2
2.
Terminology based on new requirements from
NPD/PSA in progress – ETC June 16th
3.
XML Schemas for 5 selected report sections have
been proposed.
4.
Example XML documents containing test data have
been compiled.
www.olf.no
Daglig borerapport – Some issues for discussion
Teleconference May 16th
Issues
• WITSML seem to be “open” while current CDRS requirements are
more restricted. How to handle requirements like reporting in a
certain unit of measure?
• What is the best way of maintaining and documenting the link
between the XML and the terminology in ISO 15926? A proposal has
been made by Capgemini
• ....
www.olf.no