LINES - srldc

Download Report

Transcript LINES - srldc

PROJECTS IN THE
PIPELINE IN
SOUTHERN REGION
1
PROJECTS IN PROGRESS IN
SOUTHERN REGION







400 KV MADURAI-TRIVANDRUM LINE WITH
400 KV SS AT TRIVANDRUM
400 KV NELAMANGALA-MYSORE LINE
WITH 400 KV SUBSTATION AT MYSORE
400 KV KAIGA-NARENDRA LINE ALONG
WITH 400 KV SUB STATION AT NARENDRA
400 KV 2nd GOOTY-NELAMANGALA LINE
400 KV RAICHUR-GOOTY D/C QUAD LINE
400 KV RING MAIN AROUND BANGALORE
400 KV RING MAIN AROUND CHENNAI
2
PROJECTS IN SOUTHERN REGION







400 KV RAMAGUNDAM – HYDERABAD-GOOTYNELAMANGALA LINE: RS 390 CRORES
ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA:
WORTH Rs 770 CRORES
ENHANCEMENT OF CAPACITY OF TALCHER POLES BY
500MW (FROM 2000 MW TO 2500 MW FOR UTILISATION
DURING EMERGENCY ONLY): Rs 90 CRORES
SYSTEM AUGMENTATION SCHEMES : Rs 415 CRORES
KOODANKULAM NUCLEAR PLANT EVACUATION
SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs 1700
CRORES
ANOTHER HVDC LINK TO SR FROM ER/WR
SYSTEM EXPANSION SCHEMES WORTH Rs 1233 CRORES
3
NEW PROJECTS ON THE ANVIL
KAIGA 3 & 4 TRANSMISSION SYSTEM
LINES : 413 Kms
COST ESTIMATE : 512 CRORES
 MYSORE-KOZHIKODE D/C LINE
 LILO OF KOLAR-SRIPERUMBADUR
AT MELAKOTTAIYUR (40KM)
 NARENDRA-DAVANGERE D/C LINE
SUB-STATION : 2 Nos. New
 NEW 400/220KV SUBSTATION AT
KOZHIKODE & MELAKOTTAIYUR
 2ND 315MVA TRANSFORMER AT
HIRIYUR S/S.
 BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) &
HIRIYUR.
4
NEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION SYSTEM( 2000MW)
LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES

KUDANKULAM-TIRUNELVELI
2 X 400 KV D/C LINES WITH
QUAD (108 & 83 Km.)

TIRUNELVELI-UDUMALPET
D/C LINE WITH TWIN
MOOSE (300Km)
LILO OF BOTH CIRCUITS OF
MADURAI-TRIVANDRUM LINE
AT TIRUNELVELI ( 2 X 55 Km)
EDAMON-MUVATTUPUZHA
D/C LINE QUAD (150Km)




KARNATAKA
T N
KERALA
TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).
MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD
CONDUCTORS (90Km)
5
NEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION SYSTEM( 2000MW)
SUB-STATIONS

NEW 400/220KV SUBSTATIONS AT TIRUNELVELI,
MUVATTUPUZHA

AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE
TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S
SUPPLEMENTARY TRANSMISSION SYSTEM
 LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY
AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT
KARAIKUDI (TAMILNADU)
 LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA
400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT
HASSAN.(KARNATAKA)
6
NEW PROJECTS ON THE ANVIL
NLC-TS-II EXPANSION TRANSMISSION SYSTEM
LINES : 467 Km.


COST ESTIMATE : 721 CRORES
2 NOS. 400KV S/C LINES FROM
NEYVELI-TS-II (EXISTING)
TO NLC TS-II (EXPAN) (8 KM).
NEYVELI-PUGALUR D/C LINE
TN

PUGALUR-MADURAI D/C LINE

UDUMALPET-ARASUR D/C LINE

LILO OF NEYVELI-SRIPERUMBUDUR LINE AT PONDY.
SUB-STATION

NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR &
PONDICHERRY.
7
BANGALORE 400 KV RING MAIN(INTERIM)
FROM
GOOTY
KOLAR
NELAMANGALA
HOODY
400 KV RING MAIN
SOMANAHALLI
8
BANGALORE 400 KV RING MAIN(FINAL)
FROM
GOOTY
KOLAR
NELAMANGALA
HOODY
400 KV RING MAIN
SOMANAHALLI
9
CHENNAI RING MAIN
TO NELLORE
TO CHITOOR
ALMATHI
SRIPERUMBUDUR
TO KOLAR
MELKOTTAIYUR
10