MT Continuum Capabilities Update

Download Report

Transcript MT Continuum Capabilities Update

MT Continuum Status

Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator 4 February 2014

• • • •

Overview

MT Continuum overview Application to other communities Project status Lessons learned for other NETC communities

Background

• • •

Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just in-time ILE-conformant Instructor Led (ILT) and Interactive Multimedia Instruction (IMI) segments delivered, tracked, and assessed through LMS AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms

• • • • • • • • •

MT Continuum Team

SSP - Requirements Owners, Afloat Delivery System Contractor team – ILT development, IMI Storyboard development, SMEs NAWCTSD / AIM team - CPM/LO Module support NUWC – LMS (Seaware) NUWC – MTC Lead System integrator LSI, Inc. – ISD and IMI design/development Chenega Logistics – CM/QA agent for SSP SLC – ETC CCA for MT curriculum Fleet – SMEs/afloat training management

• • • •

Project Status

Plan, Analyze & Design Phases Completed

– –

Delivery Method Analysis Process still needed Scientific/Justifiable/Repeatable

Development fully underway. Development effort is at the halfway point Assessment, Performance Testing (NAVEDTRA 132) Large emphases on Implementation, Evaluation and Maintenance

Versioning, LMS interface Ongoing integration of CPM/LO Module, IMI toolset, PC simulation toolset, and LMS for planning, analysis, design, development, implementation, evaluation, and maintenance of blended content

MT Continuum Technical & Schedule Integration

• •

MTC development spans from JDTAs to the delivery and maintenance of training and test assessment material to students afloat and ashore

MTC Lead System Integrator Coordinates technical and schedule activities between and among developers, relative to the training and assessment delivery and maintenance goals of the MTC

Development functions /roles include: MPAs, Courseware Developers, ISD, CPM & LO Module developers/maintainers, LMS developers, PPC and SLC relative to the goal of delivering

• • •

MT Continuum Components

Plan/Analyze

CPM (JDTA/TPP/TCCD) Design

CPM (COI)

LO Module (final design of ILT/preliminary design of IMI) Develop

– –

LO Module (complete for ILT and test items) Venus.net IMI toolset (complete for IMI and assessment Sections)

– –

VIPr (PC simulation scenarios for ILT and IMI) Content Packaging Tool (CPT) (Section level ILT/IMI/assessment integrated via per LMS Interface Specification)

MT Continuum Components

(contd)

• • •

Implement

– –

Training content includes assessment items Seaware LMS (ILT/IMI/assessment delivery and tracking) Evaluate

Seaware LMS (student testing /test item analysis) Maintain

LO Module/Venus.net (integrated surveillance/update of ILT/IMI/test items)

MT Continuum Integration Tasks

• • •

LMS Interfaces

Interface specification with LO Module and VIPr

NUWC Newport lead with inputs from PPC (Chenega Logistics), ISD/IMI developer (LSI), and AIM team (AIMEREON) Content Packaging Tool (CPT)

Ongoing development by LSI with support from NUWC Newport Seaware LMS team, PPC, and AIM team (AIMEREON) Classroom Control Software (CCS)

– –

Architectural approach in development by NUWC LMS team, supported by LSI, PPC, and AIM team (AIMEREON) CCS system and developer selection tbd

Required for MTC March 2015 Blended Training:

Course Packaging Tool, Enhancements to XLP and LMS, and AIM LO Module Interface 10

• • • • •

Application to Other Communities

Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development (NAVEDTRA 137) Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections including versioning Design of IMI lessons/sections as well as definition of new JDTA/LO Module versioning concepts Integration of PC Simulation toolset with LO Module

• • • •

Application to Other Communities

(contd)

Bi-directional interface between LO Module and IMI toolset for integrated IMI / assessment development / maintenance Development of ILT and IMI test items and output to IMI toolset for aggregation into LMS-delivered Lesson-level assessments Sections, including enhanced performance test item development LMS delivery and tracking of integrated ILT / IMI / assessment content Integrated surveillance and maintenance environment for blended (ILT/IMI/test item) SCORM NAVEDTRA 136 compliant learning content

Application to Other Communities

(contd)

Briefing of MT Continuum to ‘big Navy’

Training 2020 study group

OPNAV staff

Fleet Forces Command

• • •

Lessons Learned

JDTA Foundation. Getting this right cannot be over emphasized.

Maturity of Design Documents and Processes IMDP, Learning Objectives (ISD Considerations), Process Documents, Assessment Design, Time to Train Estimations, Delivery Method Analysis

– –

Early definition of detailed blended content structure and ILT/IMI delivery implementation Delivery interface specification ILT/electronic classroom delivery

Questions?