ANGUS BIOFUELS

  

UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS

FUEL SUPPLIERS

   

BILL WATSON TEL: 01307 466699 FAX: 01307 462278 E-MAIL:- [email protected]

ANGUS BIOFUELS

MAIN BUSINESS ACTIVITIES

FORESTRY OWNER

WOODCHIP PRODUCER

BOILER INSTALLATION

HEAT SUPPLY CONTRACTS

BIOMASS PLANT

SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR

OPENED BY JOHN SWINNEY

PROJECT COSTS: £1.2 MILLION

ISSUES IN SETTING UP PLANT

       

LOCATION TO TIMBER SUPPLY LOCATION TO BOILERS CAPITAL COST GRANT ASSISTED BY SSBS QUALITY OF CHIP MOISTURE CONTENT OF CHIP SIZE OF CHIP HANDLING OF WOOD FROM FOREST TO BOILER

BIOMASS PRODUCTS

WOOD CHIPS – WET - ABOVE 30% M.C.

WOOD CHIPS – DRY – BELOW 25% M.C.

WOODCHIPS DRIED BY – NATURAL DRYING ARTIFICIAL DRYING

CHIPPERS

HEIZOHACK 400 SCREEN CHIPPER

JUNKKARI 500 DRUM CHIPPER

JENZ 561 CHIPPER

STORAGE OF TIMBER/CHIP

AIR DRYING = 5000 TONNES

AT ROADSIDE = 3000 TONNES

DRY CHIP = 2000 TONNES

WOODCHIP OUTPUT

MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT TYPICAL HOUSE WILL USE APPROX 100 kWhrs TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs

DELIVERY OF WOODCHIP

 ARTICULATED LORRY  HI-LIFT TRAILER  BULK TRAILER  BLOWER TRAILER  BULK BAGS

BOILER INSTALLATIONS

CHOICE BETWEEN – WOODCHIP OR WOOD PELLET DRY WOODCHIP – LESS THAN 25% MC

GENERALLY LARGER INSTALLATIONS

  

LARGER FUEL STORAGE FACILITIES LOWER FUEL COSTS THAN PELLETS AT PRESENT. AROUND 3.5p/kWhr LONG SHELF LIFE

WET WOODCHIP- ABOVE 30% M.C.

VERY LARGE BOILERS & POWER STATIONS

 

MORE DELIVERIES PER ANNUM MORE CONTAMINATION

 

SHORT SHELF LIFE DUE TO COMPOSTING & MOULDING PRICE SIMILAR TO DRY WOODCHIP

WOOD PELLETS

    

IDEAL FOR SMALLER BOILER INSTALLATIONS LESS BULKY MORE EXPENSIVE – AROUND 4.5p/kWhr CAN BREAK DOWN IF GET DAMP OR WET LIMITED SHELF LIFE

BOILERS INSTALLED – 10KW TO 600KW

      

BINDER FROELING VETO CALIMAX JANFIRE SONNYS GILLIES – Under consideration

CHOOSING A BOILER

      

WHAT SIZE DO I NEED AND WHEN DO I NEED HEAT?

HOW SOPHISTICATED DO I NEED?

FUEL STORAGE AND DELIVERY?

BACK-UP SERVICE?

GO AND LOOK AT INSTALLED EXAMPLES ASK QUESTIONS DOES IT COMPLY WITH THE LOCAL ENVIRONMENTAL CRITERIA?

HEAT SUPPLY CONTRACTS FACTORS TO CONSIDER

COST OF BOILER AND INFRASTRUCTURE

 

PRICE FOR FUEL COST OF DELIVERY

   

COST OF MAINTENANCE COST OF CLEANING/DE-ASHING SINKING FUND PROFIT

THANK YOU.