Energy Efficient ICT at the University of Sheffield
Download
Report
Transcript Energy Efficient ICT at the University of Sheffield
Energy Efficient ICT at the
University of Sheffield
Chris Cartledge
Independent Consultant
[email protected]
With thanks to
The University of Sheffield
SusteIT
Practical Steps for ICT Electricty
Use Improvement
ICT Electricity Use Footprint
IT equipment, Measuring and Costing
The Electricity Bill
Purchasing
Data Centres
European Code of Conduct
ASHRAE 2008
PCs
Practical purchasing
University of Sheffield
ICT Electricity Use (2008)
More than
£1M/year
About 20%
Institution use
PCs dominate
Servers: over
30% (including
HPC &
departmental)
PCs
Servers
Network
Telephony
Printing
AV
University of Sheffield
Data Centres Electricity (2008)
Servers, Network,
PABX
Over 40% of ICT
use, £400,000 p/a
Including
departmental &
remote cabinets
Could be higher –
overheads
underestimated?
PCs
Data
Centres
Printing
AV
Measuring Power Use
Manufacturer's figures
Where they exist
Measure equipment
Instantaneously or
Over a period or better
Monitor continuously
Use meter readings
Remember aircon, UPS,
etc overheads
Electricity Cost
In 2008, electricity was 10p per unit (kilowatt
hour)
plus VAT (5%) and climate change levy?
has increased and is increasing, so now say 15p
Over a year of 365*24 = 8760 hours
About £1.80 per watt per year
Date centres
Measured air conditioning overhead at Sheffield is
1.8
Typical, and much lower than aircon CoP (earlier
IT Equipment Buying
Typically, it is blind to electricity consumption
The bill is somebody else's responsibility
Information not always easily available
Cost from configuration tool, but not electricity use
Lots of other complex issues: VMware, Wake on
LAN, Stable platform, etc...
Sheffield includes life cost of electricity in VFM
Purchasing Example
Sun X2200 HPC Server
~25% Power Saving worth £130 p/a
Working
Idle
Standby
Standard, 2PSU, 16*2GB
Standard, 1 PSU, 16*2GB
Standard, 1 PSU, 8*4GB
HE Processor, 1PSU, 8*4GB
0
50 100 150 200 250 300 350 400
Watt
Sheffield Data Centres
Two, conventional:
Dark - with the lights off!
Physical changes
Hot aisle – cold aisle arranged, with some aisle
containment
Redundant aircon units switched off
Power monitoring, using SNMP capable distribution
blocks, into Ganglia
Equipment changes
Virtualisation – PC, SPARC servers and storage
(NAS)
Code of Conduct for Data Centres
A European Action to Improve Energy
Efficiency
http://re.jrc.ec.europa.eu/energyefficiency/html/standby_initiative_data%20centers.htm
Best Practice Guidelines to enable change
About 120 good practices: covers all issues
Including on setting up a project to bring about
change
An excellent, readable, How To Do It guide
Unlikely to become compulsory
HEFCE mindful of University independence
EU Code of Conduct
Group Involvement
Establish a cross disciplinary change board
Consider impacts, ensure effective solution
Definition of standard IT hardware
M&E implications of new services
Audit existing equipment
optimise and consolidate where possible
Virtualisation
Temperature set point
Identify and deal with little used and unused
EU Code of Conduct
Some Top Rated Practices
Buy energy efficient IT devices
Use virtualised servers and storage
Switch off hardware for unused services
Virtualise little used services
Separate cold air from heated return air
Use free or economised cooling
Increase temperature set points
Desktop PCs
Monitors
LCDs much better than CRTs
Now power down automatically, by default
Desktop PCs
Powered down, when not in use
Thin client (Sunray) deployed where appropriate
Lifetime cost of electricity factored into purchase
decisions
Other issues – in particular maintaining a stable
platform
PCs
Information on energy consumption now better
EnergyStar Typical Energy consumption
available
A guide - good for office PCs, not 24 hour use
BUT PCs could/should be better!
In 2007 Sheffield identified Mac Mini as Best in
Class
Still is today: a genuine core 2 duo PC but not
feasible
No Windows license not a standard PC platform...
Apple Mac Mini vs PCs
Watts Off
Apple Mac mini, Z0H5
Dell OptiPlex XE, D01D001
HP TouchSmart 600
0.2
0.9
0.6
Watts
Sleep
1.3
2.3
3.4
ENERGY
STAR
TEC**
Requireme
nt
TEC
Actual vs TEC cost
(Adjusted (Measured
TEC
(14p per
Watts Idle for Config)
)
Target
unit)
8 181
45 216
52 216
31 17%
£4
162 75% £23
185 86% £26