prerrequisitos

Download Report

Transcript prerrequisitos

Comissió de Construcció
EFICIÈNCIA ENERGÈTICA ALS EDIFICIS:
CERTIFICACIONS EXISTENTS
Moderador:
Jordi Pedrerol
María Cortés
Francesc Bonvehí
Arquitecta
Enginyer Industrial
22 de setembre, 2010
CERTIFICACIÓN LEED
1. FUNCIONAMIENTO GLOBAL DE LA CERTIFIACION LEED.
2. PROCESO DE CERTIFICACION.
3. SISTEMAS DE CALIFICACION. RATING SYSTEMS.
4. CATEGORIAS Y CRÉDITOS.
5. REQUERIMIENTOS MÍNIMOS Y PRERREQUISITOS.
6. EJEMPLO PRÁCTICO. Centro de Proceso de Datos en Cerdanyola del Vallés.
Eficiència Energètica als Edificis: Certificacions existents
entidad encargada de:
Acreditación de
Profesionales
control en paralelo
elabora:
LEED
ONLINE
LEED
Certificación
de edificios
desarrolla:
Guías de
Referencia LEED
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
Sistema de
calificación LEED
PRERREQUISITOS
Programas
educativos
4Proceso de 5
Certificación6LEED
AREAS Y
CREDITOS
EJEMPLO
PRÁCTICO
REQUERIMIENTOS MÍNIMOS GLOBALES
TRAMITACION VIA INTERNET DE LA DOCUMENTACION
GBCI_ Green Building Certificaction Institute
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
Los REQUERIMIENTOS MÍNIMOS son:
•
El edificio tiene que cumplir con las leyes medioambientales.
•
Debe ser un edificio permanente.
•
Debe usar un límite de parcela razonable.
•
Debe cumplir con los requerimientos mínimos de tamaño. Al menos 93 m2.
•
Debe cumplir con los ratios de mínima ocupación. Al menos una persona en el edificio.
•
Debe comprometerse a compartir los datos de uso de energía y agua durante los próximos 5 años.
•
Debe cumplir con un mínimo de ocupación de la parcela. El área que ocupa el edificio no puede ser menor
que el 2% del área de la parcela.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
1º ¿Es LEED lo que necesito?
Las estrategias para una edificación sostenible deben ser consideradas desde las fases más tempranas de diseño basándose en el
análisis completo del ciclo de vida del edificio (Life Cycle Assessment), desde su concepción inicial al diseño, la construcción,
operación, remodelación o reforma y definitiva demolición.
2º Registro del Proyecto
El registro sirve como una declaración de la intención de certificación del edificio. Tanto los proyectos registrados como los certificados
son recogidos en la base de datos on-line de LEED. Una vez ha sido determinado el sistema de certificación y las tasas de registro
han sido abonadas, el proyecto será accesible de forma inmediata en LEED Online.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
3º Elaboración de la solicitud
Cada crédito y prerrequisito LEED tiene una única serie de documentos requeridos que deben ser completados como parte del proceso
de solicitud. Durante el proceso de preparación, el equipo de proyecto selecciona los créditos que se han decidido alcanzar y que han
sido asignados a un miembro del equipo.
4º Presentar la Solicitud
Solo el administrador de proyecto LEED tiene la capacidad de presentar una solicitud para revisión. Para iniciar esta fase debe
presentar una solicitud completa via LEED Online. Los requisitos para conseguirlo varían de acuerdo con el tipo de certificación a
realizar (New Construction, Core & Shell, etc).
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
5º Revisión y Evaluación de la Solicitud
Una vez recibida la solicitud de certificación completa comienza el proceso de revisión y evaluación de la misma. Este proceso de
revisión difiere sustancialmente según el tipo de certificación que estemos evaluando.
6º Certificación
La Certificación es el paso final del proceso de revisión, una vez se ha completado la revisión de la solicitud, el equipo de proyecto
puede bien aceptar, bien apelar la decisión final. Aquellos proyectos certificados LEED:
•Recibirán un certificado de reconocimiento oficial.
•Recibirán la información necesaria sobre como solicitar la placa LEED, certificados, posible reportaje fotográfico y publicidad.
•Puede ser incluida en el directorio Online de los proyectos certificados y registrados.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
PRERREQUISITOS
4Proceso de 5
Certificación6LEED
AREAS Y
CREDITOS
EJEMPLO
PRÁCTICO
NEW CONSTRUCTION. LEED para nuevas construcciones y rehabilitaciones integrales.
EXISTING BUILDINGS: OPERATION & MAINTENANCE.
LEED para edificios existentes: Funcionamiento y
mantenimiento.
COMMERCIAL INTERIORS. LEED para locales de edificios comerciales.
CORE & SHELL. LEED para núcleo y envolvente.
SCHOOLS. LEED para escuelas.
NEIGHBORHOOD DEVELOPMENT. LEED para desarrollo de comunidades.
RETAIL. ( IN PILOT). LEED para establecimientos comerciales.
HEALTHCARE
( UNDER DEVELOPMENT) LEED para edificios destinados a asistencia sanitaria.
HOMES ( IN PILOT) LEED para viviendas.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
La Certificación LEED consiste en un sistema de calificación que valora las decisiones, estrategias y actuaciones
concretas adoptadas en cinco áreas determinadas:
SS_Sostenibilidad del emplazamiento
WE_Uso eficiente del agua
EA_Eficiencia energética y empleo de energías renovables
MR_Conservación de los materiales y recursos naturales
IEQ_Calidad del ambiente interior
Adicionalmente se valoran:
ID_Uso de prácticas y estrategias y tecnologías innovadoras
PR_Potenciación de estrategias prioritarias en cada región.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
LEED asigna un total de 100 puntos a las 5 categorías principales. Se reparten de la siguiente manera:
Sostenibilidad del emplazamiento………………………………….
26
Uso eficiente del agua…………………………………………………
14
Eficiencia energética y empleo de energías renovables………….
35
Conservación de los materiales y recursos naturales....................
10
Calidad del ambiente interior………………………………………….
15
LEED asigna 10 Puntos extra a estas categorías:
1
Uso de prácticas y estrategias y tecnologías innovadoras…………………….
6
Potenciación de estrategias prioritarias en cada región.................................
4
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
LEED 2009 for New Construction and Major Renovation
SOSTENIBILIDAD
DEL
EMPLAZAMIENTO
Project
Scorecard
Project Name: CENTRO PROCESO DE DATOS 1 - PC 01 06
Project Address: Parque científico y Tecnológico en Cerdanyola del Vallès
Yes
?
No
16
8
2 SUSTAINABLE SITES
Y
1
5
6
1
3
2
1
1
1
1
1
1
Yes
?
4
6
Y
4
Prereq 1
Credit 1
Credit 2
1 Credit 3
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5.1
1 Credit 5.2
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8
26 Points
Construction Activity Pollution Prevention
Site Selection
Development Density and Community Connectivity
Brownfield Redevelopment
Alternative Transportation - Public Transportation Access
Alternative Transportation - Bicycle Storage and Changing Rooms
Alternative Transportation - Low-Emitting and Fuel-Efficient Vehicles
Alternative Transportation - Parking Capacity
Site Development - Protect or Restore Habitat
Site Development - Maximize Open Space
Stormwater Design - Quantity Control
Stormwater Design - Quality Control
Heat Island Effect - Nonroof
Heat Island Effect - Roof
Light Pollution Reduction
Required
1
5
1
6
1
3
2
1
1
1
1
1
1
1
No
WATER EFFICIENCY
10 Points
Water Use Reduction
Prereq 1
Water Efficient
Landscaping
Credit 1FUNCIONAMIENTO
PROCESO
CERTIFICACION
GLOBAL
2 Reduce by 50%
1
2
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
4
Required
2 to 4
EJEMPLO
PRÁCTICO
2
2
1
1
1
2
1
1
1
1
1
1
1
Credit 4.4 Alternative Transportation - Parking Capacity
1
Credit 5.1 Site Development - Protect or Restore Habitat
1 EFICIENTE
Credit 5.2 SiteDEL
Development
USO
AGUA- Maximize Open Space
1
Credit 6.1 Stormwater Design - Quantity Control
1
Credit 6.2 Stormwater Design - Quality Control
Credit 7.1 Heat Island Effect - Nonroof
Credit 7.2 Heat Island Effect - Roof
Light Pollution Reduction
Credit 8
Yes
?
4
6
Y
4
No
WATER EFFICIENCY
Prereq 1
Credit 1
2
4
Credit 2
Credit 3
1
10 Points
4
Required
2 to 4
2
4
2
2 to 4
2
3
4
Water Use Reduction
Water Efficient Landscaping
2 Reduce by 50%
4 No Potable Water Use or Irrigation
Innovative Wastewater Technologies
Water Use Reduction
Reduce by 30%
Reduce by 35%
4 Reduce by 40%
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
5
Y
Y
Y
2
3
Yes
Improve by 18% for New Buildings or 14% for Existing Building Renovations
Improve by 20% for New Buildings or 16% for Existing Building Renovations
Improve by 22% for New Buildings or 18% for Existing Building Renovations
ENERGÍA Y ATMOSFERA
Improve by 24% for New Buildings or 20% for Existing Building Renovations
Improve by 26% for New Buildings or 22% for Existing Building Renovations
Improve by 28% for New Buildings or 24% for Existing Building Renovations
21 9 ENERGY & ATMOSPHERE
Improve by 30% for New Buildings or 26% for Existing Building Renovations
Improve by 32% for New Buildings or 28% for Existing Building Renovations
Fundamental
Building
Prereq 1
ImproveCommissioning
by 34% for Newof
Buildings
orEnergy
30% forSystems
Existing Building Renovations
Minimum
Energy
Prereq 2
Improve
byPerformance
36% for New Buildings or 32% for Existing Building Renovations
Fundamental
Prereq 3
ImproveRefrigerant
by 38% for Management
New Buildings or 34% for Existing Building Renovations
Optimize
Energy
19
Credit 1
Improve
byPerformance
40% for New Buildings or 36% for Existing Building Renovations
Improve
Improve by
by 12%
42% for
for New
New Buildings
Buildings or
or 8%
38%forforExisting
ExistingBuilding
BuildingRenovations
Renovations
Improve
Improve by
by 14%
44% for
for New
New Buildings
Buildings or
or 10%
40% for
for Existing
Existing Building
Building Renovations
Renovations
Improve
Improve by
by 16%
46% for
for New
New Buildings
Buildings or
or 12%
42% for
for Existing
Existing Building
Building Renovations
Renovations
Improve
forfor
Existing
Building
Renovations
Improve by
by 18%
48%+forforNew
NewBuildings
Buildingsoror14%
44%+
Existing
Building
Renovations
by 20%
for New Buildings or 16% for Existing Building Renovations
On-SiteImprove
Renewable
Energy
7 Credit 2
Improve
by 22%Energy
for New Buildings or 18% for Existing Building Renovations
1% Renewable
Improve
by 24%Energy
for New Buildings or 20% for Existing Building Renovations
3% Renewable
Improve
by 26%Energy
for New Buildings or 22% for Existing Building Renovations
5% Renewable
Improve
by 28%Energy
for New Buildings or 24% for Existing Building Renovations
7% Renewable
Improve
by 30%Energy
for New Buildings or 26% for Existing Building Renovations
9% Renewable
Improve
by 32% for
New Buildings or 28% for Existing Building Renovations
11% Renewable
Energy
Improve
by 34% for
New Buildings or 30% for Existing Building Renovations
13% Renewable
Energy
Improve
by 36% for New Buildings or 32% for Existing Building Renovations
Enhanced
Commissioning
2
Credit 3
Improve
by 38% Management
for New Buildings or 34% for Existing Building Renovations
Enhanced
Refrigerant
Credit 4
Improveand
by 40%
for New Buildings or 36% for Existing Building Renovations
Measurement
Verification
Credit 5
Improve by 42% for New Buildings or 38% for Existing Building Renovations
Green Power
2 Credit 6
?
No
Improve by 44% for New Buildings or 40% for Existing Building Renovations
Improve by 46% for New Buildings or 42% for Existing Building Renovations
PRERREQUISITOS
RATING
PROCESO
Y
FUNCIONAMIENTO Improve
by 48%+ for New
Buildings or 44%+ AREAS
for Existing
Building Renovations
SYSTEMS
CERTIFICACION
CREDITOS
GLOBAL
On-Site Renewable Energy
7 Credit 2
1
2
3
4
5
6
4
5
6
7
8
9
35
10 Points
11
Required
12
Required
13
Required
14
1 to 15
19
161
172
183
194
1 to 75
16
27
38
49
105
116
127
132
142
153
162
17
18
EJEMPLO 19
PRÁCTICO
1 to 7
MATERIALES Y RECURSOS
3
2
Y
9 MATERIALS & RESOURCES
Prereq 1
3 Credit 1.1
2
1 Credit 1.2
Credit 2
2 Credit 3
2 Credit 4
2
Credit 5
1
1 Credit 6
Credit 7
Yes
?
14 Points
Storage and Collection of Recyclables
Building Reuse - Maintain Existing Walls, Floors and Roof
Reuse 55%
Reuse 75%
Reuse 95%
Building Reuse - Maintain Interior Nonstructural Elements
Construction Waste Management
50% Recycled or Salvaged
75% Recycled or Salvaged
Materials Reuse
Reuse 5%
Reuse 10%
Recycled Content
10% of Content
20% of Content
Regional Materials
1 10% of Materials
2 20% of Materials
Rapidly Renewable Materials
Certified Wood
Required
1 to 3
1
2
3
1
1 to 2
1
2
1 to 2
1
2
1 to 2
1
2
1 to 2
1
2
1
1
No
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
CALIDAD DEL AMBIENTE INTERIOR
11
3
Y
Y
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Yes
?
1 INDOOR ENVIRONMENTAL QUALITY
Prereq 1
Prereq 2
Credit 1
Credit 2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5
Credit 6.1
1 Credit 6.2
Credit 7.1
Credit 7.2
Credit 8.1
Credit 8.2
15 Points
Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction Indoor Air Quality Management Plan - During Construction
Construction Indoor Air Quality Management Plan - Before Occupancy
Low-Emitting Materials - Adhesives and Sealants
Low-Emitting Materials - Paints and Coatings
Low-Emitting Materials - Flooring Systems
Low-Emitting Materials - Composite Wood and Agrifiber Products
Indoor Chemical and Pollutant Source Control
Controllability of Systems - Lighting
Controllability of Systems - Thermal Comfort
Thermal Comfort - Design
Thermal Comfort - Verification
Daylight and Views - Daylight
Daylight and Views - Views
Required
Required
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
No
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
INNOVACIÓN EN EL DISEÑO
1
INNOVATION IN DESIGN
5
Innovation in Design
Innovation or Exemplary Performance
5
INNOVATION IN Innovation
DESIGN or Exemplary Performance
Innovation or Exemplary Performance
Innovation
Innovation
in Design
5
Credit 1
Innovation or Exemplary Performance
®
Credit 2
Innovation orProfessional
Exemplary Performance
LEED Accredited
?
No
Innovation or Exemplary Performance
4 REGIONAL PRIORITY
Innovation
PRIORIDAD REGIONAL
Innovation
®
Regional
Priority Professional
4 Credit 12
LEED Accredited
?
No
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
4 REGIONAL PRIORITY
Regionally Defined Credit Achieved
Regionally
Regional
Priority Defined Credit Achieved
4 Credit 1
?
No
Regionally Defined Credit Achieved
45 25 PROJECT TOTALS
Regionally
Defined Credit
Achieved
(Certification
Estimates)
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
5
1
1
Yes
1
Yes
Yes
40
6 Points
Yes
?
40
45
1 to 5
1
61
1
1 to 51
1
1
1
41
1
1 to 41
1
41
1
1 to 41
1
1101
1
1
Credit 1
Points
Points
Points
Points
No
25 PROJECT TOTALS (Certification Estimates)
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
110 Points
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
………………...……..............LEED PLATINO
Desde 80 Ptos.
….…………….……………..……LEED ORO
60-79 Ptos.
….…………………………….…LEED PLATA
50-59 Ptos.
….……............................LEED CERTIFICADO
40-49 Ptos.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
Los PRERREQUISITOS son condición sine qua non para lograr la certificación :
SS_ Pr1
PREVENCIÓN DE LA CONTAMINACIÓN EN OBRA
WE_ Pr1
REDUCCION DEL USO DEL AGUA EN EL EDIFICIO
EA_ Pr1
RECEPCIÓN DE SISTEMAS ENERGÉTICOS
EA_ Pr2
EA_
MÍNIMA EFICIENCIA ENERGÉTICA
MÍNIMA
EA_ Pr3
GESTIÓN DE REFRIGERANTES
MR_ Pr1
RECOGIDA Y ALMACENAMIENTO DE MATERIALES RECICLABLES
IEQ_ Pr1
MÍNIMA CALIDAD DEL AMBIENTE INTERIOR
IEQ_ Pr2
CONTROL DEL HUMO DE TABACO
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
CENTRO DE PROCESO DE DATOS
EA PREREQUISITE 2 Mínima eficiencia energética.
Ahorro de un 10% mínimo con respecto al edificio base.
EA CREDIT 1. Optimizar el comportamiento energético
De 1 a 19 puntos en función del porcentaje de ahorro con
respecto al edificio base.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
EDIFICIO BASE
Modelización del edificio base de acuerdo al apartado G de la
ANSI/ASHRAE/IESNA Standard 90.1-2007.
PROGRAMA DE SIMULACION
•Minimum hours per year.
U.S DEPARTMENT OF ENERGY
www.eere.doe.gov
• Hourly variations.
•Thermal mass effects.
• Number of thermal zones..
• Doe-2, Blast, EnergyPlus
• Equipment capacity and efficiency correction curves.
• eQuest, EnergyGauge, Hap, Trace 700, Energy-10
• Economizers.
• Baseline building design characteristics.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
MODELADO DEL EDIFICIO REAL

coherente con los documentos de diseño

clasificación de los espacios.

mismos usos y horarios

donde exista ventilación, funcionará el tiempo que esté ocupada la estancia. El sistema de climatización funcionará
de forma ininterrumpida.

se contemplarán elementos de sombra permanente. No se modelarán sistema de sombra manuales pero sí los
automáticos.

se contemplarán los sistemas de control de iluminación.

se agruparán los espacios por sistemas de climatización/ventilación homogéneos.

donde no se han especificado o diseñado sistemas de climatización, se modela uno igual al edificio base.

la modelización de sistema de agua caliente sanitaria es coherente con los documentos de diseño.

las cargas eléctricas que no se puedan contemplar con el programa de simulación se tendrán que contemplar de
alguna forma, según la naturaleza de la misma, de forma consistente.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
MODELADO DEL EDIFICIO BASE

gasto energético que se utilizará para conocer el ahorro frente al real será el promedio del consumo del edificio
base variando su posición 0º, 90º, 180º y 270º.

El área de las ventanas será como máximo el 40% de la superficie total de la fachada que la contemple. Las
ventanas estarán enrasadas a fachada, es decir sin retranqueos de ningún tipo.

Las características de los cerramientos en cuanto reflectancia, emitancia se adecuarán a la norma.

Se modelarán sistemas de climatización según uso y superficie del edificio de acuerdo a la ASHRAE/IESNA 90.12007. Las características, rendimientos y otros parámetros estarán de acuerdo a esta norma. Los sistemas de
calefacción tienen que estar mayorados un 25% y los de climatización un 15%.

El sistema de agua caliente utilizará la misma energía que el edificio real, el rendimiento de este será de acuerdo a
las especificaciones de la norma ASHRAE/IESNA 90.1-2007 para estos sistemas.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
ALGUNOS RESULTADOS_ EDIFICIO REAL
• el gran gasto energético es la demanda de energía eléctrica
proveniente de los sistemas de climatización.
• los picos de consumo están en torno a los 12,75Mw.
• el aparaente bajón en Febrero se debe al numero de días del mes.
consumo energético según la naturaleza del combustible
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
Experiencia
LEED6Idom
PRERREQUISITOS
EJEMPLO
PRÁCTICO
ALGUNOS RESULTADOS_ EDIFICIO BASE
posición real
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
giro de 90º
RATING
SYSTEMS
4
AREAS Y
CREDITOS
giro de 180º
giro de 270º.
5
Experiencia
LEED6Idom
PRERREQUISITOS
EJEMPLO
PRÁCTICO
COMPARATIVA_ EDIFICIO BASE-EDIFICIO REAL
12000
10000
8000
6000
4000
2000
Ju
li o
Ag
os
Se
to
pt
ie
m
br
e
O
ct
ub
re
N
ov
ie
m
br
e
D
ic
ie
m
br
e
Ju
ni
o
M
ay
o
Ab
ri l
0
En
er
o
Fe
br
er
o
M
ar
zo
Potencia Eléctrica [MWh]
CONSUMO ENERGETICO (Comparativa de Modelos)
Meses
Modelo ASHRAE
Modelo Real
EA PREREQUISITE 2 Mínima eficiencia energética.
CUMPLIDO
EA CREDIT 1. Optimizar el comportamiento energético.
3 PUNTOS SOBRE 19 PUNTOS POSIBLES.
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
1
FUNCIONAMIENTO
GLOBAL
2
PROCESO
CERTIFICACION
3
RATING
SYSTEMS
4
AREAS Y
CREDITOS
5
PRERREQUISITOS
6
EJEMPLO
PRÁCTICO
GRACIES
Eficiència Energètica als Edificis: Certificacions existents