Promote Eastern Indonesia RENCANA, STRATEGI IMPLEMENTASI & ROADMAP PEMBANGUNAN PELABUHAN DI KAWASAN PT PELINDO IV (PERSERO) DISAMPAIKAN PADA : FOCUS GROUP DISCUSSION DALAM RANGKA RIPN 2011-2030 PT PELABUHAN INDONESIA IV (PERSERO) JL. SOEKARNO NO. 1 MAKASSAR JAKARTA, 9 AGUSTUS 2011 1 DAFTAR ISI 1. 2. 3 4 PT PELINDO IV 1.1. LOKASI & WILAYAH 1.2. KARAKTERISTIK HINTERLAND 1.3. TRAFIK EKSISTING KEBIJAKAN & STRATEGI 2.1 BISNIS & OPERASIONAL 2.2. PENGEMBANGAN & PEMBANGUNAN 2.3. PENDANAAN INVESTASI LAY-OUT PELABUHAN-PELABUHAN PT. PELINDO IV 3.1. LAY-OUT EKSISTING DAN MASTERPLAN 2025/2030 3.2. RENCANA JANGKA PENDEK THN. 2011-2015 3.3. RENCANA JANGKA MENENGAH THN. 2011 – 2020 TABEL DUKUNGAN INFRASTRUKTUR LAINNYA DAN KESIAPAN PERENCANAAN PEMBANGUNAN 2 1. PT PELINDO IV 1.1. LOKASI & WILAYAH KERJA PT PELINDO IV Nunukan Tarakan Manado Toli Toli Tg. Redeb Ternate Sengata Bontang Manokwari Donggala Gorontalo Bitung Samarinda Sorong Palaran Pantoloan Balikpapan Biak Fakfak Kendari Parepare Ambon Makassar Bandanaira Jayapura Merauke : Pelabuhan/Cabang : Pelabuhan/Kawasan : Terminal Petikemas : Unit Pelayanan Kepelabuhanan (UPK) 3 1. 2. 3. 4. PROVINSI KALIMANTAN TIMUR 1) CAB. SAMARINDA 2) CAB. BALIKPAPAN 3) CAB. TARAKAN 4) CAB. NUNUKAN 5) UPK BONTANG & LHOK TUAN 6) UPK SENGATA 7) UPK TG. REDEB 8) KAWASAN KAMPUNG BARU PROVINSI SULAWESI UTARA 9) CAB. BITUNG 10) TERMINAL PETIKEMAS BITUNG 11) CAB. MANADO PROVINSI GORONTALO 12) GORONTALO PROVINSI SULAWESI TENGAH 13) PANTOLOAN 14) TOLI TOLI 15) KAWASAN DONGGALA 5. PROVINSI SULAWESI SELATAN 16) CAB. MAKASSAR 17) TERMINAL PETIKEMAS MAKASSAR 18) CAB. PAREPARE 19) KAWASAN PAOTERE 6. PROVINSI SULAWESI TENGGARA 20) KENDARI 7. PROVINSI MALUKU 21) AMBON 22) KAWASAN BANDA NAIRA 8. PROVINSI MALUKU UTARA 23) TERNATE 9. PROVINSI PAPUA BARAT 24) SORONG 25) MANOKWARI 26) FAKFAK 10. PROVINSI PAPUA 27) JAYAPURA 28) BIAK 29) MERAUKE 1.2. KARAKTERISTIK HINTERLAND 1.2.1 PT PELABUHAN INDONESIA IV MEMILIKI WILAYAH KERJA 45% WILAYAH REPUBLIK INDONESIA 1.2.2 JUMLAH PENDUDUK 11% : ± 26,14 JUTA JIWA DARI 237,6 JUTA PENDUDUK INDONESIA 1.2.3 BERADA DI 11 PROPINSI : KALTIM, SULUT, GORONTALO, SULTENG, SULBAR, SULTRA, SULSEL, MALUKU, MALUKU UTARA, PAPUA & PAPUA BARAT 1.2.4 PERGERAKAN CARGO PT PELABUHAN INDONDESIA IV (PERSERO): → IMBALANCE CARGO (BARANG BONGKAR LEBIH BANYAK DARIPADA BARANG MUAT) → 3,9% (18,3 JUTA TON) DARI TOTAL CARGO DI INDONESIA (465,6 JUTA TON) → 8,73% DARI TOTAL CARGO DI KTI (209,4 JUTA TON) → 7% DARI TOTAL CARGO DI PT PELINDO I,II,III,IV 1.2.5 BIAYA INVESTASI 2 – 3 KALI DIBANDING KAWASAN BARAT INDONESIA 5 TRAFIK KEGIATAN DI PELABUHAN 1.2. ARUS KAPAL 2006 – 2010 CORPORATE ARUS BARANG 2006-2010 CORPORATE 300,000,000 250,000,000 TON GT 200,000,000 150,000,000 100,000,000 50,000,000 - 2006 2007 2008 2009 2010 INTERNASIONAL 92,757,830 93,236,706 104,657,172 117,545,957 141,866,136 DOMESTIK 105,586,704 96,120,731 98,474,450 110,363,098 118,244,646 TOTAL 198,344,534 189,357,437 203,131,622 227,909,055 260,110,782 70,000,000 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 - 2006 2007 2008 2009 2010 IMPORT 6,489,222 8,329,779 6,255,917 7,570,513 4,473,131 EXPORT 27,458,573 21,160,888 37,362,998 48,805,170 65,763,279 BONGKAR 21,919,718 23,292,103 24,710,299 25,901,635 24,423,146 MUAT 21,655,571 19,280,230 16,406,077 16,640,636 16,885,960 ARUS PENUMPANG 2006-2010 CORPORATE ARUS PETIKEMAS 2006-2010 CORPORATE 7,000,000 1,400,000 6,000,000 1,200,000 5,000,000 ORANG TEUS 1,000,000 800,000 3,000,000 600,000 2,000,000 400,000 1,000,000 - 200,000 6 4,000,000 TEUS 2006 2007 2008 2009 2010 756,189 878,257 1,031,450 1,108,873 1,199,231 2006 INTERNASIONAL 376,880 DOMESTIK 5,593,677 TOTAL 5,970,557 2007 417,951 5,589,568 6,007,519 2008 329,256 5,649,113 5,978,369 2009 211,869 5,739,174 5,951,043 2010 204,025 5,186,797 5,390,822 2. KEBIJAKAN & STRATEGI 2.1. BISNIS DAN OPERASIONAL 2.1.1. RESTRUKTURISASI CABANG-CABANG DENGAN ORIENTASI CUSTOMER 2.1.2. STANDARISASI KINERJA PELAYANAN DENGAN SERVICE LEVEL GUARANTEE/SERVICE LEVEL AGREEMENT 2.1.3.PENETRASI PERLUASAN PASAR KE TERMINAL KHUSUS DAN PELABUHAN NON KOMERSIAL YANG POTENSIAL 2.1.4. MENCIPTAKAN TRANSHIPMENT DAN DIRECT CALL INTERNASIONAL UNTUK ANGKUTAN PETIKEMAS 2.1.5. MERAIH PANGSA HANDLING BONGKAR MUAT TERUTAMA PADA TERMINAL YANG DIKELOLA, BAIK MELALUI KONSESI MAUPUN KERJASAMA 2.1.6. PERLUASAN PASAR PENUNDAAN DAN PEMANDUAN 2.1.7. PERLUASAN PASAR TRUCKING & ICD 7 No. Unit Bisnis 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Makassar UTPM Balikpapan Kariangau Samarinda Palaran Bitung TPB Ambon Sorong Jayapura Tarakan Pantoloan Ternate Kendari Pare-Pare Biak Merauke Manokwari Fak-Fak Gorontalo Nunukan Toli-Toli Bontang Sengata Tanjung Redeb Pely.Kapal √ √ Fokus Bisnis Terminal Terminal Terminal Konvensional Petikemas Curah Cair √ √ √ ♥ √ Terminal Curah Terminal Penumpan √ √ √ ♥ √ ♥ √ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ ♥ √ √ √ Property √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ ` √ √ √ √ √ √ √ √ √ √ √ √ ` √ √ √ √ √ √ √ √ √ √ √ √ √ √ 27 Manado √ Ket. MULTI PURPOSE TERMINAL PETIKEMAS (Grade MULTI PURPOSE TERMINAL PETIKEMAS (Grade PROPERTY TERMINAL PETIKEMAS (Grade MULTI PURPOSE TERMINAL PETIKEMAS (Grade TERMINAL PETIKEMAS (Grade TERMINAL PETIKEMAS (Grade TERMINAL PETIKEMAS (Grade TERMINAL PETIKEMAS (Grade TERMINAL PETIKEMAS (Grade MULTI PURPOSE MULTI PURPOSE MULTI PURPOSE MULTI PURPOSE MULTI PURPOSE MULTI PURPOSE MULTI PURPOSE MULTI PURPOSE TERMINAL PENUMPANG MULTI PURPOSE MARINE SERVICE MARINE SERVICE MARINE SERVICE 1) 1) 1) 1) 2) 2) 2) 2) 2) TERMINAL PENUMPANG/PROPERTY Ket : √ ♥ Backup investasi Internal (akan focus) Tanpa Backup investasi Internal (dimaintain saja) Pemaparan RJPP Tahun 2009 - 2013 III - 7 2.2. PENGEMBANGAN & PEMBANGUNAN 2.2.1. PENGEMBANGAN TERMINAL PETIKEMAS * TERMINAL PETIKEMAS GRADE 1 : MAKASAR, BITUNG, BALIKPAPAN, SAMARINDA ALAT HANDLING : CC PANAMAX SIZE, TT, HT & CHASSIS) * TERMINAL PETIKEMAS GRADE 2 AMBON, SORONG, JAYAPURA, TARAKAN, PANTOLOAN, TERNATE, KENDARI ALAT HANDLING : CC MINI/LUFFING CRANE/HARBOUR CRANE, TT/REACHSTACKER, HT & CHASSIS) * TERMINAL PETIKEMAS KONVENSIONAL PAREPARE, BIAK, MERAUKE, MANOKWARI, NUNUKAN, FAKFAK, GORONTALO, TOLITOLI ALAT HANDLIUNG : CRANE KAPAL, REACHSTACKER, TRONTON) 2.2.2. PENGEMBANGAN TERMINAL-TERMINAL CURAH - MEKANISASI UNTUK KEGIATAN BONGKAR MUAT CURAH ; - PIPANISASI UNTUK KEGIATAN CURAH CAIR - CONVEYOR BELT SYSTEM UNTUK CURAH KERING 2.2.3. PENGEMBANGAN TERMINAL PENUMPANG - MEKANISASI KEGIATAN EMBARKASI/DEBARKASI PENUMPANG - GARBARATA SYSTEM - ESCALATOR SYSTEM 2.2.4 PEMBANGUNAN INLAND CONTAINER DEPO 2.2.5 PENGEMBANGAN ARMADA TRUCKING 2.2.6 PENGEMBANGAN ARMADA TUG BOAT 9 2.3. PENDANAAN INVESTASI 2.3.1. DANA INTERNAL PT PELINDO IV 2.3.2. PINJAMAN 2.3.3. KERJASAMA DENGAN PIHAK KE TIGA 2.3.4. APBN 10 3. LAY-OUT PELABUHAN-PELABUHAN 3.1. LAY-OUT EKSISTING DAN MASTER PLAN 2025/2030 11 CABANG MAKASSAR LAYOUT EKSISTING PELABUHAN MAKASSAR EKSISTING 2011 CABANG MAKASSAR 9436750Y 9437000Y 9437250Y MASTERPLAN 12 50 53 ,8 TEU) TEU) TEU) TEU) TEU) TEU) - 1 (6x34 - 3 (6x34 - 5 (6x33 - 7 (6x33 - 9 (6x32 - 11 (6x32 D SLOT D SLOT D SLOT D SLOT GROUN GROUN GROUN TEU) TEU) TEU) - 7 (6x32 - 9 (6x32 - 11 (6x32 D SLOT D SLOT GROUN KAWASAN UMUM DAN PERUMAHAN GROUN D SLOT D SLOT GROUN GROUN GROUN KAWASAN INDUSTRI TIDAK PENUNJANG LANGSUNG LUAS 31,77 HA TEU) KAWASAN INDUSTRI PENUNJANG LANGSUNG LUAS 15,23 HA - 12 (6x32 D SLOT TEU) TEU) TEU) - 1 (6x32 - 3 (6x32 - 5 (6x32 D SLOT D SLOT D SLOT D SLOT GROUN GROUN GROUN GROUN TEU) TEU) - 8 (6x32 - 10 (6x32 D SLOT D SLOT GROUN 500 M TEU) TEU) TEU) - 2 (6x32 - 4 (6x32 - 6 (6x32 D SLOT D SLOT D SLOT GROUN GROUN GROUN BULK GROUN BREAK GROUN 234 M 9 AN PE TIKEM AS TERMINAL PETIKEMAS LUAS 22,5 HA KAWASAN INDUSTRI PENUNJANG LANGSUNG LUAS 12,42 HA PUBLIK SERVICE LUAS 0,96 HA PUBLIK SERVICE LUAS 0,93 HA KAWASAN PERGUDANGAN III LUAS 3,8 KAWASAN PERGUDANGAN II LUAS 2,85 HA MULTIPURPOSE AREA I LUAS 3,5 HA KAWASAN PERGUDANGAN I LUAS 2,87 HA 0M 36 75 0M NAVIGASI TERM. PENUMPANG LUAS 4,0 HA PT. IKI Pangkalan Paotere PERIKANAN LANTAMAL FASHARKAN LANTAMAL PERTAMINA PEMADAM KEBAKARAN PULAU 1361,5 4 KAYANGAN 100,15 CFS 0 764750X 765000X 765250X 765500X 765750X 766000X 766250X 766500X 766750X 767000X 767250X 767500X 0.25 0.5 0.75 km 9436500Y 10 LAPANG CABANG BALIKPAPAN LAYOUT EKSISTING LAYOUT PELABUHAN SEMAYANG BALIKPAPAN EKSISTING 2011 ANG UMP PEN SUK MA PA SSE TU PIN de rm ag a pa nd u NG ER SH ELT ER Terminal Asphalt Cair 3 ± 0,0 0 2 1 5 Pulau Tukung 1 CABANG BALIKPAPAN MASTERPLAN PELABUHAN BALIKPAPAN PANGKALAN SEMAYANG 140 DM MASTER PLAN S/D TAHUN 2025 120 DM 100 DM 60 M 5 60 140 DM 84 M LOA = 120 M (KAPAL GENERAL CARGO / PETI KEMAS) 90 DM M 80 DM LOA = 100 M (KAPAL GENERAL CARGO / PETI KEMAS) M LOA = 146 ANG) PENUMP (KAPAL 70 DM 0M 02 6 M ANG) 14 MP A= LO PENU AL (KAP M 60 M 03 08 07 04 05 98.02 M 50 50 M 77.54 M 15 01 21 40 DM 22 PINTU KELUAR PENUMPANG 13 18 80 DM 10 09 17 19 26 20 JETTY TB. UNOCAL 24 23 23 ± 0,0 25 GS 0 Tanah Cadangan P. Tukung (samping SRC) seluas 2.750 m2 Terminal Asphalt Cair 30 GS 03 3 2 1 5 17 06 25 112 M 178 M 28.38 M 14 26 27 40 DM 125 M 12 18 70 DM 13 16 M 90 DM 21 100 DM 17 11 120 DM CABANG BALIKPAPAN (KAMPUNG BARU) LAYOUT EKSISTING PELABUHAN BALIKPAPAN PANGKALAN KAMPUNG BARU EKSISTING 2009 70 DM 70 DM 60 DM 60 DM 46,00 34,00 8,00 50 DM 8,00 50 DM 50,00 8,00 26,40 0 DM 20 20 30 36 CABANG BALIKPAPAN (KAMPUNG BARU) MASTERPLAN RENCANA PENGEMBANGAN JANGKA PANJANG (s/d - 2025) PELABUHAN KAMPUNG BARU-BALIKPAPAN 12 M 50 M 50 M 26 M 8M 38 M 8M 52 M 50 M CABANG BALIKPAPAN (KARIANGAU) MASTERPLAN E = 475941.504 7 50 000 44 00 0 00 202 E = 475757.870 N= 9872121. 903 E = 475972.751 N= 9872137. 882 P6: E= 475884.949 N= 9872048.899 ELV. +4.516 P5: E= 475921.092 N= 9872014.482 ELV. +4.421 E = 475917.669 N= 9872068. 637 11 0 5 00 RMH WARGA K EET AK E = 475805.783 N= 9872017. 360 J ETTY S EMENTA RA E = 475566.489 N= 9871904. 079 2 AREA PARKIR TRUK 201 84 E = 475564.222 N= 9871879. 771 AR EA PEN U MPU KAN PETIKEMAS AREA ANTRIAN T RAILLER AR EA PEN U MPU KAN PETIKEMAS 6 82 00 8 98 90 6 75 00 144 27 6 75 0 1 49 00 T REST LE 6 82 216 00 3 00 30 090 100 78 00 0 N= 9872206. 063 CABANG SAMARINDA LAYOUT EKSISTING PELABUHAN SAMARINDA eksisting 2009 117 dm 120 dm 100 dm 80 dm 125 dm 50 dm 1 2 ,3 2 ,96 ,6 26 6, 15 6 ,44 ,44 3 ,07 ,9 8 10 ,4 130 dm 4 53 ,44 96 ,40 ,44 125 dm 4 66 10,44 ,99 10,44 120 dm 10,44 43,50 10,44 10,44 135 ,46 117 dm 10,44 10,44 555 .00 96,14 10,44 10,44 5 100 dm 40, 10,44 89 34,10 8,77 63,07 7 80 dm 14,27 PIN TU NO. 2 10,4 4 0 10,4 4 10,4 4 26,80 6,96 248,65 97,7 4 POS 27,8 43,50 29,84 50 34,80 43, 12,70 19, 36 36,54 4 30, 01 14,62 ,4 37,85 10 7 37,41 3,9 ,44 ,51 10 10 17 6, 96 ,44 7,1 3 ,2 10 22, 8,70 36 10 4 9 ,4 PI 6,18 NT U NO .2 50 PO S 96 10 ,89 6, 10 48 18 8 23 ,75 ,2 8, 30 20 28 13 10 ,9 5 20 ,9 2 14 KO NG 6 PE 9 ,0 TE ,6 130 dm 27 2 21 11 33 8 6 POS 8,00 PINT U NO.1 9 MESJI D RAYA 11 12 10 SAMA RINDA CABANG SAMARINDA (PALARAN) MASTERPLAN CABANG BITUNG LAYOUT EKSISTING CABANG BITUNG MASTERPLAN PELABUHAN BITUNG master plan (S/D 2025) 300 dm 015 2007-2 LO (KAPAL A = 144 PENUM M PAN L GE 55 m (KAP 70 dm 3 13 14 AL ) 140 M AS KEM 0M = 20 PETI LOA RGO / CA GEN 2 25 60 dm 125 M KEMAS) LOA = GO / PETI GEN CAR (KAP AL Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø9 Ø 15 Ø9 POWER BOIRER HOUSE Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø 15 Ø9 IL G BUNGK & GUDAN CT WARE HOUSE REFINERY Ø 15 8 9 15 Ø 15 Ø 15 KANTOR PT JAYA TRADE 9 Ø 15 Ø9 PLANT Ø9 PROCESSING Ø 15 Ø 15 BANGUNAN SERBA GUNA PT SEMEN TONASA 6 RM Sri Rumah Dinas Jabatan General Manager PT. PELINDO IV Cab Bitung 9 Backup Area Stage 1 16 Backup Area Stage 2 Rumah Dinas Bea & Cukai ADPEL (1.122 M2) Rumah Dinas Manager Teknik Rumah Dinas Manager PBAU Rumah Dinas Bea & Cukai Rumah Rumah Dinas Dinas Manager PELKAP PBAU MESJID 13 5 RECEIVING STATION Ø 15 Lapangan Tennis 30 dm 007 3-2 50 dm 200 60 dm 13 205 M RECEIVING OUSE WAREH 10 12 11 14 250 M 22 M M 15 70 dm 4 LOA = 125 M (KAPAL GEN CARGO / PETI KEMAS) 60 M 80 dm 100 dm G) 1 13 LOA = 125 M (KAPAL GEN CARGO / PETI KEMAS) 55 m (KAPAL 145 M 15 M 2 201 125 M I KEMAS) LOA = GO / PET GEN CAR M M (KAPAL 1 17 125 M I KEMAS) PET GO / 125 M I KEMAS) LOA = GO / PET GEN CAR 150 150 dm 1 90 M LOA = 144 M (KAPAL PENUMPANG) M AS) = 125 PETI KEM LOA / RG O N CA 80 dm 10 M 275 ) LOA = 2 00 M GEN CAR (KAPAL 125 M I KEMAS) LOA = GO / PET GEN CAR (KAPA 0 7-2 55 m AS KEM 0M = 20 PETI LOA RGO / CA GEN 200 AL 2 201 CY 7 242 M 175 M 55 m 2 GS 3 x 25 (KAPAL 100 dm (KAP 200 M I KEMAS) LOA = GO / PET GEN CAR 015 125 M I KEMAS) LOA = GO / PET GEN CAR 7 201 (KAPAL 2 CY 400 M (KAPAL 200 M I KEMAS) LOA = GO / PET GEN CAR 200 M I KEMAS) LOA = GO / PET GEN CAR (KAPAL Ø9 (KAPAL 55 m 400 M 025 2015-2 Ø9 150 dm KANTOR BENGKEL 5 CABANG MANADO LAYOUT EKSISTING AN O SU NG A IT ON D CABANG MANADO MASTERPLAN PELABUHAN MANADO SU NG AI T ON DA NO master plan CABANG AMBON LAYOUT EKSISTING CATATAN DERMAGA LAPANGA LAY OUT PELABUHAN YOS SUDARSO AMBON GUDANG KANTOR TERMINA PARKIR 01. TERMINAL PEN (1.250 M2) 02. GUDANG 03. PARKIR 04. GUDANG PELA 05. KANTOR 06. GUDANG 07. KANTOR ADPE 08. GUDANG SWA 09. KPLP 10. KANTOR PELIN AMBON 11. BAK AIR (800 -150 DM - 100 DM 2 0.00 - 50 DM - 20 DM 6 4.00 1 5.00 1 05 .00 8 2.00 1 7.00 5 76 .00 1 00 .00 TE RM IN AL G UDAN G 101 1 00 .00 G UDAN G 102 1 25 .00 - 150 DM NAMA GAMBAR 2 0.00 - 100 DM 4 0.00 - 20 DM 6 .00 5 0.00 KPPP PEL IND O LAYO PELABUHA TAHUN - 10 DM DIGAMBAR AN R INA TERMINA L DIPERIKSA KE S. PE L J LN . PA LA ASM PERENCAN DWI RAHMA DIKETAHUI SM. PERENCANAAN EDY DM NU DISETUJUI DIREKTUR KOM PENGEMBANG MAX K. LUM CABANG AMBON MASTERPLAN PELABUHAN AMBON master plan (s/d tahun 2025) LOA = 144 M (KAPAL PENUM PANG) 580 M LOA = 144 M (KAPAL PENUM PANG) 780 M LOA = (KAPAL GEN CA 126 M RGO/ PE TI KEMAS ) 114 M LOA = (KAPAL GEN CA 126 M RGO/ PE TI KEMAS 86 M ) 30X2 G S 35 M 30X2 G S 30X2 G S GATE GATE GATE SKALA CABANG AMBON (SIWABESSY) LAYOUT EKSISTING LAY OUT DERMAGA SIWABESSY - AMBON EKSISTING TAHUN 2010 DE RM AG A TO NA SA DE RM AG A GU DA NG I TO NA SA GU DA NG 10 1 PO S PI NT U BE SI CABANG SORONG LAYOUT EKSISTING PELABUHAN SORONG -260DM EKSISTING TAHUN 2010 -200DM -280DM H 140 M B 1 A1 Lap. Pa 2.50 ving Block 0 m² (Kon disi Ru sak Be rat) A 14 20 M Lap. Peti Ke 5.00 0 m² mas (inve stasi 2009 ) 25 M Jala 2.5 n & L 37 a m² p. Be to 20 M n 2 3 La p Ha . Pe 1.6 mpa rkera 00 ran sa m² Ba n tu 4 14 0 12 M 0M 20 M 25 M 25 M1 2M 25 M 25 M 22 M -100DM D 13 5 Lap Ha . Perk m 13 para erasa 00 n m² n Batu G E C 6 F 12 8 14 9 7 10 11 14 15 CABANG SORONG MASTERPLAN PELABUHAN SORONG -260DM -200DM MASTERPLAN S/D TAHUN 2025 -280DM H -100DM 30 M 25 M 22 M 30 M 140 M 140 M 100 M A1 B A 100 M 16 C 4 68 M F E 11 M 55 M 88 35 M 17 24 M FUTURE RECLAMATION FOR CONTAINER YARD CABANG JAYAPURA LAYOUT EKSISTING PELABUHAN JAYAPURA EKSISTING TAHUN 2010 U 9.3 25 m m 20 m m 23 m II 30 .7 2 13 m A AG 12 82 m m RM DE 55 13 2 C4 75 m 1. U NT B 14 .6 41 5m m 10 9. 67 m 24 m I 10 36 .1 12 m C1 41 m 8m m 8 20 m 15 .3 m .3 SA WI T 19 m Ø =13,5 m T = 12,5 KAP = 1500 Ton m 29,25 14 .72 Ø =13,5 m T = 12,5 KAP = 1500 Ton 9.5 V 75,2 m TU 10 .65 PIN m 18 PT .K EL AP A 37 A m 7 77 .7 6 5 III ,6 16 .5 5m II NT U .8 TU F 41 .6 m 10 9,6 7 16 35 18 IN E 12 .3 4 P m Los Cargo PI 78 D 9 JL .K OT I 9 m 15 m m 73 m m 2 7 73 50 C2 1. 14 .2 m 18 6, PI 4 m 6m C .1 3 6m 1 2 46 21 ,2 3 88 m m C3 17 m 1.3 m m CABANG JAYAPURA MASTERPLAN PELABUHAN JAYAPURA RENCANA PENGEMBANGAN JANGKA PENDEK s.d. 2015 11 11 - 20 M 14 5 20 - 80 M 20 12 U M 13 - 13 2 M 82 GA A NG RM TI DE SIS EK 20 14 15 20 3 20 201 2-2 013 1 2 10 PINTU I 25 9 M 10 4 TU N PI 10 II PT JL .K OT I PIN TU III 4 . K E LA PA SA WI T PIN Ø =13,5 m T = 12,5 KAP = 1500 Ton TU IV 7 PIN TU V 8 6 9 Ø =13,5 m T = 12,5 KAP = 1500 Ton M 25 M CABANG TARAKAN LAYOUT EKSISTING PELABUHAN TARAKAN EKSISTING TAHUN 2009 LOA = 80 M (KAPAL GEN CARGO/PETI KEMAS) APBN 2005-2008 9M 25 M LOA = 144 M (KAPAL PENUMPANG) 15 M 251 M 130 M 6M 5M 350 M 9M 6M 100 M 10 M 9M 6M 50 M 100 M 60 M 240 M 47 M 1 124 M RENCANA REKLAMASI APBD 4 3 REKLAMASI APBD TAHUN 2008 -2009 7 2 6 5 CABANG TARAKAN MASTERPLAN PELABUHAN TARAKAN master plan (s/d tahun 2025) 120 DM 100 DM 100 M 251 M LOA = 40 M LOA = 40 M LOA = 90 M (KAPAL GEN CARGO/PETI KEMAS) LOA = 80 M (KAPAL GEN CARGO/PETI KEMAS) 20 M 14 LOA = 80 M (KAPAL GEN CARGO/PETI KEMAS) 10 M 6M 20 M 14 60 DM LOA = 144 M (KAPAL PENUMPANG) 9M 80 DM 32,5 M 32,5 M 25 M 65,0 M 170 M 40 DM 9M 350 M 20 DM 6M 0,0 M 100 M 175 M 2x22 GS 9M 2x20 GS 10 M 3 6M 2x11 GS 240 M 12 1 16 10 10 2x7 GS 47 M 13 2 7 6 15 11 5 GATE GATE 4 9 8 CABANG PANTOLOAN LAYOUT EKSISTING PELABUHAN PANTOLOAN EKSISTING 2009 -200 DM -200 DM 250 M 100 M 150 M 18 M -150 DM -100 DM -150 DM -100 DM 13 M 45 M -50 DM -50 DM 6M +0,0 DM 8M 10 M +0,0 DM +10 DM +10 DM 01 GUDANG 101 TANAH KOSONG LAPANG AN PARK IR 02 CY / TA NAH KO SONG CY EKSI SITNG 1.600 M ² GUDANG 102 CY / TA NAH CY EKSI SITNG 7.500 M ² CY EKSI SITNG 2.000 M ² CY / TA NAH KOSONG KOSONG CY EKSI SITNG 3.000 M ² CY EKSI SITNG 2.300 M ² 07 TANAH KOSONG 04 06 GATE 1 05 GATE 2 08 CABANG PANTOLOAN MASTERPLAN PELABUHAN PANTOLOAN MASTERPLAN s/d TAHUN 2025 -200 DM 18 M -200 DM -150 DM 100 M 250 M 150 M 13 M 45 M -100 DM -50 DM 6M +0,0 DM -150 DM -100 DM -50 DM 8M 10 M +0,0 DM +10 DM +10 DM 01 02 A CFS LAP. PA RKIR LAP. PA RKIR TR UK A 07 04 06 GATE 1 05 GATE 3 GATE 2 08 CABANG TERNATE LAYOUT EKSISTING PELABUHAN TERNATE EKSISTING TAHUN 2009 96 M 12 M 10 M 12 M 248 M 12 M 100 M 23 M 8M 85 M 70 M APBN THN 2008 & 2009 CABANG TERNATE MASTERPLAN PELABUHAN TERNATE MASTERPLAN S/D TAHUN 2025 96 M 12 M 10 M 12 M 100 M 35 M 12 M 248 M 23 M CABANG KENDARI LAYOUT EKSISTING PELABUHAN KENDARI EKSISTING TAHUN 2008 -100 DM -80 DM -60 DM -130 DM -140 DM -150 DM 220 50 15 -150 DM -100 DM -60 DM -80 DM CABANG KENDARI MASTERPLAN PELABUHAN KENDARI MASTER PLAN S/D 2025 -100 DM -80 DM -130 DM -140 DM -60 DM -150 DM 50 6M LOA = 12 S TI KEMA RGO/PE KAPAL CA 220 6M LOA = 12 S TI KEMA RGO/PE KAPAL CA 50 -80 DM -60 DM 7 GS 15 -100 DM 12 GS GATE GATE GATE 10 GS 22 GS 39 GS 12 GS 10 16 GS 24 GS -150 DM 8M G 99. PAN A = UM LO PEN L PA KA 16 GS 50 CABANG PARE-PARE LAYOUT EKSISTING LAYOUT PELABUHAN PARE-PARE PANGKALAN NUSANTARA EKSISITING TAHUN 2009 -150 DM -130 DM -150 DM -130 DM -100 DM LOA = (KAP AL PE 144 M NUM PANG ) BUS N TEM JALA -100 DM (KAP AL G LOA = 12 EN CA 5 RGO M / PE TI KE MAS) - 80 DM CABANG PARE-PARE LAYOUT EKSISTING CAPPA UJUNG PELABUHAN PARE-PARE 120 DM A. KANTOR PT. PELINDO IV DAN RG. TUNGGU TERMINAL PENUMPANG A1. KANTOR ADPEL PANGKALAN CAPPA UJUNG EKSISTING 2008 B. KANTOR KARANTINA TUMBUHAN C. GUDANG PADAELO D. KANTOR DW PELABUHAN 100 DM E. KANTIN DHARMA WANITA F. WARTEL G. KARANTINA HEWAN H. RUMAH TINGGAL I. LAPANGAN PARKIR J. BOLDER 80 DM K. TEMPAT PARKIR STAF ADPEL L. TEMPAT PARKIR KA.ADPEL M. TEMPAT PARKIR MOTOR J 50 DM TERMINAL PENUMPANG PERGUDANGAN J 40 DM DERMAGA EKSISTING A H BATAS-BATAS SESUAI HPL I C BATAS-BATAS SESUAI DLKR G G NAMA GAMBAR PELABUHAN PARE-PARE PANGKALAN CAPPA UJUNG TAN JL. KALIMAN M F I EKSISTING 2008 DIGAMBAR A1 H H H G ADIK ISDINIARSIH L E ARWIN K DIPERIKSA B KAN JL. TARA D ASP BIDANG PERENCANAAN ASM SIGI DAN REKAYASA EDY DM NURSEWAN LELY SUSILADI DIPERIKSA/DISETUJUI SM. PENGEMBANGAN BANGUNAN & PERALATAN BAMBANG WARSITO DIKETAHUI/DISETUJUI JL. S UL DIREKTUR PEMASARAN DAN PENGEMB. USAHA AWE SI MAX K. LUMEMPOUW 40 DM 50 DM 80 DM 100 DM LOKASI SKALA CABANG PARE-PARE MASTERPLANPELABUHAN PARE-PARE PANGKALAN NUSANTARA master plan (s/d tahun 2025) -150 DM -130 DM -150 DM -130 DM -100 DM 80 15 (KAP LOA = AL PE 144 M NUM PANG ) (KAP AL G LOA = 12 EN CA 5 RGO M / PE BUS EM NT JALA -100 DM 204.5 100 40 TI KE MAS) 20 GATE LOA = 144 M (KAPAL PENUMPANG) KANAL / DRAINASE KOTA GATE GATE - 80 DM CABANG PARE-PARE MASTERPLAN CAPPA UJUNG PELABUHAN PARE-PARE PANGKALAN CAPPA UJUNG 120 DM master plan (s/d tahun 2025) 100 50 LOA = 126 M KEMAS) CARGO/PETI (KAPAL GEN 50 20 15 LOA = 126 M KEMAS) CARGO/PETI (KAPAL GEN 80 DM D 20,5 20 8 32,5 40 DM 12,00 D 7,00 B D 12,00 A G 15 X 2 GS 2.5 0 50 DM C 11 X 2 GS 12,00 12 X 2 GS 8,00 6 X 2 GS 7 X 2 GS C C E 4 12,00 F 6 H 7.70 GATE 6 KAN JL. TARA 7.75 D B 4.95 6.80 6 5.40 10.00 5 6 JL. S ULA WES I 5 B REKLAMASI UNTUK LAP. PENUMPUKAN PETIKMAS 100 DM CABANG BIAK LAYOUT EKSISTING PELABUHAN BIAK EKSISTING TAHUN 2010 150 dm 150 dm 120 dm 60 M 142 M 120 dm 120 M 100 dm 20 M 11 M 100 dm 38 M 34 M 11 M 50 dm 08 03 07 01 22 06 23 27 09 26 24 25 10 05 17 19 12 15 14 18 04 13 11 21 50 dm 02 20 70 dm 70 dm 12 M 33 M 16 CABANG BIAK MASTERPLAN PELABUHAN BIAK MASTER PLAN (S/D TAHUN 2025) 150 dm 150 dm 472 M 50 M 120 dm 142 M 60 M 100 dm LOA = 126 M (KAPAL GEN CAR/PETI KEMAS) 15 M 02 07 70 dm 120 dm 50 M 20 M 34 M 37.7 M 70 M 33 M 50 M LOA = 126 M (KAPAL GEN CAR/PETI KEMAS) 14.4 M 10 10 M 100 dm 15 M LOA = 144 M (KAPAL PENUMPANG) 120 M 09 01 15 M 30X2 GS 18X2 GS 03 50 dm 03 30X2 GS 08 30X2 GS 06 04 06 05 GATE GATE GATE GATE 10 70 dm 50 dm CABANG MERAUKE LAYOUT EKSISTING PELABUHAN MERAUKE EKSISTING 2009 158 M 84 M 15 M 3M 74 M 65 M 8M TRESTLE 1 93,5 M 90,5 M 93 M TRESTLE 2 65 M 10 M 164 M 21 M 71,34 M AREA TANAH = 6.910 M² 66 M PAVING = 1.500 M² 25 M 86 M PAVING = 2.150 M² GAPURA 4M 3M CABANG MERAUKE MASTERPLAN PELABUHAN MERAUKE master plan (s/d tahun 2025) 158 M LOA = 99,8 M (KAPAL GEN CAR/ PETI KEMAS) 50 M LOA = 99,8 M (KAPAL PENUMPANG) 20 M 100 M 93 M 10 M 10 M 62 M 164 M 22X2 GS 25 M 2 52,353 AREA TANAH = 6.910 M² 30 M CABANG MANOKWARI LAYOUT EKSISTING PELABUHAN MANOKWARI EKSISTING TAHUN 2009 - 300 dm - 250 dm - 200 dm - 100 dm 66 - 150 dm 90 M 20 M 60 62 M 80 M 10 M 15 M 15 M 20 M 50 M 50 M N NA BU M I T NA 10 15 CA 20 N RE 14 30 M 70 M M - 50 dm 73 M M 4 13 10 19 12 9 18 9 21 21 16 5 17 1 20 8 3 4 22 11 21 2 GATE 6 7 11 - 00 dm CABANG MANOKWARI MASTERPLAN PELABUHAN MANOKWARI MASTERPLAN S/D TAHUN 2025 - 300 dm - 250 dm - 200 dm - 100 dm 0M 10 - 150 dm 66 M - 50 dm 30 M 70 M 90 M 50 M 50 M 20 M 15 M 10 20 M 15 14 4 13 5 18 16 25 5 17 1 26 4 11 7 2 25 6 20 8 23 22 GATE 19 12 9 3 11 - 00 dm CABANG NUNUKAN LAYOUT EKSISTING CABANG NUNUKAN MASTERPLAN PELABUHAN NUNUKAN MASTER PLAN (S/D TAHUN 2025) 300 35 100 50 10 8 100 50 35 LOA = 144 M (KAPAL PENUMPANG) LOA = 126 M (KAPAL GEN CAR/PETI KEMAS) 15 20 13 13 50 135 2 17,25 1 40 GS 40 4 7 12 2 20 46 GS 25 14 GS 10 3 30 100 3 40 3 4 20 4 28 GS 8 6 5 4 11 CABANG FAK-FAK LAYOUT EKSISTING PELABUHAN fak-fak eksisting tahun 2008 30 DM 50 DM 70 DM 90 DM 100 DM 300 DM 59 M 100 M 45 M E 55 M I 33 M 100 M A B 67M 70 DM F C D G H J CABANG FAK-FAK MASTERPLAN PELABUHAN FAK-FAK master plan (s/d tahun 2025) 30 DM 50 DM 70 DM 90 DM 100 DM 300 DM 45 M (KA PAL 59 M L GEN OA = 1 CAR 26 M GO/ PET I KE MAS ) 55 M 200 M 50 M F (KA LOA = PAL 1 PEN 44 M U MP AN A M M 30 M G) 10 45 50 M J C D E L 30 M G J 15 20 M M 70 DM I B H J G CABANG GORONTALO LAYOUT EKSISTING PELABUHAN GORONTALO EKSISTING TAHUN 2009 39 M 15 M 15 M M ,5 M 26 5M ,5 10 3 18 M A II AG RM DE M 40 A A II AG RM DE 60 M 11 M 5M 50 M BOLDER LAPANGAN PENUMPUKAN NGAN LAPA RAN ANTO PERK MENARA SUAR NG GUDA DERMAGA I GUDANG KANTOR PELINDO N MPUKA PENU CABANG GORONTALO MASTERPLAN PELABUHAN GORONTALO MASTERPLAN (s/d TAHUN 2025) 50 M 15 M 26 M M 18 M BOLDER 40 AC CE SS RO AD 80 M A II AG RM 60 M DE 11 M 6M 10.075 15 M 35 15 M ,5 50 M ,5 ARE PENGEM A RENCANA BANGAN PENUMPUK LAPANGAN AN- I 10 AREA REN PENGEM CANA BANGA PENUM N LAPANGAN PUKAN - II M A A II AG RM DE x 10 0 LAPANGAN PENUMPUKAN NGAN LAPA PE MENARA SUAR NG GUDA DERMAGA I GUDANG KANTOR PELINDO N TORA RKAN PENU N MPUKA CABANG TOLI-TOLI LAYOUT EKSISTING PELABUHAN TOLI-TOLI EKSISTING TAHUN 2009 81.40 13.00 15 50 40 05 01 02 13 05 09 08 09 09 07 05 03 06 04 05 04 CABANG TOLI-TOLI LAYOUT PENGEMBANGAN PELABUHAN TOLI-TOLI RENCANA s/d TAHUN 2025 81.40 100 10 13.00 15 50 40 05 01 02 13 05 2011 07 07 07 06 05 03 2010 04 05 04 3. LAY-OUT PELABUHAN-PELABUHAN 3.2. RENCANA JANGKA PENDEK 2011 - 2015 58 KEGIATAN-KEGIATAN STRATEGIS NO PELABUHAN 1 PEMBANGUNAN MAKASSAR NEW PORT TAHAP I TAHUN RUPIAH SUMBER DANA 2012 - 2014 1.500 MILYAR APBN/ KERJASAMA 2012 - 2013 30 MILYAR INTERNAL/ PINJAMAN 2012 - 2013 55 MILYAR APBN/ INTERNAL - DREDGING, REKLAMASI, TALUD, JALAN AKSES - DERMAGA, LAPANGAN PENUMPUKAN, TERMINAL PENUMPANG, FASILITAS PENDUKUNG, UTILITAS LAINNYA 2 PELABUHAN MAKASSAR EKSISTING - PENGADAAN PERALATAN BONGKAR MUAT PETIKEMAS UNTUK ICD (TT, RS & HT) 3 PELABUHAN PALARAN SAMARINDA -TERMINAL PENUMPANG 1000 X 2 M2 (2 LANTAI) -DERMAGA MULTI PURPOSE 100 X 15 M DAN TRESTEL 2 X 74 X 10 M - PEMBANGUNAN KANTOR PT. PELINDO IV NO PELABUHAN 4 TPK KARIANGAU TAHUN 2012 PELABUHAN BITUNG INTERNAL/ KERJASAMA/ PINJAMAN 55 MILYAR KERJASAMA/ PINJAMAN 2012 – 2013 110 MILYAR INTERNAL/ APBN/ PINJAMAN 2012 – 2013 120 MILYAR APBN 2011-2012 -PENGADAAN PERALATAN BONGKAR MUAT UNTUK ICD (TT, RS & SIDE LOADER) - PENGADAAN PERALATAN BONGKAR MUAT PETIKEMAS (CC) 6 PELABUHAN SORONG - REKLAMASI UNTUK LAPANGAN PENUMPUKAN (ICD) 10.000 M2 - PEMBANGUNAN DERMAGA PETIKEMAS 100 X 35 M DAN TRESTEL - PENGADAAN REACHSTACKER DAN HEADTRUCK + CHASSIS UNTUK ICD 7 PELABUHAN AMBON - EXTENTION DERMAGA 100 X 35 M - REKLAMASI SUMBER DANA 150 MILYAR - KANTOR TPK 3.500 M2 - LAPANGAN PENUMPUKAN -PENGADAAN PERALATAN BONGKAR MUAT PETIKEMAS (CC, TT, RS, HT, FL) 5 RUPIAH NO PELABUHAN TAHUN RUPIAH SUMBER DANA 8 PELABUHAN JAYAPURA - SHEET PILE 60 M’ - REKLAMASI 5.000 M3 - PEMBANGUNAN DERMAGA 100 X 12 M UNTUK KAPAL PENUMPANG - REPLACEMENT DERMAGA 100 X 35 M UNTUK PETIKEMAS - PENGADAAN PERALATAN BONGKAR MUAT PETIKEMAS (CC, TT, RS & HT) 2012-2015 270 MILYAR INTERNAL/ APBN/ PINJAMAN 9 PELABUHAN TARAKAN - REKLAMASI & PEMBANGUNAN LAPANGAN PENUMPUKAN 2 HA.30.000 M3 - PENGERUKAN KOLAM PELABUHAN 2012 - 2015 15 MILYAR KERJASAMA/ INTERNAL 10 PELABUHAN MANOKWARI - PEMBANGUNAN CONTAINER YARD 2000 M2 - REKLAMASI 2012-2013 5 MILYAR KERJASAMA/ INTERNAL 4. DAFTAR DUKUNGAN INFRASTRUKTUR LAINNYA & KESIAPAN PERENCANAAN NO PELABUHAN JALAN AKSES HARBOUR ROAD KETERP ADUAN DG RENC. TATA RUANG SDM TEKNOLOGI SISTEM OPERASI MP/FS DED 1 MAKASSAR TERBATAS ADA YA ADA SIAP MP/FS ADA 2 TPM TERBATAS ADA YA ADA SIAP MP/FS ADA 3 BALIKPAPAN TERBATAS TIDAK ADA TIDAK ADA SIAP FS - 4 TP KARIANGAU BAIK ADA YA ADA SIAP FS ADA 5 SAMARINDA/ PALARAN BAIK ADA YA ADA SIAP MP/FS ADA 6 BITUNG BAIK ADA YA ADA SIAP - - 7 TPB BAIK ADA YA ADA SIAP MP/FS ADA 8 AMBON TERBATAS ADA YA ADA SIAP - ADA 9 SORONG TERBATAS ADA YA ADA SIAP - ADA 10 JAYAPURA TERBATAS ADA YA ADA SIAP - ADA NO PELABUHAN JALAN AKSES HARBOUR ROAD KETERP ADUAN DG RENC. TATA RUANG SDM TEKNOLOGI SISTEM OPERASI MP/FS DED 11 TARAKAN TERBATAS ADA YA ADA SIAP FS ADA 12 PANTOLOAN BAIK ADA YA ADA SIAP - ADA 13 TERNATE TERBATAS ADA YA ADA SIAP - - 14 KENDARI TERBATAS ADA YA ADA SIAP - - 15 BIAK BAIK ADA YA ADA SIAP - - 16 PAREPARE TERBATAS ADA YA ADA SIAP - - 17 MANOKWARI BAIK ADA YA ADA SIAP - - 18 GORONTALO BAIK ADA YA ADA SIAP - ADA 19 FAKFAK TERBATAS ADA YA ADA SIAP - - 20 MERAUKE BAIK ADA YA ADA SIAP - - 21 NUNUKAN TERBATAS ADA YA ADA SIAP - - 22 TOLI TOLI BAIK ADA YA ADA SIAP - - 23 MANADO TERBATAS ADA YA ADA SIAP - ADA 63 “Kemajuan mustahil terjadi tanpa perubahan, dan mereka yang tidak bisa mengubah pemikirannya tak akan bisa mengubah apapun.” -George Bernard Shaw, Dramawan Inggris. PT PELABUHAN INDONESIA IV (PERSERO) Jl. Soekarno No. 1 Makassar 90174 “PROMOTE EASTERN INDONESIA” 64