Nuclear power plants in
czech republic
Jan Zrno D4 -90
Temelin
Dukovany
Temelin - history
•
•
•
•
•
•
•
•
1980 - Czechoslovakian goverment accredit the construction of Temelin
nuclear powerplant.
1985 – Energoprojekt company elaborate project documentation for
construction.
1987 – Construction started
1990 – Constrution was reduced. The goverment accredited construction of
just 2 units instead of 4, planed originally.
2000 – Construction finished
2002 – Trial operation of first unit.
2003 – Trial operation of second unit.
2004 – 13,4 TWh pruduced by temelin
Geography
•
•
•
•
510 above the see level
Largely surrounded by forests
45 – 50 km far from state boundary (Austria, Germany)
143ha piece of land (on hand ČEZ a.s.)
Technical parameters of reactor
•
•
•
•
•
•
•
•
•
•
•
•
Reactor Type VVER 1000
Installed capacity2 x 1000 MW
Heigh od pressure tank 10,9 m
Inner diameter of pressure tank 4,1. Outter 4,5
Total weight 800t
163 fuel cartridges (766kg, 563 kg of fuel)
4 cooling loops (15,7 Mpa – operating pressure)
Temperature of the cooling medium in front of the entrance to active zone –
290°C
Temperature of the cooling medium in the output from to active zone –
320°C
Discharge 84 600 m 3/h
Inner diameter of major recirculation line 850 mm
Outer diameter of major recirculation line 995 mm
Steam turbines
• Steam turbine: nominal rpm - 3000
• Steam discharge (100% of power) 5262,9 t/min
Coling shafts:
• Height: 154,8 m
• Foundation diameter: 130,7 m
• Crest diameter: 82,6 m
• Thickness of wall: 0,9 – 0,18 m
• Weight: 27 500 t
Planed annex of Temelin
•
•
•
•
•
Last years, the nuclear power is epericing the rebirth all around the world.
Annex of Temelin (another 2 units quarantee coverage of increasing
consumption of electricity after 2020, sufficient reserve of power for stability
of electric grid)
Original project – 4 units (build-up of remaining 2 units fully exploit originally
designed infrastructure
Price of project still unknown (after concractor selection procedure)
Own sources of ČEZ (bank loan)
Technology – new units
•
•
•
Several variants.
Pressure water reactor (PWR). II and III generation
Temelin and dukovany – II generation
AES-2006 – derived from previous two units
• Atomstroyexport and Gidropress companies
• 1113 MW
Areva EPR
• Developed by AREVA company
• Derived from N4 and Konvoi reactors actually in operation in France and
Germany
• 1600 Mw
Westinghouse AP1000
• Developed by Westinghouse company. 50 years of experiences.
• F.e. 4 block in China actually in construction
• 1117 MW
Nuclear waste depository in CR
•
•
•
•
•
•
Responsibility for safety deposition comply with atomic law.
50 CZK / MWh of electricity produced in nuclear power plants.
All financial resources are cumulated in „atomic account“ which provide
money for all liabilities connected to nuclear waste depository.
Majority of wastes produced by nuclear power plants are low activity nuclear
wastes (lost its activity in several hundreds of years)
Bigest radioactive waste disposal – Dukovany (55 000 m3)
Sufficient capacity for whle lifetime of Temelin and Dukovany
Atomic energy around the world
•
February 2010:
– 29 countries
– 436 nuclear reactors in operation
– Total instaled power 372 693 MW
– 15 % of all electricity produced (worldwide)
– 53 reactors in 13 countries in construction
– 142 reactors construction are in project stage
– Totaly 327 rectors planned worldwidely (343 000 MW)
•
•
USA, France, Japan, Russia, etc.
65% of PWR reactors worldwidely