Providing Affordable Housing
through PPP mode
A presentation by Shri. M.D. Lele, Chief Planner, CIDCO, Navi Mumbai
Introduction
Housing the poor
Metro cities house a large percentage of migrant population with
people living in either rented houses or in slums/squatters
48 % of the people in lower segment are currently staying in rented
accommodation*
Affordable housing options for weaker sections is need of the hour
* - Tata Housing study
Overview of CIDCO’s past efforts
In Navi Mumbai
Estimated 18 lakh population
Total formal housing stock - 2.18 lac units
CIDCO - 55% and Private sector 45%
CIDCO’s total housing stock - 50% towards housing the poor
CIDCO’s focus on the EWS/LIG section, the most striking
aspect
Land as resource and system of cross-subsidy
CIDCO constructed, BUDP scheme and DRS scheme - three
major categories
Overview of CIDCO’s past efforts
BUDP Project
Launched in early 80s
Supply of serviced land to manage the problem of slums
Securing long-term legal tenure
Focus on incremental housing
Option to construct as per their financial condition
Provision of basic services with recovery
Plot sizes and infrastructure based on ‘affordable costs’
Massive scale, spread over 6 nodes across Navi Mumbai
22,300 serviced sites/Dwelling units created
Invoked enterprise of the citizen through design and construction on
their own terms and financial conditions
Overview of CIDCO’s past efforts
DRS Scheme
DRS scheme - Public- Private partnership both in design and
construction
Layouts and Building design skills of 10 national level Architects
were on display in 9 different nodes based on ‘organic chaos’
Equal number of private developers given opportunity to design and
build housing schemes
Layouts had heterogeneous and equal mix of LIG: MIG: HIG
categories and together gave 6500 odd EWS/LIG units
The entire scheme was ‘low-rise high density’, laying a valuable
example of public-private partnership in Social housing
Overview of CIDCO’s past efforts
Circa 1991
Reduced role of CIDCO
Increased role of private sector
Focus on EWS/LIG diluted
Currently prices rising rapidly
Provide many housing options
Overview of CIDCO’s past efforts
Recent Housing Schemes
Vastu-vihar Scheme Celebration Scheme -
Unnati Housing -
Approach for future
Mass Housing Schemes
Rental Housing
RPZ land model
BSUP Project
Approach for future
Mass Housing
An ambitious scheme of making
available 50,000 houses (1/10th of
the target for the Mumbai
Metropolitan Region set by the
State Government) in Navi
Mumbai area over the span of
next 10 years
The Corporation has currently on
the drawing board schemes to
construct approximately 12,500
tenements
Focus firmly on the weaker
section and middle class
Sr. no.
Node
EWS/LIG
MIG
HIG
Tenements
1
Ghansoli
1200
-
-
1200
2
Vashi
450
-
-
450
3
Khargha
r
2292
588
620
3500
4
Ulwe
810
338
202
1350
5
Taloje
3596
1510
894
6000
Total
8348
2436
1716
12500
Approach for future
Rental Housing
Corporation to construct housing complexes at strategic locations
Locations nearer railway stations and in comparatively lesser land
price nodes to minimize travel costs and ensure lower rents
Dispensation already in place to recover the service charges, etc.
in each node.
Receiving applications, maintaining database of applications, allot
tenements on fair basis and recovering monthly rental charges is
possible
Maintenance of buildings and recovery of rents, other charges to
be outsourced to private agency
Ensure that assets created are sustainable
A pilot project of about 500 tenements is in the offing
This model thus attacks the root of the problem viz. affordability
Approach for future
RPZ land model
GoM has acquired and transferred about 200 sqkm. land
Undulating lands are not acquired and today land acquisition is costly
2000 ha. of lands lying in the RPZ are amenable to development in
terms of favourable topography
Low intensity development feasible but high cost of infrastructure
provision
Approach for future
RPZ land model
Model - Developed plots with infrastructure given back to the land
owners in-lieu of the raw land to be surrendered for re-organization
Developed plot area to vary from 15 - 25 percent based upon the
locations of land parcels vis-à-vis road network
To bring about orderly development in terms of well organized land
parcels having a certain threshold size
Approach for future
BSUP Project
Tho’ Navi Mumbai is a planned effort, slums have come up
in the city
To address the issue early, CIDCO has been appointed the project
implementing authority under the BSUP project for construction of
13,600 dwelling units costing Rs. 300 crores (approx.)
Central Government Grant under the JnNURM scheme - Rs. 139.44
crores, GoM share - Rs. 80.42 crores and monetary contribution by
beneficiaries ranging from 10-12% of the cost of tenements is
expected
Approach for future
BSUP Project
Solicit private sector participation
Obligatory on the part of the developers to handover free of cost
13,600 tenements in these pockets
The balance built-up area out of 2.5 FSI on the gross plot area
shall be for sale essentially to EWS and LIG income people only
(30 and 45 sqm. BUA only)
15 to 25% of the permissible built-up area with 2.5 FSI could be
utilized for commercial use – Viability of scheme
Alternatives
Land at fixed price, building plans, technology approved by
CIDCO. 50% tenements to be handed over to CIDCO for
disposal. Max FSI – 3.0
Land at fixed price, building plans, technology approved by
CIDCO. Instead of handing tenements, give premium. Max
FSI – 3.0
Land at market rate. Max FSI – 3.0, building plans,
technology controlled by CIDCO
Other Alternatives
Private developers assigned residential plots >2000 sqm. to
surrender BUA to CIDCO in form of EWS/LIG tenements
Private developers assigned residential plots >2000 sqm. To
compulsorily construct EWS/LIG tenements
Developers to be compensated for surrendered part by
allowing additional proportionate FSI
All inclusive housing on land at fixed price
Free House Component (Rehab component)
Affordable houses (to be handed over to CIDCO at cost)
High priced housing (Developers component)
Selection on basis of maximum number offered for rehab
THANK YOU