Daily Drilling Report – Phase 2

Download Report

Transcript Daily Drilling Report – Phase 2

Daily Drilling Report Phase 2
Project meeting June 4th 2009
Pål Rylandsholm
Agenda

Approval of agenda

Approval of minutes from last meeting

Decisions and actions from last meeting

Project overview and overall status

Presentation of new XML schema and standard report layout

Approval of XML schema

LicenseWeb implementation, status and plan

Date for cut off to new reporting formats both to PSA and partners (via
LicenseWeb)

Way forward

Conclusions and actions

AOB

Lunch (11:30)
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 2
Decisions from last meeting
Decision 01-09:
The project recommends June 15th as the cut of date for use of the new
XML schema as basis for reports to PSA and License partners.
(NB: This has been overruled – new date to be set today)
Decision 02-09:
The report layout is approved by the project group after the following
corrections
- Lithology Information: "Description" should be renamed "Shows description“
- "Well Control Incident" - "description" to be added in table cell below data row.
Decision 03-09:
The solution in LicenseWeb will be based on operators submitting complete
reports when updates or corrections occur.
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 3
Actions from last meeting
18/12/2008 - 3:
Discuss with OLF and EPIM how to handle the replacement of the old partner report
with the new one in the licenses.
Responsible: Ove Ryland, EPIM
Status: On agenda (Way forward)
Action 01-09:
Check out the compatibility of the PSA/NPD system for receiving, validating and
storing daily drilling reports with decision 03-09.
Responsible: Jonas Stokka, PSA.
Status: Do not want updates on a daily basis, updates received via final report.
When necessary “created date” will be criteria for selection of valid data.
Action 02-09:
Provide an updated plan for the Licenseweb implementation, with completion as
soon as possible, and in due time before June 15th
Responsible: Alfred Johnsen, Tieto.
Status: On agenda
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 4
Status

As of March 24th EPIM officially owns the DDR XML schema

Partner reporting in License web
- Same information content as submitted to PSA
Status:
- Specification document completed
- Build - in progress

Updates to XML schema – documented in separate document
- WITSML 1.4.0 compliance
- Correction of misspelling of enumerated values
- Correct use of wrong data types (For example on comments which are limited to 256
characters)
- Some elements may be changed from ‘optional’ to ‘mandatory’ in the report.
- SAWSDL annotation
- Coordination with Energistics
Status:
- Tested and completed – ready for approval by project group
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 5
Status

Standard report layout for PDF reports
Status:
- Completed – approved by project group in meeting February 9th 2009

User guide updates - PSA
Status:
- Draft version available at (http://www.ptil.no/getfile.php/PDF/DDRS%20%20borerapportering/WITSML_drillReport_profiled_schema_for_usermanual.
xml)

Schema validation error messages - PSA
Status:
- Business rule validation error messages will be updated by cut of to new
formats
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 6
DDR to regulators and license partners
- Scope and deliverables of DDR phase 2
PCA RDS
Operators
Regulators
NPD/PSA
Fact database
DDR
XSD
Daily
Drilling
reports
XML
Drilling
App/DB
Drilling
data
Daily
Drilling
reports
XML
PSA/NPD
app
License Partners
LicenseWeb
pdf
pdf
pdf
Deliverable in progress
Daily
Drilling
reports
XML
Completed deliverable
Schema/Business
validation
© Det Norske Veritas AS. All rights reserved
21 July 2015
Drilling
App/DB
Slide 7
Way forward
1. Completion of DDR partner reporting in LW – Responsible Tieto, follow up by LW
User forum
2. Communication to EPIM members regarding new DDR formats and date for go
live of DDR reporting in Licenseweb – responsible EPIM Report User Forum –
Drilling
3. Communicate to operators regarding cut of date for new formats to PSA –
Responsible PSA
4. Project documentation will be added to EPIM’s document repository
5. October 1st is the date when PSA will require DDR according to the new
formats, and the new DDR partner reporting solution in Licenseweb will be
ready for use!
6. Further improvements and extensions of the DDR XML schema will be handled
by EPIM RUF – Drilling
 A possible first case can be increased information scope in DDR. See Next slide
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 8
Additional information requirements
– NB not included project scope
Identified during DDR Phase 1
 Operation codes
 Cement
 Period of operation
 “Drilling like units of measure”
 Formation name – selection list
 Datum (reference points)
 Casing type
 Pressurized coring
 Well stimulation (At well testing)
indicator
 Perforation - Shot density
 RIGTYPE
 Bit data
 Side track
 Tight wells
© Det Norske Veritas AS. All rights reserved
Identified during DDR Phase 2
 Cost
 Report nr -> A sequence number.
Each day of operation is a new
number increment
 Start date -> Start of
reporting/operation
 Water depth
 Bit record (additional info):
grading, depth in, depth out, drill
lenght (m), duration (hr), rop
(m/hr)
 Casing (new section): OD (in),top,
bottom, weight, grade, estimated
top of cement
 "Duration" should be included for
all time intervals.
21 July 2015
Slide 9
© Det Norske Veritas AS. All rights reserved
21 July 2015
Slide 10