WITSML Public Seminar Introduction
Download
Report
Transcript WITSML Public Seminar Introduction
Overview and Introduction
Regional SIG Meetings
March 22-23, 2006, Houston, Texas
June 13-14, 2006, Stavanger, Norway
June 20-21, 2006, Aberdeen, Scotland
© Copyright 2006 POSC
Regional SIG Meeting Roles
• All
– Maximize value delivered from POSC to industry and from
industry to POSC
• POSC and SIG Members
– Maximize value delivered from POSC to members and from
members to POSC
• Translation:
– Learn what’s cooking and get involved
• As a patron, a server, a chef, a supplier, a manager, …
– Contribute items you need/want for “tomorrow’s” menu.
• As a champion, subject expert, connoisseur, cook, or guest
© Copyright 2006 POSC
Overall Standards Process
Stage
Description
0
Opportunity Discovery, Evaluation (ongoing), <decide>
1
Planning, Review, <decide>
2
Requirements, Review, <decide>
3
First Specification Iteration, Review, <decide>
4
Iteration Cycles of Revision and Review, <decide>
5
Final Reviews, <decide>, Release
6
Promotion, Support [<decide> May go to 0 for upgrade]
7
Periodic Effectiveness (Value Delivery) Review
[<decide> May go to 0 for upgrade or retirement]
© Copyright 2006 POSC
Success Factors
• Collaboration – steer [just] clear of competitiveness
• Value – neither theory nor art are sufficient reasons,
must enhance real business advantages
• Change Agency – standardization requires change
–
–
–
–
–
Innovation
Resources
Marketing
Planning
Execution
© Copyright 2006 POSC
Oct 17-19 Events
• Public Seminar and Vendor Exhibition (Oct 19, Thursday)
– Current reports from actual experiences and plans from oil
companies, service companies, and software companies.
• SIG Working Meetings
– Technical Teams
• We address implementation feedback and continuing detailed specification
issues
– Use Case and Requirements Team
• We address possible future areas of focus: drilling reports, completions,
environmental, well services, well stimulation, service rig reporting.
– Implementation Support Team
• People supporting WITSML-enabled environments share lessons learned
and current issues and challenges.
© Copyright 2006 POSC
May 19: WITSML Public Seminar
• Meeting Host: BP
• Exhibitors (from May 2006)
– Baker Hughes, IDS, INT, Knowledge Systems,
Merrick Systems, Paradigm, POSC, Roxar,
Schlumberger, SDC Geologix, Sense Intellifield,
Smith Bits, Wellstorm Development
© Copyright 2006 POSC
June 14 & 20 and Oct 20: Integrated
Production Operations SIG Meetings
• June 14 – Stavanger (NPD)
• June 20 – Aberdeen (ExxonMobil)
• October 20 – Aberdeen (BP)
© Copyright 2006 POSC
Meeting Plan
• Jan 11. India. Preliminary Geophysics and WITSML
Deployment meetings
• Mar. 22-23. Houston. SIG Meetings
• May 9-12. Houston. WITSML and IntOps Events [SLB host]
• June 13-14, 20-21. Norway and UK. Regional SIG Meetings
• Sep. 19-20. Houston. SIG Meetings
• Oct. 17-20. Europe. WITSML and IntOps Events [BP host]
• Nov. 8. Houston. Annual Member Meeting
• Nov. 28-Dec. 1. Europe. Regional SIGs (2 locations)
© Copyright 2006 POSC
Standards Activity
in 2005 and 2006
Drilling
Production
Geology
Data Mgt
Regulatory
Technology
Consulting
Drilling
Production
Geology
Data Mgt
Regulatory
Technology
Consulting
Geophysics
© Copyright 2006 POSC
Drilling Portfolio
Standard
Type
History
WITSML Drilling &
Family
Data
Xch
- WITSML
Completion
Norway Daily
Drilling Project
Active
Next
Comments
Start 2001, V1.2
Xfer 2003
V1.3.1
TBD
Stage 6, ’06 13%
Data
Xch
B 2004
N/A
N/A
Q2
Stage 4 5
V1.3.1 supplement
Data
Xch
Start
pending
N/A
N/A
TBD
OUTSIDE,
Stage 1, ’06 2%
Drilling (WITSML) SIG Facilitation, ’06 10%
© Copyright 2006 POSC
Stable
WITSML Drilling: Vision
• Now
– Mainly geosteering support
– Mainly straight-through source to operator
– Usage
• Statoil and Hydro 100%,
• 2+ Majors High-end Wells,
• 1+ Major Significant use by early ‘07
• +2 or 3 Years
– Broader range of business processes
– Sufficient maturity for aggregation/QC by service companies
– Greater usage by operators
• Quantification
– Considering profiling WITSML Drilling benefits in terms of project costs
and savings for typical drilling projects
© Copyright 2006 POSC
E&P Subject Areas: WITSML Coverage
Board
Economics
Production Reservoir
Geology Engineering
Expl Petrophysics
Geology
Drilling
Engineering
Geophysics
Drilling
Operations
Petroleum
Engineering
Production
Engineering
Completion &
Workover
Facilities
Engineering
Production
Operations
Can we use this image to portray the growth in WITSML coverage?
© Copyright 2006 POSC
E&P Subject Areas: WITSML Coverage
WellPath
Board
General
Well
Wellbore
Trajectory
Economics
Log,WellLog
Production Reservoir
Geology Engineering
Expl Petrophysics
Geology
Drilling
Engineering
Geophysics
Drilling
Operations
CRS, Projections
Units of Measure
Petroleum
Engineering
Production
Engineering
Completion &
Workover
Facilities
Engineering
Network Model
Volume Report
Activity Report
Production
Operations
Enhancements for Production beginning with Volume and
Activity Reporting, continuing with PRODML towards Optimization.
© Copyright 2006 POSC
E&P Subject Areas: WITSML Coverage
Board
General
Economics
Production Reservoir
Geology Engineering
Expl Petrophysics
Geology
Drilling
Engineering
Geophysics
Drilling
Operations
Petroleum
Engineering
Production
Engineering
Completion &
Workover
Facilities
Engineering
Production
Operations
At a future time, we could consider the viability of data exchange Standards
for facility data, reservoir data, economics data, etc. filling out the E&P space.
© Copyright 2006 POSC
What’s in a Name? epiXML Family
epiXML
Board
Economics
Production Reservoir
Geology Engineering
?ML
?ML
Expl Petrophysics
Geology
?ML
Geophysics
Drilling
Engineering
Petroleum
Engineering
Production
Engineering
Facilities
PRODML
Engineering
&
WITSMLCompletion
Workover
Drilling
Operations
Production
Operations
?ML
Regardless of the naming pattern, this is one integrated
Standards Family with a great deal of reuse and consistency.
This anticipates a successful integration of PRODML results.
© Copyright 2006 POSC
Production Portfolio
Standard
Type
History
WITSML
Data
Xch
Active
Next
Comments
Prior 1999, N/A
Start 2005
N/A
Q2
Reporting, Stage 4 5,
Deployment In Norway,
’06 14%
WITSML Production Data
Optimization
Xch
Start 2005, N/A
Xfr Q3
N/A
N/A
OUTSIDE: “PRODML”,
Stage 3, ’06 7%
Pilots Apr – Aug.
WITSML Production Data
DTS
Xch
Start 2004
N/A
1.3.1
TBD
Stage 6, Deployments
by BP and Shell
WITSML Production Data
Lab (Fluid Analysis) Xch
Xfr 2004,
Start 2005
N/A
N/A
Q2
Stage 3, ’06 2%
Norway IIP Project
Start 2004
N/A
N/A
N/A
OUTSIDE, ’06 2%
Stage 3; Statoil, Hydro.
Production,
including Reporting
Mixed
Stable
Production (Integrated Operations) SIG Facilitation, ’06 8%
© Copyright 2006 POSC
Production Portfolio: Vision
• Now
– Daily Reporting to Partners:
• Ready for Public Review, Deployment starting in Norway
– PRODML Work Group due to complete end of August
• Three basic optimization use cases: specifications and pilot testing
– Distributed Temperature Survey Standard published
• Field deployments by BP and Shell (Lios, SLB, Weatherford)
• +2 or 3 Years
–
–
–
–
Co-existence with / adaptation for OPC Foundation UA
Integration of Optimization and Reporting
Beginning of Automation of Administration, Scheduling, etc.
Integration with Equipment and Facility reference standards
• Quantitative / Qualitative Value
– Baseline in ’07.
© Copyright 2006 POSC
Standard
Type
WITSML Geology
wellLog
Data
Xch
WITSML Geology
Depth Registration
Geology Portfolio
History
Stable
Active
Next
Comments
Start 2004, N/A
Rel 2005
1.3.1
TBD
Stage 6, ’06 2.5%,
DIGGS use
Data
Xch
Start 2004
N/A
N/A
Q2
Stage 5, ’06 2%
supplement to V1.3.1
PWLS
Ref
Start 2001
2.0
2.0
Q1
Stage 6, ’06 5.5%
Shell, XOM, Petris
RP66 (DLIS)
Data
Xch
Xfr 1996
1&2
1&2
N/A
Stage 6, ’06 0.5%
WellLogML
Data
Xch
Start 2000
1
2 draft
N/A
Stage 6 & 7,
transition to WITSML
LogGraphicsML
Data
Xch
Start 2000
1
N/A
N/A
Stage 6 & 7
LAS (CWLS) to
WITSML Utility
O.S.
Utility
Start 2005
N/A
N/A
Q1
Stage 3,
Ready for First Review
Geology (PWLS) SIG Facilitation, ’06 4.5%
© Copyright 2006 POSC
Data Management Portfolio
Standard
History
Stable
Active
Next
Comments
WITSML Well Path Profile
Start 2004
N/A
1.3.1
TBD
Stage 4, ’06 1.0%,
Review by “Tech Team”
WellHeaderML
Data
Xch
Start 2000
2.0
N/A
N/A
Stage 6, ’06 1.0%
UK Usage,
PPDM Profile
WellChemicalML
Data
Xch
Start 2002
1.0
N/A
N/A
Stage 6
UK Usage
WellPathML
Data
Xch
Start 2001
1.0
N/A
N/A
Stage 6 & 7, WITSML,
PPDM Profile
Well Identity
Service
Ref
Service
Start 2004
N/A
N/A
TBD
Stage 3, ’06 1.8%
RFP in Q2
Epicentre
Data
Model
Start 1991
3.0
N/A
TBD
Stage 6, ’06 0.5%
Ref. SLB and LGC
Geoshare
Data
Model
Start 1992
13.0
14.0
N/A
Stage 6
© Copyright 2006 POSC
Type
Data Management Portfolio
Standard
Type
History
Stable
Active
Next
Comments
Reference
Entities
Ref
Start 1991
Varied
Varied
TBD
Stage 6, ’06 2.7%
CRS/Geodetics
Ref
Start 1993
Varied
Varied
TBD
For WITSML,
Phase 2-Stage 4,
’06 0.8%
Lithology
Ref
Start 2005
N/A
1.3.1
Q1
Phase 2-Stage 3,
’06 0.8%
E&P Catalogue
Ref
Start 2003
0.5
0.5
TBD
Stage 6, ’06 1.8%
E&P Bus Pro Ref
Model
Ref
Start 2004
1.0
1.0
TBD
Stage 6, ’06 0.1%
Data Management (DSS) SIG Facilitation, ’06 1.8%
Liaison 0.2%, Outside 1.0%, Help 0.5%
© Copyright 2006 POSC
Regulatory Portfolio
Standard
Type
WITSML Regulatory Data
Permitting
Xch
© Copyright 2006 POSC
History
Stable
Active
Next
Comments
Start 2004
N/A
N/A
Q3
California, Stage 5,
4-6 states, Stage 2,
’06 3%
Geophysical Portfolio
Standard
Type
History
Stable
Active
Next
Comments
GeophysicalML
Data
Xch
Start 2000
N/A
N/A
N/A
As reference only
WITSML
Geophysical
Data
Xch
N/A
N/A
N/A
N/A
APAC Stage 1 & 2,
’06 2%
Geophysical SIG Facilitation, ’06 2%
© Copyright 2006 POSC
Alan Doniger, POSC Chief Technology Officer
Email: [email protected]
Phone: +1 713 267-5124
Fax: +1 713 784-9219
http://www.posc.org
http://www.witsml.org
http://www.prodml.org
© Copyright 2006 POSC