Transcript Document
Projects in Progress FOIS – RMS and TMS VSAT Crew Management System (CMS) Integrated Coaching management System (ICMS) Control Office Application (COA) Radio Frequency Identification (RFID) Web Enabled Claims Office Application Integration of in-motion electronic weighbridges Network Upgardation Electronic Payment Gateway (IREPG) Estimate and Budget Allotment of Funds For various Projects in the Year 2006-07 Figure in Thousands Pink Book No. Name 60 FOIS * Source Capital Cost Allotment 4227942 300000 Web Enabling of 69 Claims DF-1 24000 2000 71 COIS ** Capital 70000 48000 76 IREPG DF-3 25000 2000 DF-1 25000 4000 DF-3 381600 80000 860300 240000 Web Enabling 78 Phase -2 Crew 79 Management 80 Control Charting Capital * Expenditure on FOIS project has been Rs. 367.04 Cr upto June 06 ** COIS estimate was enhanced to Rs 17.32 Cr (sanctioned by Rly Bd on 12.05.06) FOIS – RMS Module Successfully implemented on 233 locations on IR, comprising Railway Board, Zonal and Divisional HQs, Area Controls and major yards More than 1100 PCs networked for this phase Daily and periodic reports being generated for Railway Board, Divisions and station level (around 2000 reports) FOIS – RMS Locations Railway Locations CR 15 ER 14 ECR 22 ECoR 14 NR 23 NER 11 NCR 9 NWR 6 NFR 7 SR 16 SCR 21 SER 21 SECR 15 SWR 9 WR 17 WCR 11 Railway Board 1 CRIS 1 Total 233 FOIS TMS Module 537 locations on IR 214 locations on VSAT 324 locations online 126 printing RR online Around 1100 PCs and 400 printers supplied so far 668 PCs and 612 printers under supply FOIS – TMS MODULE Zone Total TMS Locations V-SAT Commissioned CR EC ECO ER NC NE NF NR NWR SC 29 20 67 (29 new) 31 11 13(8 new) 19 58 15 41 1 18 26 5 4 1 10 14 8 16 32 14 16 8 3 4 16 38 2 41 SE 77(8 new) 31 37 SEC SR SW WC WR Total 48 30 19 15(2 new) 44 537 34 3 3 2 11 187 15 30 19 12 37 324 Reason Awaiting Awaiting for delay On Line Inward Commiss Online for RR Locations ioning RR online RR 15 5 0 9 12 2 6 2 V-SAT 2 22 14 CRIS Impl. 23 8 UPS 3 3 8 0 V-SAT 0 9 4 1 7 3 8 19 17 20 2 Channel 0 1 13 1 31 6 4 4 Printers & 4 13 40 20 CRIS Impl. 0 33 15 V-SAT 23 4 0 3 15 3 0 1 0 1 3 11 Zonal Rly. 1 6 7 30 Zonal Rly. 126 68 191 132 TMS VSAT locations 214 TMS locations have to be commissioned on VSATs by IRPMU Railway Board’s target was June 2006. IRPMU’s revised target is Sept 2006 53 VSATs have been installed upto 30.06.06 37 of these were commissioned upto June 2006 The target for July 2006 is for commissioning 64 locations on VSAT Target for 118 (64+53) locations is 15th Aug 2006 16 locations have been commissioned upto 18.07.06 Equipment has been installed at 11 locations Work is in progress at 10 other locations Additional requirement of VSAT based connectivity No of VSAT sites TMS Status 214 Target Sept 2006 CMS Phase I 50 COIS Phase I 59 Electronic weighbridges Additional VSAT Hub provided by IRPMU 30 can cater upto 500 connections. AM/Tele and IRPMU requested TMS Div HQ & 30 to provide 263 additional 76 connections on priority and also Zonal HQ 16 Rly Bd 1 CRIS 1 Total 477 advised to enhance the Hub capacity to 1000. Crew Management System (CMS) Detailed estimate of Rs 38.16 crores sanction by Railway Board. 302 lobbies to be covered, out of which 261 are integrated lobbies. Target for completion 7.3.2007 CMS - Locations RLY. DIV. No. of lobbies to be considered for commissioning of CMS Proposed by Railways Crew BIG SMALL TOTAL INGD. Driver Guard CR 5 42 14 22 36 23 7 3 ECOR 3 11 1 9 10 10 ECR 5 30 6 14 20 17 2 1 ER 4 21 7 12 19 16 2 NCR 3 13 7 5 12 10 2 NER 3 16 5 11 16 12 2 NFR 5 18 13 13 13 NR 5 56 16 25 41 36 2 NWR 4 18 9 5 14 13 1 SCR 6 26 8 14 22 22 SECR 3 19 2 7 9 9 SER 4 22 9 10 19 15 SR 5 33 10 16 26 22 SWR 3 10 3 5 8 8 WCR 3 13 4 9 13 13 WR 6 38 6 18 24 22 386 107 195 302 261 TOTAL 67 Details 2 Changing Suburban 3 1 2 2 1 1 2 1 1 1 2 20 10 8 3 CMS Locations details Gauge No. of Crew No. of Guard Total Staff Avg. crew booking a day INGD. BG 401 579 980 1280 INGD. BG 241 189 430 780 Type of Lobby No. Site ID Zone Division 1 01132B395 CR BB 2 01132B397 CR BB Lobby CSTM (SUB) KYN STN. (SUB) 3 063322120 NER LJN GKP INGD. BG 337 108 445 700 4 044322093 ER SDAH SDAH/ S SUB SUB 812 617 1429 689 5 101322216 SCR BZA BZA INGD. BG 649 272 921 540 6 101321217 SCR BZA RJY INGD. BG 442 246 688 480 7 093326210 NWR JP FL INGD. BG 388 114 502 469 8 133322299 SR P GT ED INGD. BG 686 196 882 432 9 143322323 SWR UBL UBL INGD. BG 416 145 561 366 10 093322211 NWR JP JP INGD. BG 178 70 248 364 11 052322097 NCR ALD ALD INGD. BG 680 412 1092 363 12 094322212 NWR JU JU INGD. BG 325 132 457 362 13 061322110 NER BSB CP R INGD. BG 360 125 485 360 14 106321237 SCR SC KZJ INGD. BG 578 228 806 360 15 084322185 NR MB M B Loco INGD. BG 779 324 1103 352 16 063322119 NER LJN GD INGD. BG 244 130 374 350 17 081322143 NR DLI GZB INGD. BG 578 146 724 346 18 013322020 CR NGP NGP INGD. BG 823 225 1048 336 Status BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE BEING DONE CMS Individual Location details Project Name Site ID Zonal Railway Division Lobby Type of Lobby Gauge No. of Crew No. of Guard Total Staff Average Crew Booking a day Mode of Connectivity Type of Lobby (Big / Small) Contact Person Address Contact Number Crew Management System (CMS) 091324197 NORTH WESTERN RAILWAY AJMER ABR INGD. BG 156 75 231 332 ROUTER & MODEM BIG CMS - Progress Application under development and testing for – Freight module – Coaching, shunting and pilot module – Suburban module Site Preparation – Lump sum sanctioned @ Rs 1,31,000 for major and Rs 81,000 for minor lobbies – Target for readiness Aug 2006 Terminal Equipment – Under vetting – Target of supply - Oct 2006 Datacom Equipment – Under vetting. Will be procured through CRIS Training – Core group and core implementers will be trained at CRIS – Core group identified on all 16 zonal railways – Training labs being set up at 5 locations Integrated Coaching Management System (ICMS) Enhanced scope Punctuality Module Implemented on IR. Migrated module will be given for testing by the end of July 2006 Coaching Stock Management Module Being implemented in three phases Software ready and under field trials at Nizamuddin Ready for roll out Coaching Stock Maintenance Module Maintenance module’s scope received from Railway Board in July 2006. Target for implementation is 31.3.07 Timetabling Module Time table simulation module’s system requirements under discussion ICMS Coaching Stock Management Module Phase I – 114 terminals at 41 locations Target for implementation 31st Aug 2006 Phase II - 78 terminals at 34 locations Target for implementation 31st Oct 2006 Phase III - 128 terminals at58 locations Target for implementation 31st Dec 2006 Training – 186 staff from 136 locations trained so far – Training labs being set up to take care of additional training needs Equipment – Thin clients and printers supplied to all locations – Datacom equipment- 57 LAN extenders supplied. Rest under supply – UPSs to be procured by zonal railways – implementation held up for want of UPSs – 14 locations commissioned – NR-1, WR-9, SECR-3 & SR-1 ICMS Coaching Stock Management Module Zone Phase I Phase II Phase III Total Location Terminals Locations Terminals Locations Terminals Locations Terminals CR 6 10 2 8 0 0 8 18 ECR 4 11 2 4 5 12 11 27 ECOR 0 0 1 2 4 4 5 6 ER 5 20 0 0 2 7 7 27 NCR 0 0 3 9 4 14 7 23 NER 1 2 5 8 3 3 9 13 NFR 1 1 1 1 4 7 6 9 NR 9 26 3 3 10 19 22 48 NWR 2 6 1 2 5 6 8 14 SCR 3 9 1 2 3 4 7 15 SER 3 10 3 10 0 0 6 20 SECR 0 0 1 3 3 9 4 12 SR 5 15 5 15 2 4 12 34 SWR 2 3 3 6 0 0 5 9 WCR 0 0 2 3 3 6 5 9 WR 6 11 1 2 7 12 14 25 KR 0 0 0 0 1 6 1 6 RB 0 0 0 0 1 9 1 9 CRIS 0 0 0 0 1 6 1 6 41 114 34 78 58 128 139 320 TOTAL Control Office Application (COA) Pilot project under trial at Madurai and Trivandrum divisions of SR Functionalities tested – response time issues – application being tuned Tender for customization for IR being being awarded (76 divisional/area controls and zonal HQs) Strategy for roll out – In three phases – Phase I – SR, SCR, SWR, CR, ECOR, SECR – Phase II – WR, WCR, NCR, NR, NWR – Phase III – SER, ER, ECR, NER. NFR Radio-frequency ID (RFID) Board has sanctioned a Pilot project on ECOR at the cost of Rs 1.92 Cr. Approach paper invited by CRIS from System Integrators Requirement to have seamless integration with existing FOIS application A technology group constituted in CRIS for in-depth review of technological options and their suitability in Indian conditions Web-enabled Claims Office Application Phase I – – All modules of Claims, Court, Accident, NR cell. – Completed. Data entry being done by the Railways since 1.04.05 Phase II – – Computerization of Subsidiary Claims Office: • Software development completed. • Varanasi subsidiary claims office computerized. • 15 offices on other railways awaiting hardware and network infrastructure. • Tender under evaluation in CRIS – Refund Goods Application: • Software developed and deployed on all 16 zonal railways – Railway Claims Tribunal: • Software under development Training – Staff of 15 subsidiary Offices (@ 2 each) have been imparted framing of Web-enabled claims application software at CRIS. – Staff of Refund Goods offices of 16 Zonal Railways (@ 5 each) have also imparted training on Refund Goods office application software. Target - Oct 2006 IR Electronic Payment Gateway Sanctioned as a separate work for Rs. 2.5 Cr in 2004-05 Now being implemented along with TMS Working for coal coming from 14 locations on ECR to Badarpur Thermal Power House (BTPP) Payment of 90% of freight on coal to BTPP is now through e-payment Board reviewing extending to other major customers like FCI Issues regarding to-pay transactions raised by FA&CAO Integration of in-motion electronic weighbridges Objective to capture 100% weighment details of all consignments booked through TMS Connectivity being planned between the weighbridge and TMS locations Interface through exchange of data by means of flat files demonstrated to weighbridge companies by CRIS One location each on Nagpur division and Secunderabad division identified to do test runs Feedback awaited Training [All Applications] Five training labs to be set up for all IT training needs Location Claims Office, Staff of Zonal Railways to be trained NR, NWR, NCR, NER Status Estimate under preparation NR, New Delhi Tiruchirapalli, SR, SWR Lacs for networking. Under SR Maulai, SCR Estimate Recd for Rs 6.8 vetting SCR, SECR, ECOR Estimate of Rs 16 Lacs sanctioned Garden Reach, SER, ER, NFR, ECR kolkata, SER Mumbai, CR CR, WR, WCR Datacom Equipment A. CMS - 350 locations 1 2 3 4 5 LAN extender Two WAN router 64 kbps modems Wireless LAN VSAT 284 pairs 102 nos. 400 pairs 02 nos. 29 nos. B COIS- 320 locations 1 2-port routers 85 nos. 2 24-port routers 27 nos. 3 64 kbps modem 450 pairs 4 LAN extenders 144 pairs C Upgradation of FOIS net work 2 Mb 1 Routers 241 nos. 2 2 Mb modems 360 pairs Under finance vetting at CAO/FOIS . PO yet to be placed by CRIS 1. 150 - Received and distributed thru CRIS. 2. 300 - PO placed on 19.07.06. Received and distributed through CRIS. Received - distributed to 8 zonal railway & for others under issue thru CRIS. PO placed on 19.07.06 by CRIS APDJ LDH UMB IZN MB HQ LKO NEBSB DLI HQ FZR TSK RNY HQ KIR LJN LMG NFR NER MLDT BSB SEE NR HWH SPJ CRIS HQ HQ MGS BKN DNR ALD TDL JU HQ NCR JHS HQ KTT ER ADRA RNC BSP BPL SDH HQ CKP HQ HQ JBP AJJ SDAH ECR AGRA JP ASN DHN KGP SER NWR WCR Raipur NAG KUR SECR RTM BSL ADI BVI NED CR NGP BRC GTL PA HQ TNGL MAS HQ PGT LEGENDS UBL Zonal HQ Divisional HQ WAT ECoR MMR BB HQ BCT Solapur Imp Locations SBP HYD BZA RJT WR SCR SC GNT GIM HQ BBS HQ Existing (64KB) Direct link to CRIS MYS SBC SWR TPJ SR TVC New (2MB) HQ MDU RPR GUJ AMB PATIALA 21.6 Yard CEMEN 15.6 NLDM/NFL 13.6 RUPAR 9.6 Connectivity of FOIS Northern Railway V-SAT KART 14 .6 PHASE- 1 KJGY ISDN UMB CDG 16.6 JAT 18.7 ROPAR TPS 15.6 UMB CGS DDL CHKB15.7.05 MOGA 29.6 V-SAT =19 BISHARAT GANJ IFFCO 9.12 (ALL V-SAT LOCATIONS YET TO BE COMMISSIONED) BARELY CGS 29.8 FZR LUDHIANA MUKTSAR 7.7 FZP SDG.8.7 5.SUNAM 6.RAMPUR FUL 7.BARNALA 8.DHURI #9.JAMMU TAWI MB SAHAJAHNPUR 7.9 Yard MB CGS 2.9 FAIZABAD 28.9 TANDA TPH 29.10 11.DDL #12.I.P.SDG MB ROSA 9.9 SSB CEMENT SDG ALAM NAGAR 24.9 #13.ALAM NAGAR Yard SSB OIL SDG GNTP BTI 19.7 10.KOTKAPURA SINDURWA IGFC 10.11 JAGRAON 27.6 MULAPUR 24.6 4.SANGRUR BABRALA FERTILIZER 3.12 AJITWALA 15.7 Jullandhar FZR CITY 2.BHAULI 3.GURGAON GOBINDGARH 21.6 FAZILKA 6.7 SUCHIPIND IOC 19.7 1.DIWANA PHASE - II 57 NOS (NON-V-SAT=38 RAJPURA 4.7 KNN 18.6 27 NOS LKO 14. FGTP BSB CGS BTI-2 BTI #16. TANDA/TPH PANIPAT 1.8 SSB LEHRA MOHABBAT TPS BTI NFL 21 .7 BKN DKZ 27.7 Rly Bd. TKD RE BADARPUR TPH,TKD 7.04 #17. NLDM/NFL ALD Juhi Yard Panki GZB GZB CGS 7.04 BH CHE OKI ALD (NCR-HQ) IPSDG 28.7 PHASE- I TKD MINERAL 7.04 BSNL CHANNEL PALWAL 31.8 RLY CHANNEL U/G CABLE ISDN 18 BABRALA 19 BASHARATGANJ TUNDLA DLI CRIS JODHPUR BSB PNP BTI CGS 15 .IFFCO PHULPUR PHASE- II COMMISSIONED PHASE- II YET TO COMMISSIONED COIS network diagram for NR (64Kbps) KLK HW SRE DDN JAT CDG PTK MB MTC UMB GZB LKO JUC ASR BE DLI SSB DKZ BSB DEE HSQ NDLS FZR BTI HNZM TKD HQ 12 08 Existing FOIS Location BSNL RLY Organizational setup Estimates of FOIS, ICMS, CMS, COA & Webenabled Claims : Central setup - Gazetted Designation Scale Estimate Operated Remarks CAO 22400-24500 1 1 CPM 18400-22400 3 3 1 post operated in Rly Bd Dy.FA&CAO 18400-22400 2 2 1 post downgraded to SAFA Dy CPM 14300-18300 6 6 Dy.CSTE/Tele 14300-18300 1 1 SPM/COIS 10000-15200 6 2 Sr Accounts Officer 10000-15200 1 1 SSTE/Tele 10000-15200 1 1 NM cum Analyst 10000-15200 2 2 Datacom Manager 10000-15200 1 1 AMM 7500-12000 1 1 PS-I 7500-12000 1 1 downgraded to AFA Organizational setup Estimates of FOIS, ICMS, CMS, COA & Webenabled Claims : Central setup (non-gazetted) Designation Scale Estimate Operated SSE 7450-11500 2 2 Sr Inspector 7450-11500 17 6 Web Manager 7450-11500 1 SE 6500-10500 1 __ Jr Inspector 6500-10500 29 8 OS 6500-10500 1 1 PA 6500-10500 4 3 Sr Section Officer 6500-10500 2 2 Console operator 5500-9000 5 1 CA 5500-9000 4 2 Accts. Assistant 5000-8000 2 2 Head Clerk 5000-8000 3 2 Senior Clerk 4500-7000 4 2 Driver Grade I 4500-7000 1 1 Clerk 3050-4590 4 --- Console Operator 3050-4590 1 --- Helper Khalasi 2650-4000 7 3 Messenger/Khalasi 2550-3200 17 5 B/Khallasi 2550-3200 10 9 ---- Organizational Setup Estimates of FOIS, ICMS, CMS, COA & Webenabled Claims : Zonal setup SCR, CR, WR, NR, ER, SR, SER, NER & NFR Designation Grade Estimate Operated Dy COM/FOIS 12000-16500 9 9 Dy CNM/FOIS 12000-16500 9 9 STM/FOIS 10000-15200 8 8 Sr NM/FOIS 10000-15200 6 6 SSE 7450-11500 9 9 Sr Inspector 7450-11500 18 18 SE 6500-10500 9 9 Jr Inspector 6500-10500 39 30 PA 5500-9000 9 9 HC 5000-8000 4 4 B/Khallasi 2550-3200 18 18 Remarks Dy COM/ER working as Dy COM/Coaching, No Dy CNM on NR WCR, ECR, ECoR, SECR, SWR, NWR& NCR Dy COM/FOIS 12000-16500 7 7 Dy CNM/FOIS 12000-16500 3 3 Sr NM/FOIS 10000-15200 4 4 SSE 7450-11500 7 7 Sr Inspector 7450-11500 14 14 SE 6500-10500 7 7 Jr Inspector 6500-10500 29 22 PA 5500-9000 7 7 B/Khallasi 2550-3200 10 10 Dy COMs on ECoR, ECR working as Dy COM/G, No Dy COM on NCR, Dy COM/SECR looking after planning, SNM/NWR working as PS to CSTE Growth of IT projects in IR IR’s capital budget for IT is Rs. 273 crore in 2006-07 It is projected to increase to about Rs. 900 crore to Rs. 1200 crore by 2010 – 2011 To make this scale of operation possible, requirement of space and other facilities for CRIS and FOIS organization needs to be significantly increased Increase in strength of FOIS and space requirement Support space Training areas, central control room etc. Year Approx IT budget (Rs. Crore) FOIS manpower (total) Manpower based in HQ Bare seating space (sq m) 200607 300 264 140 420 420 210 1050 200708 360 317 160 480 480 240 1200 200809 450 396 200 600 600 300 1500 200910 540 475 240 720 720 360 1800 201011 650 572 290 870 870 435 2175 201112 800 704 360 1080 1080 540 2700 Total space requirement (sq m) Projected growth of manpower in CRIS 1200 Trainees 1100 Procurement staff 1000 Support staff 900 IT/HW 800 Help Desk 700 N/W 600 DBA 500 Implementers (full-time) 400 Developers 300 Managers 200 100 0 2006 2007 2008 2009 Year 2010 2011 CRIS location CRIS premises Required facilities for expansion Secure areas in red Restricted areas in orange Open access in green THANK YOU