ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS
Download
Report
Transcript ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS
ERTMS deployment experience in Turkey:
Mersin - Toprakkale and Gebze - Köseköy lines
Leone Fenzi
Istanbul, April 2nd 2014
1
Presentation Agenda
Ansaldo STS: About Us
ERTMS/ETCS: the System
Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects
Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects
Ansaldo STS Answers to Signalling Projects Challenges
2
Page 2
About us: Ansaldo STS History
Ansaldo STS: Over a century of innovation around the World, and continuing
Gio. Ansaldo e C.
Founded 1853
in Genoa, Italy
By Giovanni Ansaldo
Transferred to
Finmeccanica
In 1948
Ansaldo Transporti
(ATR)
Created in 1966
Page 3
Union Switch and
Signals (US&S)
Founded 1881
In USA
By George
Westinghouse
Company des
Signaux (CSEE)
Founded 1902
In France
By Fernand Cumont
and Baron d’Empain
Acquired by ATR
In 1988
Acquired by ATR
49% in 1989
100% in 1996
Ansaldo STS
Established 2006
Ansaldo Signal NV
Established 1996
3
About us: Ansaldo STS Business Lines
Ansaldo STS delivers a full range of Railway and Mass Transit Transportation
Solutions and Signalling Systems:
High Speed Lines
Freight Lines
Main and Suburban
Lines
Driverless
Metros
Page 4
Tramways and
Light Rails
Conventional
Metros
Security Systems
4
Presentation Agenda
Ansaldo STS: About Us
ERTMS/ETCS: the System
Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects
Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects
Ansaldo STS Answers to Signalling Projects Challenges
5
Page 5
The ERTMS/ETCS What, Why & How
ERTMS/ETCS enforced by the Law in Europe
…but enforced by the Market all around the World:
6
Page 6
ERTMS in Turkey: TCDD’s <<Vision 2023>>
Thanks to the economical and technical benefits granted by the Interoperability and
because of its flexibility, robustness and proven-in-use results, ERTMS/ETCS has been
chosen by TCDD as the signalling system to implement its growth plan
Source: TCDD Website
7
Page 7
Presentation Agenda
Ansaldo STS: About Us
ERTMS/ETCS: the System
Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects
Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects
Ansaldo STS Answers to Signalling Projects Challenges
8
Page 8
Ansaldo STS “Greenfield” ERTMS References
L1 and/or L2 Greenfield projects (brand new lines) – new Interlocking + ATP (incl. ERTMS)
Turkey: Gebze-Köseköy Line (ERTMS L1)
9
Page 9
Turkish Greenfield Lines – ERTMS/ETCS L1
Gebze-Köseköy Line – Length 56 km
Max Speed (with Level 1) 160 km/h
Signalling Scope of Work
Interlocking “Multistation”
Page 10
Traffic Control System (1 CTC)
ERTMS Level 1
Automatic Block
Audio Frequency Track Circuits
Point machines
Power supply (On Line double conversion UPS)
10
Turkish Greenfield Lines – ERTMS/ETCS L1
Gebze-Köseköy Line – Project Status
Interlocking/ETCS Engineering/Basic Design:
completed
Hardware Design:
completed
Materials / Installation: ≈ 25% done
Commissioning:
April/May 2014
RAMS / Verification activities:
April/May 2014
11
Page 11
Presentation Agenda
Ansaldo STS: About Us
ERTMS/ETCS: the System
Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects
Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects
Ansaldo STS Answers to Signalling Projects Challenges
12
Page 12
Ansaldo STS “Brownfield” ERTMS References
L1 Brownfield projects (existing lines) – Interlocking revamping and ETCS to be added
Turkey: Mersin-Toprakkale & Boğazköprü-Yenice Lines
13
Page 13
Turkish “Brownfield” ERTMS/ETCS Lines
Boğazköprü-Yenice and Mersin-Toprakkale – length 430 km
Single track: Bogazkopru-Yenice & Section Adana-Toprakkale = 352 km
Double track: Mersin-Adana = 78 km
Total number of stations = 33
Signalling Scope of Work
Twelve Interlocking “Multistation” (each one controlling up to
three stations)
Traffic Control System (Two Central Posts: Kayseri & Adana)
ERTMS Level 1
Automatic Block
Level Crossings
Line track circuit audio frequency
Point machines
Power supply with two Uninterrupted Power Supply (UPS)
14
Page 14
Turkish “Brownfield” ERTMS/ETCS Lines
Boğazköprü-Yenice and Mersin-Toprakkale – Project Status
Loop extension works completed at 97%
“Precommissioning and Commissioning” activities performed for the Interlocking 09 (Mersin,
Tirmil and Taskent)
“Precommissioning activities” almost completed on Interlocking 08 (Durak; Belemedic;
Hacikiri)
Design delivered to Customer; Installation ongoing
Page 15
SIGNALLING and TELECOMMUNICATION
BOĞAZKÖPRÜ - YENİCE & MERSİN - TOPRAKKALE
Project Name
Work Item Description
Total Quantity
Unit
Current
Quantity
Remaining
Quantity
Physical
Progress
Detail Design
12,00
Interlocking
12
0
100,00%
Technical Buildings
25,00
Nr
19,00
6,00
76,00%
Cables
6.252,60
km
5.088,00
1.164,60
81,37%
Cable Ducts
511,99
km
424,48
87,51
82,91%
Signals
685,00
set
462,00
223,00
67,45%
Installation of Track-circuit
1.859,00
set
806,00
1.053,00
43,36%
Installation of Indoor equipment in the
technical building
33,00
set
15,00
18,00
45,45%
Installation of point machines
337,00
nr
325,00
12,00
96,44%
Level crossings
124,00
nr
51,00
73,00
41,13%
CTC
2,00
nr
0,50
1,50
25,00%
Interlocking
12,00
set
1,00
11,00
8,33%
Balises
3.502,00
nr
0,00
3.502,00
0,00%
Onboard Equipment
23,00
nr
10,00
13,00
43,48%
Telephone System
33,00
set
0,00
33,00
0,00%
15
Presentation Agenda
Ansaldo STS: About Us
ERTMS/ETCS: the System
Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects
Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects
Ansaldo STS Answers to Signalling Projects Challenges
16
Page 16
Product Upgrade “WSP” Platform
“WSP”: Wayside Standard Platform – ASTS new Platform for Infrastructure Applications:
Interlocking
ERTMS
CBTC
Features:
New WSP Platform SIL 4 is derived from already existing 2x2oo2 vital platform already in revenue service
in the biggest Italian Electronic Interlocking (Pisa Central Station)
WSP satisfies high performances functional and availability requirements:
Better Performances
Higher Connectivity
Higher Reliability
Higher Maintainability
WSP allows high Flexibility in signalling application (Interlocking centralized/distributed / Gateway / Radio
Block Centre / Zone Controller)
WSP embeds New Field Device Controllers: flexible, less space/power consuming, cheaper
17
Page 17
ASTS Scalable Approach to Testing
Completely
Target
Test
of IXL
Fieldconnected
complete
simulated
Device
realconnections
System
to
environment
simulated environment
18
Page 18
Ansaldo STS: ready for TCDD’s <<Vision 2023>>
Source: TCDD Website
19
Page 19
Thank You for your kind attention
www.ansaldo-sts.com